EMBRY

Operated by ARROWHEAD PRODUCTIONS, LP (P-5 33523) in the ST. JO RIDGE (BARNETT SHALE) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 30505District 09Field 79656050OilCasinghead gasSaveExport
Value, all time
$1.9 M
Sep 2005 – Jan 2015
Value, last 12 filed months
$0
at the published price for each month
Months reported
113
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 69 leases and 78 wells, and the rule below applies to all of them.

Discovered
2001-09-07
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-03-14.

The Commission's schedule remark for this field reads: WITHIN DESIGN. INTERVAL OF FIELD, WHICH IS 7410'-8370'.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition17,136 bbl$1,165,193
Casinghead gasProduction96,043 Mcf$750,947
Total$1,916,140

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.6301, -97.5852. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.63008, -97.58517 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
7,900 ft
1 wells filed one
Completion to plug
8.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,900 ft.

Completions filed
Aug 2005
1 of 1 wells
Plug dates filed
Jun 2014
1 of 1 wells

Last completion to plug: a median of 8.8 years across the 1 well that filed both dates, with the middle half between 8.8 years and 8.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3373371217,900 ftAug 2005Jun 2014Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (113)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

113 months

Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 201180094.144.52$7,531
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 20109073.684.42$663
Jul 20100072.554.74$0
Jun 201013070.364.91$915
May 2010172971.124.24$1,332
Apr 20102013381.694.12$16,556
Mar 201039428178.394.39$32,119
Feb 201019618673.585.44$15,434
Jan 20101674.365.96$110
Dec 20090271.445.48$11
Nov 20090974.593.75$34
Oct 200917072.544.11$1,233
Sep 20095065.543.06$328
Aug 2009537167.423.22$1,531
Jul 200918767861.133.46$13,780
Jun 200911,09766.163.90$4,339
May 200901,46854.743.93$5,763
Apr 20091931,57246.773.59$14,666
Mar 200901,72142.144.06$6,986
Feb 20091961,61632.814.63$13,918
Jan 20091951,47635.865.37$14,920
Dec 200819693837.105.98$12,878
Nov 20081951,78355.496.86$23,053
Oct 20081891,68875.246.92$25,905
Sep 20081971,712101.767.88$33,532
Aug 20083861,867114.228.48$59,927
Jul 200801,563131.0811.39$17,802
Jun 20083791,629131.3313.03$71,004
May 200801,715123.1711.57$19,850
Apr 20085771,732110.3110.45$81,757
Mar 20081941,874101.909.66$37,879
Feb 200811,43592.538.77$12,678
Jan 20083861,64590.388.21$48,385
Dec 20071961,64688.337.30$29,332
Nov 20073951,95591.677.29$50,465
Oct 20073862,12282.856.92$46,669
Sep 20071842,03575.846.24$26,661
Aug 20073792,28569.066.39$40,770
Jul 20073641,78070.906.39$37,178
Jun 20071961,31862.007.55$22,101
May 20071992,49358.747.85$31,250
Apr 20075832,30959.617.81$52,775
Mar 20073882,46656.927.30$40,092
Feb 20071992,29155.108.22$29,788
Jan 20073971,85450.306.73$32,441
Dec 20061991,85556.656.92$24,107
Nov 20065612,89854.207.62$52,482
Oct 20061981,84254.906.01$21,948
Sep 20063791,79360.085.04$31,802
Aug 20063881,95668.717.34$41,016
Jul 20067532,88069.376.34$70,503
Jun 20063782,14766.286.38$38,760
May 20063923,28966.016.42$47,008
Apr 20065872,73364.397.36$57,913
Mar 20065783,25656.707.08$55,835
Feb 20064002,44557.597.75$41,987
Jan 20069812,56160.598.93$82,317
Dec 20057983,55654.9413.42$91,547
Nov 20051,3125,42954.6910.59$129,238
Oct 20059562,72358.3413.80$93,339
Sep 20050061.4512.08$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2011 — as filed, then multipliedworked
Oil                   80 bbl  × $ 94.14 =     $7,531
Casinghead gas         0 Mcf  × $  4.52 =         $0

────────────────────────────────────────────────────
Month total                                   $7,531

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/O/30505 is the state's own key, not one this site invented.