Value, all time
$3.0 M
Mar 1998 – May 2026
Value, last 12 filed months
$32 k
at the published price for each month
Months reported
339
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 62 leases and 99 wells, and the rule below applies to all of them.

Discovered
1971-12-30
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 1997-10-01.

The Commission's schedule remark for this field reads: PSEUDO RULES BUILT TO ACCOMMODATE MITCHELL'S HORIZ. WELL

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition80,733 bbl$2,178,618
Casinghead gasProduction207,109 Mcf$838,642
Total$3,017,260

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.3013, -98.3095. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.30130, -98.30947 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,283 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,283 ft.

Completions filed
Mar 1998
1 of 1 wells

1 well

42-2373834016,283 ftMar 1998

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (339)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

339 months

May 202600106.413.05$0
Apr 202684098.932.87$8,310
Mar 20260089.753.15$0
Feb 202680063.503.75$5,080
Jan 20260059.138.00$0
Dec 202585056.664.41$4,816
Nov 20250058.593.93$0
Oct 202581059.383.30$4,810
Sep 20250062.743.08$0
Aug 202585063.933.01$5,434
Jul 20250066.743.32$0
Jun 202556066.483.13$3,723
May 202592060.553.23$5,571
Apr 202540062.363.54$2,494
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 202593074.324.28$6,912
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 202483071.372.28$5,924
Sep 2024156069.612.36$10,859
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 2024174078.082.63$13,586
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 2024159076.091.78$12,098
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 2023158085.443.09$13,500
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 2023160074.852.64$11,976
Jun 20230068.962.26$0
May 2023165070.622.23$11,652
Apr 20230078.122.24$0
Mar 2023173072.852.39$12,603
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 2022165085.005.65$14,025
Oct 20220087.185.86$0
Sep 2022167084.888.16$14,175
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 20221700109.378.43$18,593
Apr 202200104.226.84$0
Mar 20221660108.885.08$18,074
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 2021164079.795.71$13,086
Sep 2021162069.865.35$11,317
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20211069.493.38$69
May 20210063.483.02$0
Apr 2021168060.362.76$10,140
Mar 2021166061.302.72$10,176
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 2020168039.982.39$6,717
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 2020159014.751.80$2,345
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 2020168057.252.09$9,618
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 2019158055.052.66$8,698
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 2019169052.782.49$8,920
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 2019164056.803.06$9,315
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 2018167046.594.19$7,781
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 2018160059.403.07$9,504
Jul 201842065.142.93$2,736
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 2018166063.842.90$10,597
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 2017159057.272.92$9,106
Nov 20170055.423.12$0
Oct 2017123049.292.98$6,063
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 2017108043.873.09$4,738
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 2017161046.772.98$7,530
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 2016114048.763.72$5,559
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 2016160041.553.10$6,648
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 2016180042.521.99$7,654
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 2016175027.352.36$4,786
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 2015170042.992.76$7,308
Aug 20150040.162.87$0
Jul 201558048.152.95$2,793
Jun 2015182056.152.88$10,219
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 2015182042.892.93$7,806
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 2014192054.693.59$10,500
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 2014193086.164.05$16,629
Aug 201453089.394.04$4,738
Jul 20140096.564.18$0
Jun 201497098.164.74$9,522
May 201437094.734.73$3,505
Apr 2014100095.944.81$9,594
Mar 2014184095.895.06$17,644
Feb 20140097.406.19$0
Jan 201464090.404.86$5,786
Dec 20130091.824.35$0
Nov 201306288.853.74$232
Oct 20136026897.423.78$6,858
Sep 2013169219104.113.72$18,409
Aug 20130352104.253.52$1,240
Jul 20130368102.523.72$1,368
Jun 2013023194.403.93$909
May 201318734194.834.15$19,148
Apr 2013041893.964.28$1,790
Mar 2013042393.623.91$1,655
Feb 2013029691.233.42$1,012
Jan 201316628491.603.42$16,177
Dec 2012027286.773.42$930
Nov 201217839186.953.62$16,894
Oct 20125335289.383.40$5,934
Sep 20127534294.672.92$8,098
Aug 201210540092.662.91$10,893
Jul 20124548685.133.02$5,299
Jun 20126946479.822.52$6,676
May 20126245091.612.49$6,800
Apr 20120371101.652.00$741
Mar 201287448105.052.22$10,135
Feb 2012169380101.102.57$18,063
Jan 2012040198.092.73$1,096
Dec 201115838596.873.24$16,553
Nov 2011041995.723.31$1,387
Oct 20119146884.983.65$9,441
Sep 201117729883.623.99$15,989
Aug 2011037183.404.15$1,539
Jul 201116232594.144.52$16,719
Jun 2011046292.904.64$2,144
May 201118227198.134.40$19,053
Apr 20110262105.964.33$1,135
Mar 2011027296.364.06$1,104
Feb 2011017985.644.18$748
Jan 201118420086.504.59$16,834
Dec 2010037085.734.35$1,609
Nov 201017137380.843.80$15,239
Oct 2010041378.103.51$1,449
Sep 2010039072.633.98$1,552
Aug 201017643873.684.42$14,903
Jul 2010041472.554.74$1,961
Jun 2010038770.364.91$1,900
May 201018938871.124.24$15,085
Apr 2010038881.694.12$1,600
Mar 2010038878.394.39$1,703
Feb 2010034073.585.44$1,850
Jan 201018638874.365.96$16,145
Dec 2009042471.445.48$2,325
Nov 2009032674.593.75$1,223
Oct 2009044372.544.11$1,821
Sep 200918743365.543.06$13,583
Aug 2009047767.423.22$1,535
Jul 200918154861.133.46$12,963
Jun 2009021366.163.90$830
May 2009042754.743.93$1,676
Apr 200919148846.773.59$10,684
Mar 2009045842.144.06$1,859
Feb 200919041332.814.63$8,147
Jan 200920041135.865.37$9,379
Dec 2008043037.105.98$2,570
Nov 200818445055.496.86$13,297
Oct 2008046575.246.92$3,219
Sep 2008179520101.767.88$22,311
Aug 20080362114.228.48$3,071
Jul 20080374131.0811.39$4,260
Jun 2008170446131.3313.03$28,139
May 20080524123.1711.57$6,065
Apr 2008164680110.3110.45$25,200
Mar 20080766101.909.66$7,403
Feb 2008045692.538.77$3,999
Jan 200817746690.388.21$19,821
Dec 2007043688.337.30$3,184
Nov 2007049191.677.29$3,580
Oct 2007053182.856.92$3,676
Sep 200717551875.846.24$16,506
Aug 2007055169.066.39$3,520
Jul 2007057870.906.39$3,692
Jun 2007053462.007.55$4,031
May 2007051958.747.85$4,072
Apr 2007050759.617.81$3,957
Mar 200716750756.927.30$13,208
Feb 2007045255.108.22$3,714
Jan 2007051450.306.73$3,458
Dec 2006051356.656.92$3,549
Nov 200618451354.207.62$13,881
Oct 2006055054.906.01$3,308
Sep 2006054560.085.04$2,745
Aug 2006058168.717.34$4,264
Jul 200616954069.376.34$15,149
Jun 2006053866.286.38$3,435
May 200616154966.016.42$14,155
Apr 2006053364.397.36$3,923
Mar 2006054756.707.08$3,874
Feb 200615349357.597.75$12,633
Jan 2006055360.598.93$4,940
Dec 2005055754.9413.42$7,472
Nov 2005055054.6910.59$5,824
Oct 200516459158.3413.80$17,721
Sep 2005060461.4512.08$7,296
Aug 2005064961.519.80$6,358
Jul 200517064755.697.84$14,542
Jun 2005063552.337.38$4,687
May 200515664445.226.65$11,338
Apr 2005061249.207.36$4,505
Mar 2005067750.377.15$4,844
Feb 200516263045.226.31$11,302
Jan 2005068743.166.32$4,343
Dec 2004070439.866.75$4,753
Nov 200416267445.286.33$11,602
Oct 2004072349.706.52$4,710
Sep 2004069843.245.28$3,688
Aug 200415672742.375.55$10,645
Jul 2004073338.286.08$4,460
Jun 2004061636.106.43$3,963
May 2004075337.486.49$4,890
Apr 200415370434.475.86$9,398
Mar 2004077534.365.53$4,286
Feb 2004069232.455.51$3,813
Jan 200418147132.036.30$8,765
Dec 200317422730.266.30$6,696
Nov 200317363028.804.60$7,877
Oct 2003071628.174.76$3,408
Sep 200317757426.314.75$7,383
Aug 200317186929.765.13$9,547
Jul 2003084529.415.17$4,369
Jun 2003083528.565.98$4,996
May 200316681226.595.97$9,264
Apr 2003078026.675.41$4,218
Mar 200336388531.146.10$16,699
Feb 20031591,01633.487.93$13,376
Jan 20033591,06630.315.58$16,832
Dec 200269284626.914.85$22,728
Nov 200235168824.664.14$11,502
Oct 2002091326.464.23$3,861
Sep 200217898027.443.64$8,447
Aug 2002099525.963.16$3,148
Jul 20021741,04424.583.06$7,473
Jun 20021691,07123.733.34$7,586
May 200201,00424.663.58$3,598
Apr 20021731,21123.653.51$8,345
Mar 20023521,27822.003.10$11,709
Feb 20021701,11418.222.38$5,744
Jan 200201,31017.172.38$3,112
Dec 20013511,36816.932.36$9,177
Nov 20011651,42418.072.41$6,407
Oct 20013421,56619.782.53$10,725
Sep 20011671,72624.262.25$7,937
Aug 20013502,00324.873.05$14,820
Jul 20011721,42823.933.20$8,681
Jun 20015101,71224.563.82$19,073
May 20013361,77325.524.31$16,212
Apr 20011741,77924.685.34$13,786
Mar 20015201,89924.545.38$22,971
Feb 20014451,81227.755.77$22,799
Jan 20013432,04427.478.40$26,589
Dec 20005182,15326.889.12$33,565
Nov 20005042,25532.215.66$28,993
Oct 20005072,55631.235.15$28,986
Sep 20008512,57731.875.19$40,487
Aug 20006772,86029.644.54$33,053
Jul 20009783,20228.534.09$40,998
Jun 20001672,61029.304.40$16,370
May 20006813,52027.263.68$31,517
Apr 20001,1943,92624.513.12$41,498
Mar 20001,5934,88728.422.86$59,249
Feb 20001,5265,36427.622.73$56,773
Jan 20006253,08725.272.48$23,451
Dec 19992,1449,05524.282.42$74,003
Nov 19993,0617,62023.192.43$89,532
Oct 19992,5762,60820.982.80$61,357
Sep 19991,0391,33521.752.62$26,094
Aug 19999831,76019.262.88$23,994
Jul 19991,0211,67517.892.37$22,239
Jun 19991,3861,98215.942.36$26,775
May 19991,3962,25815.792.32$27,284
Apr 19991,1832,11815.102.21$22,540
Mar 19991,3952,31212.471.84$21,646
Feb 19996931,7249.981.82$10,050
Jan 19991,0082,01310.381.90$14,288
Dec 19982,4462,6589.201.77$27,217
Nov 19983,2844,61910.892.19$45,859
Oct 19983,4934,13612.421.97$51,528
Sep 19982,6873,24012.592.08$40,577
Aug 19983,7484,66511.301.91$51,250
Jul 19983,9554,28211.742.24$56,012
Jun 19984,1064,19311.242.24$55,532
May 19984,2843,59412.622.21$61,994
Apr 19982,4452,06813.042.51$37,064
Mar 19980012.802.31$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Oil                   84 bbl  × $ 98.93 =     $8,310
Casinghead gas         0 Mcf  × $  2.87 =         $0

────────────────────────────────────────────────────
Month total                                   $8,310

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/O/29515 is the state's own key, not one this site invented.