HAZEL BAKER UNIT

Operated by DIMOCK OPERATING COMPANY (P-5 220696) in the K & L (CADDO) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 29321District 09Field 47870075OilSaveExport
Value, all time
$246 k
Apr 1997 – Mar 2008
Value, last 12 filed months
$0
at the published price for each month
Months reported
132
no gaps in the span
Streams
1
oil

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 3 leases and 3 wells, and the rule below applies to all of them.

Discovered
1997-04-01
as the register files it
Field class
Oil
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2000-01-11.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition14,078 bbl$245,673
Total$245,673

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 34.0603, -99.2886. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

34.06032, -99.28859 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
4,774 ft
1 wells filed one
Completion to plug
6.6 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,774 ft.

Completions filed
Mar 1997
1 of 1 wells
Plug dates filed
Oct 2003
1 of 1 wells

Last completion to plug: a median of 6.6 years across the 1 well that filed both dates, with the middle half between 6.6 years and 6.6 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4873099314,774 ftMar 1997Oct 2003Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (132)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

132 months

Mar 20080101.909.66$0
Feb 2008092.538.77$0
Jan 2008090.388.21$0
Dec 2007088.337.30$0
Nov 2007091.677.29$0
Oct 2007082.856.92$0
Sep 2007075.846.24$0
Aug 2007069.066.39$0
Jul 2007070.906.39$0
Jun 2007062.007.55$0
May 2007058.747.85$0
Apr 2007059.617.81$0
Mar 2007056.927.30$0
Feb 2007055.108.22$0
Jan 2007050.306.73$0
Dec 2006056.656.92$0
Nov 2006054.207.62$0
Oct 2006054.906.01$0
Sep 2006060.085.04$0
Aug 2006068.717.34$0
Jul 2006069.376.34$0
Jun 2006066.286.38$0
May 2006066.016.42$0
Apr 2006064.397.36$0
Mar 2006056.707.08$0
Feb 2006057.597.75$0
Jan 2006060.598.93$0
Dec 2005054.9413.42$0
Nov 2005054.6910.59$0
Oct 2005058.3413.80$0
Sep 2005061.4512.08$0
Aug 2005061.519.80$0
Jul 2005055.697.84$0
Jun 2005052.337.38$0
May 2005045.226.65$0
Apr 2005049.207.36$0
Mar 2005050.377.15$0
Feb 2005045.226.31$0
Jan 2005043.166.32$0
Dec 2004039.866.75$0
Nov 2004045.286.33$0
Oct 2004049.706.52$0
Sep 2004043.245.28$0
Aug 2004042.375.55$0
Jul 2004038.286.08$0
Jun 2004036.106.43$0
May 2004037.486.49$0
Apr 20046134.475.86$2,103
Mar 2004034.365.53$0
Feb 2004032.455.51$0
Jan 2004032.036.30$0
Dec 2003030.266.30$0
Nov 2003028.804.60$0
Oct 2003028.174.76$0
Sep 2003026.314.75$0
Aug 2003029.765.13$0
Jul 2003029.415.17$0
Jun 2003028.565.98$0
May 2003026.595.97$0
Apr 2003026.675.41$0
Mar 2003031.146.10$0
Feb 2003033.487.93$0
Jan 2003030.315.58$0
Dec 2002026.914.85$0
Nov 2002024.664.14$0
Oct 2002026.464.23$0
Sep 2002027.443.64$0
Aug 2002025.963.16$0
Jul 2002024.583.06$0
Jun 2002023.733.34$0
May 2002024.663.58$0
Apr 2002023.653.51$0
Mar 2002022.003.10$0
Feb 2002018.222.38$0
Jan 2002017.172.38$0
Dec 2001016.932.36$0
Nov 2001018.072.41$0
Oct 2001019.782.53$0
Sep 2001024.262.25$0
Aug 2001024.873.05$0
Jul 2001023.933.20$0
Jun 2001024.563.82$0
May 2001025.524.31$0
Apr 2001024.685.34$0
Mar 2001024.545.38$0
Feb 2001027.755.77$0
Jan 200118427.478.40$5,054
Dec 2000026.889.12$0
Nov 2000032.215.66$0
Oct 200013231.235.15$4,122
Sep 2000031.875.19$0
Aug 2000029.644.54$0
Jul 200018328.534.09$5,221
Jun 2000029.304.40$0
May 2000027.263.68$0
Apr 200017924.513.12$4,387
Mar 2000028.422.86$0
Feb 200018927.622.73$5,220
Jan 2000025.272.48$0
Dec 199918024.282.42$4,370
Nov 1999023.192.43$0
Oct 199917320.982.80$3,630
Sep 1999021.752.62$0
Aug 1999019.262.88$0
Jul 199914517.892.37$2,594
Jun 199917615.942.36$2,805
May 199918615.792.32$2,937
Apr 1999015.102.21$0
Mar 199918512.471.84$2,307
Feb 199909.981.82$0
Jan 199918410.381.90$1,910
Dec 19981829.201.77$1,674
Nov 199817410.892.19$1,895
Oct 199818112.421.97$2,248
Sep 199817712.592.08$2,228
Aug 199817611.301.91$1,989
Jul 199815711.742.24$1,843
Jun 199835511.242.24$3,990
May 199816512.622.21$2,082
Apr 199817813.042.51$2,321
Mar 199837012.802.31$4,736
Feb 199836413.952.30$5,078
Jan 199825214.702.15$3,704
Dec 199743816.322.41$7,148
Nov 199738018.193.09$6,912
Oct 199754119.253.15$10,414
Sep 199770217.742.95$12,453
Aug 199757917.862.55$10,341
Jul 19971,09717.582.25$19,285
Jun 19971,31117.242.26$22,602
May 19971,84218.972.31$34,943
Apr 19972,30017.882.08$41,124

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2004 — as filed, then multipliedworked
Oil                   61 bbl  × $ 34.47 =     $2,103

────────────────────────────────────────────────────
Month total                                   $2,103

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/O/29321 is the state's own key, not one this site invented.