BASHE

Operated by ROCANVILLE CORPORATION (P-5 722190) in the CLINGINGSMITH, E. (STRAWN, UP.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 29862District 09Field 18978500OilSaveExport
Value, all time
$350 k
Jan 2001 – Nov 2012
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
143
no gaps in the span
Streams
1
oil

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2 leases and 2 wells, and the rule below applies to all of them.

Discovered
1969-12-13
as the register files it
Field class
Oil
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition9,942 bbl$350,102
Total$350,102

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.7294, -97.7683. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.72937, -97.76834 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,325 ft
1 wells filed one
Completion to plug
11.7 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,325 ft.

Completions filed
Jan 2001
1 of 1 wells
Plug dates filed
Sep 2012
1 of 1 wells

Last completion to plug: a median of 11.7 years across the 1 well that filed both dates, with the middle half between 11.7 years and 11.7 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3373336416,325 ftJan 2001Sep 2012Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (143)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

143 months

Nov 2012086.953.62$0
Oct 2012089.383.40$0
Sep 20122394.672.92$2,177
Aug 2012092.662.91$0
Jul 2012085.133.02$0
Jun 2012079.822.52$0
May 2012091.612.49$0
Apr 20120101.652.00$0
Mar 20120105.052.22$0
Feb 20120101.102.57$0
Jan 2012098.092.73$0
Dec 2011096.873.24$0
Nov 2011095.723.31$0
Oct 2011084.983.65$0
Sep 2011083.623.99$0
Aug 2011083.404.15$0
Jul 2011094.144.52$0
Jun 2011092.904.64$0
May 2011098.134.40$0
Apr 20110105.964.33$0
Mar 2011096.364.06$0
Feb 2011085.644.18$0
Jan 2011086.504.59$0
Dec 2010085.734.35$0
Nov 2010080.843.80$0
Oct 201011078.103.51$8,591
Sep 2010072.633.98$0
Aug 2010073.684.42$0
Jul 2010072.554.74$0
Jun 2010070.364.91$0
May 2010071.124.24$0
Apr 2010081.694.12$0
Mar 2010078.394.39$0
Feb 2010073.585.44$0
Jan 2010074.365.96$0
Dec 2009071.445.48$0
Nov 2009074.593.75$0
Oct 2009072.544.11$0
Sep 2009065.543.06$0
Aug 2009067.423.22$0
Jul 2009061.133.46$0
Jun 2009066.163.90$0
May 2009054.743.93$0
Apr 2009046.773.59$0
Mar 2009042.144.06$0
Feb 2009032.814.63$0
Jan 2009035.865.37$0
Dec 2008037.105.98$0
Nov 2008055.496.86$0
Oct 2008075.246.92$0
Sep 20080101.767.88$0
Aug 20080114.228.48$0
Jul 20080131.0811.39$0
Jun 20080131.3313.03$0
May 2008163123.1711.57$20,077
Apr 20080110.3110.45$0
Mar 20080101.909.66$0
Feb 2008092.538.77$0
Jan 2008990.388.21$813
Dec 2007088.337.30$0
Nov 2007091.677.29$0
Oct 2007082.856.92$0
Sep 2007075.846.24$0
Aug 2007069.066.39$0
Jul 2007070.906.39$0
Jun 200716262.007.55$10,044
May 2007058.747.85$0
Apr 2007059.617.81$0
Mar 2007056.927.30$0
Feb 200715855.108.22$8,706
Jan 2007050.306.73$0
Dec 2006056.656.92$0
Nov 200616054.207.62$8,672
Oct 2006054.906.01$0
Sep 2006060.085.04$0
Aug 2006068.717.34$0
Jul 2006069.376.34$0
Jun 2006066.286.38$0
May 200615966.016.42$10,496
Apr 2006064.397.36$0
Mar 200613556.707.08$7,655
Feb 2006057.597.75$0
Jan 200612560.598.93$7,574
Dec 2005054.9413.42$0
Nov 200516354.6910.59$8,914
Oct 2005058.3413.80$0
Sep 2005061.4512.08$0
Aug 200513861.519.80$8,488
Jul 2005055.697.84$0
Jun 200514252.337.38$7,431
May 200514445.226.65$6,512
Apr 2005049.207.36$0
Mar 200515450.377.15$7,757
Feb 200516045.226.31$7,235
Jan 2005043.166.32$0
Dec 200414639.866.75$5,820
Nov 200416645.286.33$7,516
Oct 2004049.706.52$0
Sep 200413643.245.28$5,881
Aug 200416942.375.55$7,161
Jul 200416638.286.08$6,354
Jun 2004036.106.43$0
May 200415837.486.49$5,922
Apr 200414134.475.86$4,860
Mar 200414934.365.53$5,120
Feb 200416332.455.51$5,289
Jan 200414832.036.30$4,740
Dec 200316230.266.30$4,902
Nov 2003028.804.60$0
Oct 200314628.174.76$4,113
Sep 200315526.314.75$4,078
Aug 200315929.765.13$4,732
Jul 200317129.415.17$5,029
Jun 200314728.565.98$4,198
May 200317126.595.97$4,547
Apr 200316426.675.41$4,374
Mar 2003031.146.10$0
Feb 200316333.487.93$5,457
Jan 200316630.315.58$5,031
Dec 200215826.914.85$4,252
Nov 2002024.664.14$0
Oct 200217326.464.23$4,578
Sep 2002027.443.64$0
Aug 200216125.963.16$4,180
Jul 200216624.583.06$4,080
Jun 2002023.733.34$0
May 200216924.663.58$4,168
Apr 200216123.653.51$3,808
Mar 200216322.003.10$3,586
Feb 200216418.222.38$2,988
Jan 200217017.172.38$2,919
Dec 2001016.932.36$0
Nov 200116418.072.41$2,963
Oct 200116419.782.53$3,244
Sep 200134824.262.25$8,442
Aug 200116524.873.05$4,104
Jul 200116123.933.20$3,853
Jun 200132824.563.82$8,056
May 200115825.524.31$4,032
Apr 200130624.685.34$7,552
Mar 200167024.545.38$16,442
Feb 200174227.755.77$20,591
Jan 2001027.478.40$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2012 — as filed, then multipliedworked
Oil                   23 bbl  × $ 94.67 =     $2,177

────────────────────────────────────────────────────
Month total                                   $2,177

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/O/29862 is the state's own key, not one this site invented.