ZINFANDEL

Operated by CANAN OPERATING, INC. (P-5 128979) in the CHARDONNAY (CADDO) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 28757District 09Field 17152200OilCasinghead gasSaveExport
Value, all time
$2.7 M
Feb 1994 – May 2026
Value, last 12 filed months
$56 k
at the published price for each month
Months reported
388
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 13 leases and 30 wells, and the rule below applies to all of them.

Discovered
1987-10-01
as the register files it
Field class
Oil
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2011-11-01.

The Commission's schedule remark for this field reads: PSUEDO RULES FOR HORIZONTAL WELLS

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition68,727 bbl$2,674,431
Casinghead gasProduction22 Mcf$0
Total$2,674,431

22 Mcf of this lease's gas, across 22 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (5)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.5764, -99.0037. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.5 miles.

33.57688, -99.00647 · centre of 3 wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
60.0%
3 of 5 wells
With a plug date
60.0%
3 of 5 wells
Median depth
5,200 ft
5 wells filed one
Completion to plug
22.2 years
median over 2 wells

What the state filed about each well

On the RRC proration schedule
360.0%
A plug date is filed
360.0%
BothOn the schedule and plugged. Neither fact cancels the other.
240.0%
NeitherNo plug date, and not on the schedule.
120.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 3,010 and 5,702 ft, median 5,200 ft, over the 5 wells that filed a depth.

Completions filed
Feb 1994 – May 2021
5 of 5 wells
Plug dates filed
Jun 1975 – Sep 2020
3 of 5 wells; 2 filed none

Last completion to plug: a median of 22.2 years across the 2 wells that filed both dates, with the middle half between 20.0 years and 24.4 years. A further 1 well is excluded, because the last completion the Commission holds for it is dated after the plug date. Both dates are the latest of their kind on the wellbore record and they are filed separately, so the two need not run in order. The gap is the distance between two filed dates — it is not a statement of how long the well produced.

5 wells

42-0233172355,060 ftMay 2021
42-0233150133,010 ftMar 2021Yes
42-0233131645,200 ftMar 1999Dec 2016Yes
42-023001481A5,570 ftMay 1997Jun 1975
42-0233147615,702 ftFeb 1994Sep 2020Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (388)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

388 months

May 20261710106.413.05$18,196
Apr 20260098.932.87$0
Mar 202685089.753.15$7,629
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 2025172058.593.93$10,077
Oct 2025167059.383.30$9,916
Sep 2025170062.743.08$10,666
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 2025164060.553.23$9,930
Apr 20250062.363.54$0
Mar 2025335067.704.27$22,680
Feb 20250070.884.34$0
Jan 2025171074.324.28$12,709
Dec 2024164068.993.12$11,314
Nov 2024167069.052.20$11,531
Oct 2024338071.372.28$24,123
Sep 2024166069.612.36$11,555
Aug 2024167075.632.06$12,630
Jul 2024336079.932.15$26,856
Jun 2024168078.082.63$13,117
May 202420078.812.20$1,576
Apr 2024326084.451.66$27,531
Mar 2024170080.301.55$13,651
Feb 2024336076.091.78$25,566
Jan 2024165073.023.30$12,048
Dec 20230071.262.61$0
Nov 2023167077.892.81$13,008
Oct 2023166085.443.09$14,183
Sep 2023167089.042.74$14,870
Aug 2023168080.522.67$13,527
Jul 2023168074.852.64$12,575
Jun 2023328068.962.26$22,619
May 2023161070.622.23$11,370
Apr 2023154078.122.24$12,030
Mar 2023318072.852.39$23,166
Feb 2023164075.112.47$12,318
Jan 2023166076.533.39$12,704
Dec 2022346076.415.73$26,438
Nov 2022334085.005.65$28,390
Oct 2022164087.185.86$14,298
Sep 2022153084.888.16$12,987
Aug 2022169094.529.13$15,974
Jul 20223330101.587.54$33,826
Jun 20223390115.097.98$39,016
May 20223360109.378.43$36,748
Apr 20221550104.226.84$16,154
Mar 20223390108.885.08$36,910
Feb 2022179091.054.86$16,298
Jan 2022170081.844.54$13,913
Dec 2021167071.323.90$11,910
Nov 2021339077.435.24$26,249
Oct 2021166079.795.71$13,245
Sep 2021172069.865.35$12,016
Aug 2021167066.024.22$11,025
Jul 2021327070.783.98$23,145
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 2019112050.852.79$5,695
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 2013156093.623.91$14,605
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 2012161085.133.02$13,706
Jun 2012163079.822.52$13,011
May 20120091.612.49$0
Apr 20121690101.652.00$17,179
Mar 201200105.052.22$0
Feb 20121660101.102.57$16,783
Jan 2012172098.092.73$16,871
Dec 20110096.873.24$0
Nov 2011162095.723.31$15,507
Oct 2011167084.983.65$14,192
Sep 20110083.623.99$0
Aug 2011165083.404.15$13,761
Jul 20110094.144.52$0
Jun 2011167092.904.64$15,514
May 20110098.134.40$0
Apr 20111680105.964.33$17,801
Mar 2011166096.364.06$15,996
Feb 20110085.644.18$0
Jan 2011167086.504.59$14,446
Dec 2010166085.734.35$14,231
Nov 20100080.843.80$0
Oct 2010165078.103.51$12,887
Sep 2010168072.633.98$12,202
Aug 20100073.684.42$0
Jul 2010165072.554.74$11,971
Jun 20100070.364.91$0
May 2010162071.124.24$11,521
Apr 20100081.694.12$0
Mar 2010333078.394.39$26,104
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 2009166071.445.48$11,859
Nov 20090074.593.75$0
Oct 2009167072.544.11$12,114
Sep 20090065.543.06$0
Aug 2009162067.423.22$10,922
Jul 2009169061.133.46$10,331
Jun 2009164066.163.90$10,850
May 20090054.743.93$0
Apr 2009173046.773.59$8,091
Mar 20090042.144.06$0
Feb 2009173032.814.63$5,676
Jan 2009176035.865.37$6,311
Dec 20080037.105.98$0
Nov 2008169055.496.86$9,378
Oct 2008172075.246.92$12,941
Sep 200800101.767.88$0
Aug 20081700114.228.48$19,417
Jul 20081780131.0811.39$23,332
Jun 20081730131.3313.03$22,720
May 200800123.1711.57$0
Apr 20081750110.3110.45$19,304
Mar 20081760101.909.66$17,934
Feb 2008181092.538.77$16,748
Jan 20080090.388.21$0
Dec 2007181088.337.30$15,988
Nov 2007175091.677.29$16,042
Oct 2007173082.856.92$14,333
Sep 20070075.846.24$0
Aug 2007171069.066.39$11,809
Jul 2007173070.906.39$12,266
Jun 2007175062.007.55$10,850
May 2007176058.747.85$10,338
Apr 2007174059.617.81$10,372
Mar 2007177056.927.30$10,075
Feb 20070055.108.22$0
Jan 2007178050.306.73$8,953
Dec 2006182056.656.92$10,310
Nov 2006180054.207.62$9,756
Oct 2006175054.906.01$9,608
Sep 2006178060.085.04$10,694
Aug 2006175068.717.34$12,024
Jul 2006176069.376.34$12,209
Jun 2006169066.286.38$11,201
May 2006171066.016.42$11,288
Apr 2006172064.397.36$11,075
Mar 2006174056.707.08$9,866
Feb 20060057.597.75$0
Jan 2006346060.598.93$20,964
Dec 2005174054.9413.42$9,560
Nov 2005176054.6910.59$9,625
Oct 2005175058.3413.80$10,210
Sep 2005176061.4512.08$10,815
Aug 2005173061.519.80$10,641
Jul 2005173055.697.84$9,634
Jun 2005176052.337.38$9,210
May 2005173045.226.65$7,823
Apr 2005168049.207.36$8,266
Mar 2005170050.377.15$8,563
Feb 2005172045.226.31$7,778
Jan 2005177043.166.32$7,639
Dec 2004170039.866.75$6,776
Nov 2004175045.286.33$7,924
Oct 2004175049.706.52$8,698
Sep 2004178043.245.28$7,697
Aug 2004352042.375.55$14,914
Jul 2004175038.286.08$6,699
Jun 2004177036.106.43$6,390
May 2004182037.486.49$6,821
Apr 2004176034.475.86$6,067
Mar 2004357034.365.53$12,267
Feb 2004183032.455.51$5,938
Jan 2004178032.036.30$5,701
Dec 2003353030.266.30$10,682
Nov 2003173028.804.60$4,982
Oct 2003176028.174.76$4,958
Sep 2003352026.314.75$9,261
Aug 2003177029.765.13$5,268
Jul 2003347029.415.17$10,205
Jun 2003178028.565.98$5,084
May 2003174026.595.97$4,627
Apr 2003345026.675.41$9,201
Mar 2003178031.146.10$5,543
Feb 2003364033.487.93$12,187
Jan 2003183030.315.58$5,547
Dec 2002364026.914.85$9,795
Nov 2002362024.664.14$8,927
Oct 2002177026.464.23$4,683
Sep 2002350027.443.64$9,604
Aug 2002177025.963.16$4,595
Jul 2002358024.583.06$8,800
Jun 2002171023.733.34$4,058
May 2002354024.663.58$8,730
Apr 2002350023.653.51$8,278
Mar 2002173022.003.10$3,806
Feb 2002344018.222.38$6,268
Jan 2002352017.172.38$6,044
Dec 2001353016.932.36$5,976
Nov 2001348018.072.41$6,288
Oct 2001173019.782.53$3,422
Sep 2001310024.262.25$7,521
Aug 2001334024.873.05$8,307
Jul 2001339023.933.20$8,112
Jun 2001352024.563.82$8,645
May 2001337025.524.31$8,600
Apr 2001348024.685.34$8,589
Mar 2001349024.545.38$8,564
Feb 2001350027.755.77$9,713
Jan 2001522027.478.40$14,339
Dec 2000168026.889.12$4,516
Nov 2000263032.215.66$8,471
Oct 2000333031.235.15$10,400
Sep 2000354031.875.19$11,282
Aug 2000334029.644.54$9,900
Jul 2000340028.534.09$9,700
Jun 2000168029.304.40$4,922
May 2000329027.263.68$8,969
Apr 2000343024.513.12$8,407
Mar 2000512028.422.86$14,551
Feb 2000443027.622.73$12,236
Jan 2000353025.272.48$8,920
Dec 1999521024.282.42$12,650
Nov 1999524023.192.43$12,152
Oct 1999525020.982.80$11,015
Sep 1999347021.752.62$7,547
Aug 1999346019.262.88$6,664
Jul 1999526017.892.37$9,410
Jun 1999350015.942.36$5,579
May 1999503015.792.32$7,942
Apr 1999341015.102.21$5,149
Mar 1999323012.471.84$4,028
Feb 199917509.981.82$1,747
Jan 1999174010.381.90$1,806
Dec 199835409.201.77$3,257
Nov 1998352010.892.19$3,833
Oct 1998357012.421.97$4,434
Sep 1998354012.592.08$4,457
Aug 1998355011.301.91$4,012
Jul 1998520011.742.24$6,105
Jun 1998347011.242.24$3,900
May 1998532012.622.21$6,714
Apr 1998336013.042.51$4,381
Mar 1998151012.802.31$1,933
Feb 1998164013.952.30$2,288
Jan 1998328014.702.15$4,822
Dec 1997334016.322.41$5,451
Nov 1997168018.193.09$3,056
Oct 1997334019.253.15$6,430
Sep 1997488017.742.95$8,657
Aug 1997331017.862.55$5,912
Jul 1997493017.582.25$8,667
Jun 1997333017.242.26$5,741
May 1997835018.972.31$15,840
Apr 1997504017.882.08$9,012
Mar 1997337018.951.94$6,386
Feb 1997146020.492.21$2,992
Jan 1997172023.483.54$4,039
Dec 1996174023.32$4,058
Nov 1996342021.97$7,514
Oct 1996166023.31$3,869
Sep 1996168022.22$3,733
Aug 1996168020.26$3,404
Jul 1996166019.55$3,245
Jun 1996336018.73$6,293
May 1996168019.43$3,264
Apr 19960021.51$0
Mar 1996171019.38$3,314
Feb 1996343016.98$5,824
Jan 1996174017.07$2,970
Dec 1995344017.19$5,913
Nov 1995171116.00$2,736
Oct 1995171115.43$2,639
Sep 1995339116.18$5,485
Aug 1995168115.92$2,675
Jul 1995524115.24$7,986
Jun 1995341116.41$5,596
May 1995337117.56$5,918
Apr 1995685117.73$12,145
Mar 1995685116.44$11,261
Feb 1995349116.58$5,786
Jan 1995721115.92$11,478
Dec 1994543115.03$8,161
Nov 1994911115.90$14,485
Oct 19941,065115.58$16,593
Sep 1994898115.29$13,730
Aug 1994895116.13$14,436
Jul 1994899117.56$15,786
Jun 19941,066117.09$18,218
May 19941,096115.88$17,404
Apr 1994897114.14$12,684
Mar 19940112.46$0
Feb 1994363112.50$4,538

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Oil                  171 bbl  × $106.41 =    $18,196
Casinghead gas         0 Mcf  × $  3.05 =         $0

────────────────────────────────────────────────────
Month total                                  $18,196

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/O/28757 is the state's own key, not one this site invented.