JAMISON, A.

Operated by BLS PRODUCTION CO., INC. (P-5 76385) in the MACKOY (STRAWN) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 23675District 09Field 56492250OilCasinghead gasSaveExport
Value, all time
$414 k
Jan 1993 – Sep 2009
Value, last 12 filed months
$44 k
at the published price for each month
Months reported
201
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 15 leases and 23 wells, and the rule below applies to all of them.

Discovered
1953-12-13
as the register files it
Field class
Oil
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition12,532 bbl$413,906
Casinghead gasProduction21 Mcf$0
Total$413,906

21 Mcf of this lease's gas, across 21 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.6164, -96.8974. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.61643, -96.89744 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
4,200 ft
1 wells filed one
Completion to plug
25.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,200 ft.

Completions filed
Sep 1983
1 of 1 wells
Plug dates filed
Jun 2009
1 of 1 wells

Last completion to plug: a median of 25.8 years across the 1 well that filed both dates, with the middle half between 25.8 years and 25.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1810061114,200 ftSep 1983Jun 2009Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (201)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

201 months

Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 2009145066.163.90$9,593
May 20090054.743.93$0
Apr 2009122046.773.59$5,706
Mar 20090042.144.06$0
Feb 2009123032.814.63$4,036
Jan 2009125035.865.37$4,483
Dec 2008125037.105.98$4,638
Nov 2008121055.496.86$6,714
Oct 2008124075.246.92$9,330
Sep 20081220101.767.88$12,415
Aug 200800114.228.48$0
Jul 20081220131.0811.39$15,992
Jun 200800131.3313.03$0
May 20081210123.1711.57$14,904
Apr 20081240110.3110.45$13,678
Mar 200800101.909.66$0
Feb 2008124092.538.77$11,474
Jan 2008122090.388.21$11,026
Dec 2007125088.337.30$11,041
Nov 2007125091.677.29$11,459
Oct 2007121082.856.92$10,025
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 2006120056.656.92$6,798
Nov 20060054.207.62$0
Oct 2006122054.906.01$6,698
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 2006124066.016.42$8,185
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 2006118057.597.75$6,796
Jan 20060060.598.93$0
Dec 2005119054.9413.42$6,538
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 2005123061.4512.08$7,558
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 2005120052.337.38$6,280
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 2005119045.226.31$5,381
Jan 20050043.166.32$0
Dec 2004122039.866.75$4,863
Nov 20040045.286.33$0
Oct 2004122049.706.52$6,063
Sep 20040043.245.28$0
Aug 2004122042.375.55$5,169
Jul 20040038.286.08$0
Jun 2004123036.106.43$4,440
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 2004119032.036.30$3,812
Dec 20030030.266.30$0
Nov 2003120028.804.60$3,456
Oct 20030028.174.76$0
Sep 2003119026.314.75$3,131
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 2003125028.565.98$3,570
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 2003122031.146.10$3,799
Feb 20030033.487.93$0
Jan 2003119030.315.58$3,607
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 20020026.464.23$0
Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 2002123023.653.51$2,909
Mar 20020022.003.10$0
Feb 2002125018.222.38$2,278
Jan 2002120017.172.38$2,060
Dec 20010016.932.36$0
Nov 2001123018.072.41$2,223
Oct 2001120019.782.53$2,374
Sep 20010024.262.25$0
Aug 2001126024.873.05$3,134
Jul 2001125023.933.20$2,991
Jun 2001249024.563.82$6,115
May 20010025.524.31$0
Apr 2001123024.685.34$3,036
Mar 2001121024.545.38$2,969
Feb 2001138027.755.77$3,830
Jan 2001141027.478.40$3,873
Dec 2000139026.889.12$3,736
Nov 2000126032.215.66$4,058
Oct 2000136031.235.15$4,247
Sep 2000134031.875.19$4,271
Aug 2000134029.644.54$3,972
Jul 2000128028.534.09$3,652
Jun 2000138029.304.40$4,043
May 2000135027.263.68$3,680
Apr 2000136024.513.12$3,333
Mar 2000138028.422.86$3,922
Feb 20000027.622.73$0
Jan 2000124025.272.48$3,133
Dec 19990024.282.42$0
Nov 1999125023.192.43$2,899
Oct 19990020.982.80$0
Sep 1999138021.752.62$3,002
Aug 19990019.262.88$0
Jul 1999126017.892.37$2,254
Jun 1999129015.942.36$2,056
May 19990015.792.32$0
Apr 19990015.102.21$0
Mar 1999135012.471.84$1,683
Feb 1999009.981.82$0
Jan 1999135010.381.90$1,401
Dec 199813809.201.77$1,270
Nov 19980010.892.19$0
Oct 1998118012.421.97$1,466
Sep 19980012.592.08$0
Aug 1998133011.301.91$1,503
Jul 1998137011.742.24$1,608
Jun 19980011.242.24$0
May 19980012.622.21$0
Apr 1998139013.042.51$1,813
Mar 1998130012.802.31$1,664
Feb 1998128013.952.30$1,786
Jan 19980014.702.15$0
Dec 1997131016.322.41$2,138
Nov 19970018.193.09$0
Oct 1997142019.253.15$2,734
Sep 1997143017.742.95$2,537
Aug 19970017.862.55$0
Jul 1997142017.582.25$2,496
Jun 19970017.242.26$0
May 19970018.972.31$0
Apr 19970017.882.08$0
Mar 19970018.951.94$0
Feb 19970020.492.21$0
Jan 19970023.483.54$0
Dec 19960023.32$0
Nov 19960021.97$0
Oct 19960023.31$0
Sep 19960022.22$0
Aug 19960020.26$0
Jul 19960019.55$0
Jun 19960018.73$0
May 19960019.43$0
Apr 19960021.51$0
Mar 19960019.38$0
Feb 19960016.98$0
Jan 19960017.07$0
Dec 19950017.19$0
Nov 19950016.00$0
Oct 199577015.43$1,188
Sep 199565016.18$1,052
Aug 199594015.92$1,496
Jul 199565015.24$991
Jun 1995105016.41$1,723
May 19950017.56$0
Apr 19950017.73$0
Mar 19950016.44$0
Feb 1995121016.58$2,006
Jan 19950015.92$0
Dec 19940015.03$0
Nov 199432015.90$509
Oct 199455015.58$857
Sep 1994100115.29$1,529
Aug 199498116.13$1,581
Jul 199489117.56$1,563
Jun 1994122117.09$2,085
May 199485115.88$1,350
Apr 199443114.14$608
Mar 1994127112.46$1,582
Feb 1994104112.50$1,300
Jan 1994130112.66$1,646
Dec 199392112.33$1,134
Nov 1993115114.49$1,666
Oct 1993144115.85$2,282
Sep 1993138115.03$2,074
Aug 1993128115.66$2,004
Jul 1993138115.46$2,133
Jun 1993131116.79$2,199
May 199391117.68$1,609
Apr 1993120118.05$2,166
Mar 1993132118.14$2,394
Feb 1993127117.90$2,273
Jan 1993124116.93$2,099

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2009 — as filed, then multipliedworked
Oil                  145 bbl  × $ 66.16 =     $9,593
Casinghead gas         0 Mcf  × $  3.90 =         $0

────────────────────────────────────────────────────
Month total                                   $9,593

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/O/23675 is the state's own key, not one this site invented.