SANTA ROSA

Operated by GEORGETOWN OPERATING COMPANY (P-5 301276) in the UNDERWOOD-RAY (CONGLOMERATE) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 30196District 09Field 92436500OilCasinghead gasSaveExport
Value, all time
$90 k
Aug 2003 – Jun 2019
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
191
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 9 leases and 14 wells, and the rule below applies to all of them.

Discovered
1952-10-18
as the register files it
Field class
Oil and gas
the register's own label
Between wells
660 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition1,056 bbl$61,770
Casinghead gasProduction5,835 Mcf$28,713
Total$90,482

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.6368, -97.9787. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.63684, -97.97867 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,300 ft
1 wells filed one
Completion to plug
13.7 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,300 ft.

Completions filed
Sep 2003
1 of 1 wells
Plug dates filed
May 2017
1 of 1 wells

Last completion to plug: a median of 13.7 years across the 1 well that filed both dates, with the middle half between 13.7 years and 13.7 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3373356116,300 ftSep 2003May 2017Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (191)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

191 months

Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 201961056.803.06$3,465
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140194.734.73$5
Apr 20140195.944.81$5
Mar 20140195.895.06$5
Feb 20140197.406.19$6
Jan 20140190.404.86$5
Dec 20130191.824.35$4
Nov 20130188.853.74$4
Oct 20130197.423.78$4
Sep 201301104.113.72$4
Aug 201301104.253.52$4
Jul 201301102.523.72$4
Jun 20130194.403.93$4
May 20130194.834.15$4
Apr 20130193.964.28$4
Mar 20130193.623.91$4
Feb 20130191.233.42$3
Jan 20130191.603.42$3
Dec 20120186.773.42$3
Nov 20120186.953.62$4
Oct 201278189.383.40$6,975
Sep 20120194.672.92$3
Aug 20120192.662.91$3
Jul 20120185.133.02$3
Jun 20120179.822.52$3
May 20120191.612.49$2
Apr 201201101.652.00$2
Mar 201201105.052.22$2
Feb 201201101.102.57$3
Jan 20120198.092.73$3
Dec 20110196.873.24$3
Nov 20110195.723.31$3
Oct 20110184.983.65$4
Sep 20110183.623.99$4
Aug 20110183.404.15$4
Jul 20110194.144.52$5
Jun 20110192.904.64$5
May 20110198.134.40$4
Apr 201101105.964.33$4
Mar 20110196.364.06$4
Feb 20110185.644.18$4
Jan 20110186.504.59$5
Dec 20100185.734.35$4
Nov 20100180.843.80$4
Oct 20100178.103.51$4
Sep 20100172.633.98$4
Aug 20100173.684.42$4
Jul 20100172.554.74$5
Jun 20100170.364.91$5
May 201047171.124.24$3,347
Apr 20100181.694.12$4
Mar 20100178.394.39$4
Feb 20100173.585.44$5
Jan 20100174.365.96$6
Dec 20090171.445.48$5
Nov 20090174.593.75$4
Oct 20090172.544.11$4
Sep 20090165.543.06$3
Aug 20090167.423.22$3
Jul 20090161.133.46$3
Jun 20090166.163.90$4
May 200985154.743.93$4,657
Apr 20090146.773.59$4
Mar 20090142.144.06$4
Feb 20090132.814.63$5
Jan 20090135.865.37$5
Dec 20080137.105.98$6
Nov 20080155.496.86$7
Oct 20080175.246.92$7
Sep 200801101.767.88$8
Aug 200801114.228.48$8
Jul 200801131.0811.39$11
Jun 2008891131.3313.03$11,701
May 200801123.1711.57$12
Apr 200801110.3110.45$10
Mar 200801101.909.66$10
Feb 20080192.538.77$9
Jan 20080190.388.21$8
Dec 20070188.337.30$7
Nov 20070191.677.29$7
Oct 20070182.856.92$7
Sep 20070175.846.24$6
Aug 200772169.066.39$4,979
Jul 20070170.906.39$6
Jun 20070162.007.55$8
May 20070158.747.85$8
Apr 20070159.617.81$8
Mar 20070156.927.30$7
Feb 20070155.108.22$8
Jan 200785150.306.73$4,282
Dec 20060156.656.92$7
Nov 20060154.207.62$8
Oct 20060154.906.01$6
Sep 20060160.085.04$5
Aug 2006111168.717.34$7,634
Jul 20060169.376.34$6
Jun 20060166.286.38$6
May 20060166.016.42$6
Apr 20060164.397.36$7
Mar 20060156.707.08$7
Feb 20060157.597.75$8
Jan 20060160.598.93$9
Dec 20050154.9413.42$13
Nov 20050154.6910.59$11
Oct 20050158.3413.80$14
Sep 200581161.4512.08$4,990
Aug 20050161.519.80$10
Jul 20050155.697.84$8
Jun 20050152.337.38$7
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040138.286.08$6
Jun 20040136.106.43$6
May 20040137.486.49$6
Apr 20040134.475.86$6
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 200316962530.266.30$9,052
Nov 2003061728.804.60$2,835
Oct 200302,09728.174.76$9,981
Sep 20031782,38326.314.75$16,001
Aug 20030129.765.13$5

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2019 — as filed, then multipliedworked
Oil                   61 bbl  × $ 56.80 =     $3,465
Casinghead gas         0 Mcf  × $  3.06 =         $0

────────────────────────────────────────────────────
Month total                                   $3,465

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/O/30196 is the state's own key, not one this site invented.