Operated by REPUBLIC ENERGY INC. (P-5 702645) in the WEILER (MARBLE FALLS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 26987District 09Field 95928333OilCasinghead gasSaveExport
Value, all time
$251 k
Jan 1993 – Oct 2006
Value, last 12 filed months
$17 k
at the published price for each month
Months reported
166
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 18 leases and 26 wells, and the rule below applies to all of them.

Discovered
1966-05-31
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition1,909 bbl$34,888
Casinghead gasProduction162,001 Mcf$215,770
Total$250,659

105,026 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.2716, -97.9448. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.27156, -97.94480 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
5,898 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,898 ft.

Completions filed
Feb 1988
1 of 1 wells

1 well

42-2373745115,898 ftFeb 1988Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (166)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

166 months

Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20061068.717.34$69
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 2006028666.016.42$1,838
Apr 2006027664.397.36$2,031
Mar 2006028256.707.08$1,997
Feb 2006024857.597.75$1,922
Jan 2006027960.598.93$2,492
Dec 2005027954.9413.42$3,743
Nov 2005027254.6910.59$2,880
Oct 2005028258.3413.80$3,890
Sep 2005027661.4512.08$3,334
Aug 2005028761.519.80$2,812
Jul 2005029055.697.84$2,275
Jun 2005028452.337.38$2,096
May 2005029345.226.65$1,949
Apr 2005028349.207.36$2,083
Mar 2005029350.377.15$2,096
Feb 2005026845.226.31$1,692
Jan 2005030243.166.32$1,909
Dec 2004030039.866.75$2,025
Nov 2004029545.286.33$1,867
Oct 2004030849.706.52$2,007
Sep 2004030643.245.28$1,617
Aug 2004032042.375.55$1,776
Jul 2004033038.286.08$2,008
Jun 2004031736.106.43$2,039
May 2004033137.486.49$2,150
Apr 20040034.475.86$0
Mar 2004033034.365.53$1,825
Feb 2004030232.455.51$1,664
Jan 2004032932.036.30$2,073
Dec 2003033230.266.30$2,092
Nov 2003033328.804.60$1,530
Oct 2003034728.174.76$1,652
Sep 2003034026.314.75$1,615
Aug 2003034929.765.13$1,790
Jul 20031035529.415.17$2,130
Jun 2003032928.565.98$1,968
May 2003033926.595.97$2,025
Apr 2003034126.675.41$1,844
Mar 2003038431.146.10$2,341
Feb 2003031633.487.93$2,505
Jan 2003033530.315.58$1,870
Dec 2002033326.914.85$1,616
Nov 2002035624.664.14$1,473
Oct 2002044126.464.23$1,865
Sep 20021045527.443.64$1,928
Aug 2002046525.963.16$1,471
Jul 2002045824.583.06$1,402
Jun 2002044923.733.34$1,499
May 2002049524.663.58$1,774
Apr 2002036123.653.51$1,268
Mar 2002044422.003.10$1,378
Feb 2002031818.222.38$755
Jan 2002029017.172.38$689
Dec 20011034516.932.36$985
Nov 2001041018.072.41$986
Oct 2001042019.782.53$1,062
Sep 2001039124.262.25$880
Aug 2001039124.873.05$1,194
Jul 2001037223.933.20$1,189
Jun 2001038324.563.82$1,465
May 2001039225.524.31$1,688
Apr 2001037924.685.34$2,022
Mar 2001039124.545.38$2,102
Feb 20011029627.755.77$1,985
Jan 2001038627.478.40$3,242
Dec 2000037426.889.12$3,412
Nov 2000039232.215.66$2,218
Oct 2000038431.235.15$1,976
Sep 2000040231.875.19$2,085
Aug 2000042629.644.54$1,934
Jul 2000048428.534.09$1,979
Jun 2000038229.304.40$1,680
May 2000049027.263.68$1,803
Apr 2000053624.513.12$1,670
Mar 200016756628.422.86$6,365
Feb 2000057627.622.73$1,570
Jan 2000053725.272.48$1,332
Dec 1999060924.282.42$1,476
Nov 1999058123.192.43$1,414
Oct 1999058420.982.80$1,637
Sep 1999054721.752.62$1,433
Aug 1999045319.262.88$1,303
Jul 199907017.892.37$166
Jun 1999016515.942.36$390
May 1999432615.792.32$820
Apr 1999014115.102.21$311
Mar 199907412.471.84$136
Feb 1999009.981.82$0
Jan 19990910.381.90$17
Dec 199805049.201.77$894
Nov 1998020410.892.19$446
Oct 1998067812.421.97$1,335
Sep 199801,18012.592.08$2,457
Aug 199801,21911.301.91$2,325
Jul 199801,19911.742.24$2,682
Jun 199801,01011.242.24$2,260
May 199801,19112.622.21$2,628
Apr 1998761,23513.042.51$4,085
Mar 199801,02812.802.31$2,374
Feb 199801,27413.952.30$2,929
Jan 199801,00114.702.15$2,157
Dec 1997073716.322.41$1,777
Nov 1997761,19818.193.09$5,082
Oct 199701,50219.253.15$4,731
Sep 1997059817.742.95$1,767
Aug 199701,38317.862.55$3,533
Jul 199701,03217.582.25$2,319
Jun 1997044017.242.26$993
May 199701,50518.972.31$3,474
Apr 1997095017.882.08$1,979
Mar 1997791,55118.951.94$4,505
Feb 199701,56020.492.21$3,441
Jan 199701,91923.483.54$6,793
Dec 19961611,79623.32$3,755
Nov 199602,12021.97$0
Oct 199601,36323.31$0
Sep 1996026922.22$0
Aug 199601,63120.26$0
Jul 199601,91719.55$0
Jun 19961931,26918.73$3,615
May 199601,75419.43$0
Apr 199621,51021.51$43
Mar 199601,56919.38$0
Feb 199621,74116.98$34
Jan 199601,87517.07$0
Dec 199501,54417.19$0
Nov 199502,18616.00$0
Oct 199503,08615.43$0
Sep 199501,71516.18$0
Aug 1995922,00115.92$1,465
Jul 199502,05915.24$0
Jun 199502,09116.41$0
May 199502,25817.56$0
Apr 199502,16417.73$0
Mar 19951722,35116.44$2,828
Feb 199501,49916.58$0
Jan 199512,71715.92$16
Dec 199402,50415.03$0
Nov 199402,21015.90$0
Oct 19941072,53815.58$1,667
Sep 199422,65115.29$31
Aug 199402,60416.13$0
Jul 199402,44017.56$0
Jun 1994261,73417.09$444
May 19941672,17815.88$2,652
Apr 199402,26814.14$0
Mar 199402,03712.46$0
Feb 199401,88212.50$0
Jan 19941252,46112.66$1,583
Dec 199303,00012.33$0
Nov 199302,45314.49$0
Oct 199301,09815.85$0
Sep 1993761,87815.03$1,142
Aug 199302,45315.66$0
Jul 19931092,76615.46$1,685
Jun 199303,17416.79$0
May 199303,11917.68$0
Apr 199302,93118.05$0
Mar 19931303,09718.14$2,358
Feb 19931013,35817.90$1,808
Jan 199303,70716.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 2006 — as filed, then multipliedworked
Oil                    1 bbl  × $ 68.71 =        $69
Casinghead gas         0 Mcf  × $  7.34 =         $0

────────────────────────────────────────────────────
Month total                                      $69

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/O/26987 is the state's own key, not one this site invented.