HODGES, THOMAS

Operated by HODGES, TOMMIE ANN (P-5 390835) in the WISE COUNTY REGULAR field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 23612District 09Field 98246001OilCasinghead gasSaveExport
Value, all time
$55 k
Jan 1993 – Feb 2010
Value, last 12 filed months
$0
at the published price for each month
Months reported
206
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 137 leases and 150 wells, and the rule below applies to all of them.

Discovered
1947-12-11
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: TRANS. FROM DIST. 7-B 4/49

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition2,894 bbl$53,973
Casinghead gasProduction193 Mcf$765
Total$54,739

47 Mcf of this lease's gas, across 47 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.3599, -97.6214. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.35987, -97.62145 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,300 ft
1 wells filed one
Completion to plug
25.4 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,300 ft.

Completions filed
Sep 1983
1 of 1 wells
Plug dates filed
Feb 2009
1 of 1 wells

Last completion to plug: a median of 25.4 years across the 1 well that filed both dates, with the middle half between 25.4 years and 25.4 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4973260616,300 ftSep 1983Feb 2009Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (206)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

206 months

Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 200926132.814.63$858
Jan 20090135.865.37$5
Dec 20080137.105.98$6
Nov 20080155.496.86$7
Oct 20080175.246.92$7
Sep 200801101.767.88$8
Aug 200801114.228.48$8
Jul 200801131.0811.39$11
Jun 200801131.3313.03$13
May 200801123.1711.57$12
Apr 200801110.3110.45$10
Mar 200801101.909.66$10
Feb 20080192.538.77$9
Jan 20080190.388.21$8
Dec 20070188.337.30$7
Nov 20070191.677.29$7
Oct 20070182.856.92$7
Sep 20070175.846.24$6
Aug 20070169.066.39$6
Jul 20070170.906.39$6
Jun 20070162.007.55$8
May 20070158.747.85$8
Apr 20070159.617.81$8
Mar 20070156.927.30$7
Feb 20070155.108.22$8
Jan 20070150.306.73$7
Dec 20060156.656.92$7
Nov 20060154.207.62$8
Oct 20060154.906.01$6
Sep 20060160.085.04$5
Aug 20060168.717.34$7
Jul 20060169.376.34$6
Jun 20060166.286.38$6
May 20060166.016.42$6
Apr 20060164.397.36$7
Mar 20060156.707.08$7
Feb 20060157.597.75$8
Jan 20060160.598.93$9
Dec 20050154.9413.42$13
Nov 20050154.6910.59$11
Oct 20050158.3413.80$14
Sep 20050161.4512.08$12
Aug 20050161.519.80$10
Jul 20050155.697.84$8
Jun 20050152.337.38$7
May 20050145.226.65$7
Apr 20050149.207.36$7
Mar 20050150.377.15$7
Feb 20050145.226.31$6
Jan 20050143.166.32$6
Dec 20040139.866.75$7
Nov 20040145.286.33$6
Oct 20040149.706.52$7
Sep 20040143.245.28$5
Aug 20040142.375.55$6
Jul 20040138.286.08$6
Jun 20040136.106.43$6
May 20040137.486.49$6
Apr 20040134.475.86$6
Mar 20040134.365.53$6
Feb 20040132.455.51$6
Jan 20040132.036.30$6
Dec 20030130.266.30$6
Nov 20030128.804.60$5
Oct 20030128.174.76$5
Sep 20030126.314.75$5
Aug 20030129.765.13$5
Jul 20030129.415.17$5
Jun 20030128.565.98$6
May 20030126.595.97$6
Apr 20030126.675.41$5
Mar 20030131.146.10$6
Feb 20030133.487.93$8
Jan 20030130.315.58$6
Dec 20020126.914.85$5
Nov 20020124.664.14$4
Oct 2002164126.464.23$4,344
Sep 20020127.443.64$4
Aug 20020125.963.16$3
Jul 20020124.583.06$3
Jun 20020123.733.34$3
May 20020124.663.58$4
Apr 20020123.653.51$4
Mar 20020122.003.10$3
Feb 20020118.222.38$2
Jan 20020117.172.38$2
Dec 20010116.932.36$2
Nov 20010118.072.41$2
Oct 20010119.782.53$3
Sep 2001141124.262.25$3,423
Aug 20010124.873.05$3
Jul 20010123.933.20$3
Jun 20010124.563.82$4
May 20010125.524.31$4
Apr 20010124.685.34$5
Mar 20010124.545.38$5
Feb 20010127.755.77$6
Jan 20010127.478.40$8
Dec 2000138126.889.12$3,719
Nov 20000132.215.66$6
Oct 20000131.235.15$5
Sep 20000131.875.19$5
Aug 20000129.644.54$5
Jul 20000128.534.09$4
Jun 20000129.304.40$4
May 20000127.263.68$4
Apr 2000127124.513.12$3,116
Mar 20000128.422.86$3
Feb 20000127.622.73$3
Jan 20000125.272.48$2
Dec 19990124.282.42$2
Nov 19990123.192.43$2
Oct 1999169120.982.80$3,548
Sep 19990121.752.62$3
Aug 19990119.262.88$3
Jul 19990117.892.37$2
Jun 19990115.942.36$2
May 19990115.792.32$2
Apr 19990115.102.21$2
Mar 1999144112.471.84$1,798
Feb 1999019.981.82$2
Jan 19990110.381.90$2
Dec 1998019.201.77$2
Nov 19980110.892.19$2
Oct 19980112.421.97$2
Sep 19980112.592.08$2
Aug 19980111.301.91$2
Jul 19980111.742.24$2
Jun 19980111.242.24$2
May 1998142112.622.21$1,794
Apr 19980113.042.51$3
Mar 19980112.802.31$2
Feb 19980113.952.30$2
Jan 19980114.702.15$2
Dec 19970116.322.41$2
Nov 19970118.193.09$3
Oct 1997134119.253.15$2,583
Sep 19970117.742.95$3
Aug 19970117.862.55$3
Jul 19970117.582.25$2
Jun 19970117.242.26$2
May 19970118.972.31$2
Apr 1997148117.882.08$2,648
Mar 19970118.951.94$2
Feb 19970120.492.21$2
Jan 19970123.483.54$4
Dec 19960123.32$0
Nov 19960121.97$0
Oct 1996175123.31$4,079
Sep 19960122.22$0
Aug 19960120.26$0
Jul 19960119.55$0
Jun 19960118.73$0
May 19960119.43$0
Apr 19960121.51$0
Mar 1996140119.38$2,713
Feb 19960116.98$0
Jan 19960117.07$0
Dec 19950117.19$0
Nov 1995141116.00$2,256
Oct 19950115.43$0
Sep 19950116.18$0
Aug 19950115.92$0
Jul 19950115.24$0
Jun 1995147116.41$2,412
May 19950117.56$0
Apr 19950117.73$0
Mar 19950116.44$0
Feb 1995161116.58$2,669
Jan 19950115.92$0
Dec 19940115.03$0
Nov 19940115.90$0
Oct 1994169115.58$2,633
Sep 19940115.29$0
Aug 19940116.13$0
Jul 19940017.56$0
Jun 19940117.09$0
May 19940115.88$0
Apr 1994158114.14$2,234
Mar 19940112.46$0
Feb 19940112.50$0
Jan 19940112.66$0
Dec 1993162112.33$1,997
Nov 19930114.49$0
Oct 19930115.85$0
Sep 19930115.03$0
Aug 1993157115.66$2,459
Jul 19930115.46$0
Jun 19930116.79$0
May 19930117.68$0
Apr 1993151118.05$2,726
Mar 19930118.14$0
Feb 19930117.90$0
Jan 19930116.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2009 — as filed, then multipliedworked
Oil                   26 bbl  × $ 32.81 =       $853
Casinghead gas         1 Mcf  × $  4.63 =         $5

────────────────────────────────────────────────────
Month total                                     $858

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/O/23612 is the state's own key, not one this site invented.