SHUMAKE

Operated by EXLCO, INC. (P-5 256985) in the CLAY COUNTY REGULAR field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 23891District 09Field 18707001OilCasinghead gasSave
Value, all time
$2 k
Jan 1993 – Apr 2004
Value, last 12 filed months
$1 k
at the published price for each month
Months reported
136
no gaps in the span
Streams
2
oil, casinghead gas

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition73 bbl$1,637
Casinghead gasProduction70 Mcf$176
Total$1,813

20 Mcf of this lease's gas, across 20 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (3)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 34.0384, -98.3536. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.2 miles.

34.03829, -98.35354 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
3 of 3 wells
With a plug date
100.0%
3 of 3 wells
Median depth
1,369 ft
3 wells filed one
Completion to plug
2.8 years
median over 3 wells

What the state filed about each well

On the RRC proration schedule
3100.0%
A plug date is filed
3100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
3100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 1,365 and 1,419 ft, median 1,369 ft, over the 3 wells that filed a depth.

Completions filed
Nov 1983 – Nov 1984
3 of 3 wells
Plug dates filed
Jul 1986 – Dec 2003
3 of 3 wells

Last completion to plug: a median of 2.8 years across the 3 wells that filed both dates, with the middle half between 2.3 years and 11.4 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

3 wells

42-077332383A1,369 ftNov 1984Jul 1986Yes
42-0773322411,419 ftNov 1983Dec 2003Yes
42-0773322521,365 ftNov 1983Aug 1986Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (136)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

136 months

Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 200431032.455.51$1,006
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 20030130.315.58$6
Dec 20020126.914.85$5
Nov 20020124.664.14$4
Oct 20020126.464.23$4
Sep 20020127.443.64$4
Aug 20020125.963.16$3
Jul 20020124.583.06$3
Jun 20020123.733.34$3
May 20020124.663.58$4
Apr 20020123.653.51$4
Mar 20020122.003.10$3
Feb 20020118.222.38$2
Jan 20020117.172.38$2
Dec 20010116.932.36$2
Nov 20010118.072.41$2
Oct 20010119.782.53$3
Sep 20010124.262.25$2
Aug 20010124.873.05$3
Jul 20010123.933.20$3
Jun 20010124.563.82$4
May 20010025.524.31$0
Apr 20010124.685.34$5
Mar 20010124.545.38$5
Feb 20010127.755.77$6
Jan 20010127.478.40$8
Dec 20000126.889.12$9
Nov 20000132.215.66$6
Oct 20000131.235.15$5
Sep 20000131.875.19$5
Aug 20000129.644.54$5
Jul 20000128.534.09$4
Jun 20000129.304.40$4
May 20000127.263.68$4
Apr 20000024.513.12$0
Mar 20000128.422.86$3
Feb 20000027.622.73$0
Jan 20000125.272.48$2
Dec 19990024.282.42$0
Nov 19990123.192.43$2
Oct 19990020.982.80$0
Sep 19990121.752.62$3
Aug 19990019.262.88$0
Jul 19990117.892.37$2
Jun 19990015.942.36$0
May 19990115.792.32$2
Apr 19990015.102.21$0
Mar 19990112.471.84$2
Feb 1999009.981.82$0
Jan 19990110.381.90$2
Dec 1998009.201.77$0
Nov 19980110.892.19$2
Oct 19980012.421.97$0
Sep 19980112.592.08$2
Aug 19980011.301.91$0
Jul 19980111.742.24$2
Jun 19980011.242.24$0
May 19980012.622.21$0
Apr 199824113.042.51$315
Mar 19980012.802.31$0
Feb 19980113.952.30$2
Jan 19980014.702.15$0
Dec 19970116.322.41$2
Nov 19970018.193.09$0
Oct 19970119.253.15$3
Sep 19970017.742.95$0
Aug 19970117.862.55$3
Jul 19970017.582.25$0
Jun 19970117.242.26$2
May 19970018.972.31$0
Apr 19970017.882.08$0
Mar 19970118.951.94$2
Feb 19970020.492.21$0
Jan 19970023.483.54$0
Dec 19960023.32$0
Nov 19960021.97$0
Oct 19960123.31$0
Sep 19960022.22$0
Aug 19960120.26$0
Jul 19960019.55$0
Jun 19960118.73$0
May 19960019.43$0
Apr 19960021.51$0
Mar 19960019.38$0
Feb 19960016.98$0
Jan 19960017.07$0
Dec 19950117.19$0
Nov 19950016.00$0
Oct 19950015.43$0
Sep 19950116.18$0
Aug 19950015.92$0
Jul 19950115.24$0
Jun 19950016.41$0
May 19950117.56$0
Apr 19950017.73$0
Mar 19950116.44$0
Feb 19950016.58$0
Jan 19950115.92$0
Dec 19940015.03$0
Nov 19940015.90$0
Oct 19940115.58$0
Sep 19940015.29$0
Aug 19940016.13$0
Jul 19940117.56$0
Jun 19940017.09$0
May 19940115.88$0
Apr 19940014.14$0
Mar 19940112.46$0
Feb 19940012.50$0
Jan 19940112.66$0
Dec 19930012.33$0
Nov 19930114.49$0
Oct 19930015.85$0
Sep 19930115.03$0
Aug 19930015.66$0
Jul 19930115.46$0
Jun 19930016.79$0
May 199318117.68$318
Apr 19930018.05$0
Mar 19930118.14$0
Feb 19930017.90$0
Jan 19930116.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2004 — as filed, then multipliedworked
Oil                   31 bbl  × $ 32.45 =     $1,006
Casinghead gas         0 Mcf  × $  5.51 =         $0

────────────────────────────────────────────────────
Month total                                   $1,006

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/O/23891 is the state's own key, not one this site invented.