JOHNSON, E. J.

Operated by MASADA OIL & GAS (P-5 531347) in the GROESBECK CREEK (CHAPPEL) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 25580District 09Field 37114500NGPA filingOilCasinghead gasSaveExport
Value, all time
$83 k
Jan 1993 – Nov 1997
Value, last 12 filed months
$4 k
at the published price for each month
Months reported
59
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 12 leases and 15 wells, and the rule below applies to all of them.

Discovered
1977-05-02
as the register files it
Field class
Oil
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres.

The Commission's schedule remark for this field reads: FIELDWIDE MER ADOPTED PER DKT #9-95374 EFFECTIVE 3/4/91.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition5,160 bbl$82,778
Casinghead gasProduction6,513 Mcf$0
Total$82,778

6,513 Mcf of this lease's gas, across 31 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 34.3396, -99.6856. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

34.33962, -99.68559 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
8,995 ft
1 wells filed one
Completion to plug
12.1 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,995 ft.

Completions filed
Aug 1985
1 of 1 wells
Plug dates filed
Sep 1997
1 of 1 wells

Last completion to plug: a median of 12.1 years across the 1 well that filed both dates, with the middle half between 12.1 years and 12.1 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1973086318,995 ftAug 1985Sep 1997Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (59)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

59 months

Nov 19970018.193.09$0
Oct 19970019.253.15$0
Sep 19970017.742.95$0
Aug 19970017.862.55$0
Jul 19970017.582.25$0
Jun 19970017.242.26$0
May 19970018.972.31$0
Apr 19970017.882.08$0
Mar 1997212018.951.94$4,017
Feb 19970020.492.21$0
Jan 19970023.483.54$0
Dec 19960023.32$0
Nov 19960021.97$0
Oct 19960023.31$0
Sep 19960022.22$0
Aug 19960020.26$0
Jul 19960019.55$0
Jun 19960018.73$0
May 19960019.43$0
Apr 19960021.51$0
Mar 19960019.38$0
Feb 19960016.98$0
Jan 19960017.07$0
Dec 19950017.19$0
Nov 19950016.00$0
Oct 19950015.43$0
Sep 19950016.18$0
Aug 19950015.92$0
Jul 199509015.24$0
Jun 199519615716.41$3,216
May 199518120517.56$3,178
Apr 199536817817.73$6,525
Mar 1995021816.44$0
Feb 1995026716.58$0
Jan 1995022315.92$0
Dec 199418213215.03$2,735
Nov 1994012015.90$0
Oct 199418223615.58$2,836
Sep 199417755415.29$2,706
Aug 1994037216.13$0
Jul 19941718317.56$3,003
Jun 19942513817.09$427
May 199417820215.88$2,827
Apr 199436623014.14$5,175
Mar 199418532612.46$2,305
Feb 199417917612.50$2,238
Jan 199417818712.66$2,253
Dec 1993023712.33$0
Nov 199318825414.49$2,724
Oct 199318545715.85$2,932
Sep 199318525315.03$2,781
Aug 199371518615.66$11,197
Jul 1993018615.46$0
Jun 1993014416.79$0
May 199318315017.68$3,235
Apr 199318115618.05$3,267
Mar 199336414418.14$6,603
Feb 19931869617.90$3,329
Jan 199319315616.93$3,267

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 1997 — as filed, then multipliedworked
Oil                  212 bbl  × $ 18.95 =     $4,017
Casinghead gas         0 Mcf  × $  1.94 =         $0

────────────────────────────────────────────────────
Month total                                   $4,017

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/O/25580 is the state's own key, not one this site invented.