BUCKNER

Operated by BEST PETROLEUM EXPLORATIONS,INC. (P-5 68287) in the PARK SPRINGS (CONGL.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 29411District 09Field 69175500OilCasinghead gasSaveExport
Value, all time
$584 k
Oct 1997 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
344
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 198 leases and 217 wells, and the rule below applies to all of them.

Discovered
1950-06-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 1975-04-01.

The Commission's schedule remark for this field reads: RATE TO 2103 MCF/D EFFECTIVE 2/1/97

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition13,835 bbl$554,201
Casinghead gasProduction7,424 Mcf$29,682
Total$583,883

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.3863, -97.7704. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.38631, -97.77037 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,914 ft
1 wells filed one
Completion to plug
41.7 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,914 ft.

Completions filed
Jul 1982
1 of 1 wells
Plug dates filed
Mar 2024
1 of 1 wells

Last completion to plug: a median of 41.7 years across the 1 well that filed both dates, with the middle half between 41.7 years and 41.7 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4973240915,914 ftJul 1982Mar 2024Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (344)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

344 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 2019114052.782.49$6,017
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 2018164063.842.90$10,470
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 2017161045.373.00$7,305
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 2016167048.763.72$8,143
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 2016157036.561.99$5,740
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 2015163042.992.76$7,007
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 2015166049.822.71$8,270
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 2014168086.164.05$14,475
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 2014162095.895.06$15,534
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 20131590104.113.72$16,553
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 2013169093.623.91$15,822
Feb 20130091.233.42$0
Jan 201301891.603.42$62
Dec 201201986.773.42$65
Nov 201201686.953.62$58
Oct 201201789.383.40$58
Sep 20121692094.672.92$16,058
Aug 201201792.662.91$49
Jul 201202185.133.02$63
Jun 20120079.822.52$0
May 201201591.612.49$37
Apr 2012016101.652.00$32
Mar 201216917105.052.22$17,791
Feb 2012014101.102.57$36
Jan 201201798.092.73$46
Dec 201101496.873.24$45
Nov 201101395.723.31$43
Oct 20111681484.983.65$14,328
Sep 201101683.623.99$64
Aug 201101583.404.15$62
Jul 201101394.144.52$59
Jun 201101292.904.64$56
May 20111701198.134.40$16,731
Apr 2011017105.964.33$74
Mar 201102196.364.06$85
Feb 20110785.644.18$29
Jan 201101986.504.59$87
Dec 201001285.734.35$52
Nov 201002780.843.80$102
Oct 20100778.103.51$25
Sep 20101791872.633.98$13,072
Aug 201002173.684.42$93
Jul 201002572.554.74$118
Jun 201002470.364.91$118
May 201002371.124.24$97
Apr 201002181.694.12$87
Mar 20101672178.394.39$13,183
Feb 201002073.585.44$109
Jan 201002174.365.96$125
Dec 200902571.445.48$137
Nov 200902474.593.75$90
Oct 20091712172.544.11$12,491
Sep 200901865.543.06$55
Aug 200902467.423.22$77
Jul 200901961.133.46$66
Jun 200903466.163.90$132
May 20091733454.743.93$9,604
Apr 200903446.773.59$122
Mar 200902742.144.06$110
Feb 200902532.814.63$116
Jan 200902835.865.37$150
Dec 200802437.105.98$143
Nov 20081752055.496.86$9,848
Oct 200801975.246.92$132
Sep 2008015101.767.88$118
Aug 2008020114.228.48$170
Jul 2008021131.0811.39$239
Jun 200817819131.3313.03$23,624
May 2008025123.1711.57$289
Apr 2008024110.3110.45$251
Mar 200817518101.909.66$18,006
Feb 200801692.538.77$140
Jan 200801790.388.21$140
Dec 200701288.337.30$88
Nov 200702091.677.29$146
Oct 20071742282.856.92$14,568
Sep 200702275.846.24$137
Aug 200702769.066.39$172
Jul 200702770.906.39$172
Jun 200702662.007.55$196
May 20071682258.747.85$10,041
Apr 20070659.617.81$47
Mar 200702056.927.30$146
Feb 200701355.108.22$107
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060954.207.62$69
Oct 20061721354.906.01$9,521
Sep 200601460.085.04$71
Aug 200601468.717.34$103
Jul 200602369.376.34$146
Jun 200601766.286.38$109
May 20061741766.016.42$11,595
Apr 200601664.397.36$118
Mar 20061691056.707.08$9,653
Feb 200601057.597.75$78
Jan 200601260.598.93$107
Dec 200501254.9413.42$161
Nov 200501954.6910.59$201
Oct 20051772058.3413.80$10,602
Sep 200502261.4512.08$266
Aug 20050761.519.80$69
Jul 2005176055.697.84$9,801
Jun 20050952.337.38$66
May 200501145.226.65$73
Apr 200501349.207.36$96
Mar 200501650.377.15$114
Feb 20051701145.226.31$7,757
Jan 200501143.166.32$70
Dec 20041701239.866.75$6,857
Nov 200401545.286.33$95
Oct 200401649.706.52$104
Sep 20041673543.245.28$7,406
Aug 200404942.375.55$272
Jul 200404538.286.08$274
Jun 200401536.106.43$97
May 20041714637.486.49$6,708
Apr 200405034.475.86$293
Mar 200405734.365.53$315
Feb 20041775132.455.51$6,025
Jan 200402132.036.30$132
Dec 20031672130.266.30$5,186
Nov 200303528.804.60$161
Oct 200305528.174.76$262
Sep 200305626.314.75$266
Aug 200317410529.765.13$5,717
Jul 200309429.415.17$486
Jun 200302628.565.98$156
May 20031666526.595.97$4,802
Apr 200304226.675.41$227
Mar 20031213431.146.10$3,975
Feb 200302433.487.93$190
Jan 200301930.315.58$106
Dec 20021783526.914.85$4,960
Nov 200203124.664.14$128
Oct 20021664926.464.23$4,600
Sep 200204527.443.64$164
Aug 200206325.963.16$199
Jul 20021775824.583.06$4,528
Jun 20021653423.733.34$4,029
May 200213424.663.58$147
Apr 200204323.653.51$151
Mar 20021723522.003.10$3,893
Feb 200203118.222.38$74
Jan 2002174017.172.38$2,988
Dec 20010016.932.36$0
Nov 20011722318.072.41$3,163
Oct 200104219.782.53$106
Sep 200117111124.262.25$4,398
Aug 2001011724.873.05$357
Jul 200117412023.933.20$4,547
Jun 2001015124.563.82$577
May 200116815025.524.31$4,933
Apr 200117211924.685.34$4,880
Mar 200113224.545.38$197
Feb 20011854227.755.77$5,376
Jan 200102527.478.40$210
Dec 20001802326.889.12$5,048
Nov 200004032.215.66$226
Oct 20001728031.235.15$5,783
Sep 20001738331.875.19$5,944
Aug 200007129.644.54$322
Jul 2000172128.534.09$4,911
Jun 200029129.304.40$459
May 200018112427.263.68$5,390
Apr 20001739624.513.12$4,539
Mar 20001739828.422.86$5,197
Feb 200006227.622.73$169
Jan 20001755125.272.48$4,549
Dec 19991553824.282.42$3,856
Nov 19991644723.192.43$3,918
Oct 199903720.982.80$104
Sep 19991708921.752.62$3,931
Aug 199916210919.262.88$3,434
Jul 199916611217.892.37$3,235
Jun 199917411815.942.36$3,052
May 1999011915.792.32$276
Apr 199932810215.102.21$5,178
Mar 1999011412.471.84$210
Feb 1999175749.981.82$1,881
Jan 19991636910.381.90$1,823
Dec 19981681149.201.77$1,748
Nov 199816311910.892.19$2,035
Oct 199817713712.421.97$2,468
Sep 199817514612.592.08$2,507
Aug 199816314911.301.91$2,126
Jul 199817413611.742.24$2,347
Jun 199809811.242.24$219
May 199818413512.622.21$2,620
Apr 199832916413.042.51$4,701
Mar 19981876812.802.31$2,551
Feb 199806813.952.30$156
Jan 19981758714.702.15$2,760
Dec 19973747316.322.41$6,280
Nov 1997951118.193.09$1,762
Oct 19970019.253.15$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2019 — as filed, then multipliedworked
Oil                  114 bbl  × $ 52.78 =     $6,017
Casinghead gas         0 Mcf  × $  2.49 =         $0

────────────────────────────────────────────────────
Month total                                   $6,017

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/O/29411 is the state's own key, not one this site invented.