DONNELL, W.T. "C"

Operated by FISHCREEK MINERALS, LLC (P-5 269832) in the YOUNG COUNTY REGULAR field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 30712District 09Field 99480001OilCasinghead gasSaveExport
Value, all time
$616 k
Jan 2005 – May 2026
Value, last 12 filed months
$26 k
at the published price for each month
Months reported
257
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,525 leases and 8,014 wells, and the rule below applies to all of them.

Discovered
1917-12-31
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition6,378 bbl$449,543
Casinghead gasProduction37,754 Mcf$166,504
Total$616,047

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.0388, -98.8572. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.03876, -98.85725 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
4,325 ft
1 wells filed one
Completion to plug
1 well filed both, dated out of order

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,325 ft.

Completions filed
Sep 2003
1 of 1 wells
Plug dates filed
Feb 1981
1 of 1 wells

Last completion to plug: no median is published. 1 well on this lease filed both dates, and on that one the last completion is dated after the plug date, so there is no interval to take a median of. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-5033455014,325 ftSep 2003Feb 1981

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (257)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

257 months

May 2026030106.413.05$91
Apr 2026010298.932.87$293
Mar 2026010389.753.15$324
Feb 2026010163.503.75$379
Jan 20261666759.138.00$10,351
Dec 202507356.664.41$322
Nov 2025011958.593.93$467
Oct 202506359.383.30$208
Sep 2025010162.743.08$311
Aug 2025013163.933.01$395
Jul 20251739866.743.32$11,871
Jun 2025017466.483.13$544
May 2025012060.553.23$388
Apr 2025012662.363.54$446
Mar 202517220567.704.27$12,519
Feb 2025016870.884.34$729
Jan 2025014774.324.28$629
Dec 20240068.993.12$0
Nov 2024017869.052.20$391
Oct 202403571.372.28$80
Sep 20240069.612.36$0
Aug 2024024675.632.06$508
Jul 20240279.932.15$4
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 202305972.852.39$141
Feb 202303775.112.47$91
Jan 20231663676.533.39$12,826
Dec 2022010376.415.73$590
Nov 2022012885.005.65$723
Oct 2022022287.185.86$1,302
Sep 202201984.888.16$155
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 20220131115.097.98$1,045
May 202206109.378.43$51
Apr 2022076104.226.84$520
Mar 2022083108.885.08$421
Feb 202205591.054.86$267
Jan 2022018181.844.54$821
Dec 202102471.323.90$94
Nov 202109277.435.24$482
Oct 202117418879.795.71$14,958
Sep 2021026269.865.35$1,402
Aug 2021027866.024.22$1,173
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 202101050.412.81$28
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200736.972.48$17
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 2020023634.901.69$399
May 2020046916.921.81$851
Apr 2020030414.751.80$549
Mar 202004130.341.86$76
Feb 202017512449.881.98$8,975
Jan 2020014757.252.09$308
Dec 2019017559.012.30$403
Nov 2019010355.302.75$283
Oct 2019020653.472.42$498
Sep 2019020155.052.66$534
Aug 201903453.112.30$78
Jul 2019012556.272.46$308
Jun 2019010552.782.49$262
May 201903758.482.74$101
Apr 20191672962.632.75$10,539
Mar 201903256.803.06$98
Feb 2019016250.852.79$452
Jan 2019014746.033.23$475
Dec 201804746.594.19$197
Nov 2018020952.934.24$886
Oct 201808661.443.40$292
Sep 2018013859.543.11$429
Aug 201815912559.403.07$9,828
Jul 2018012365.142.93$361
Jun 2018014760.183.08$452
May 2018015165.382.90$438
Apr 201818018763.842.90$12,034
Mar 2018113861.222.79$446
Feb 2018010161.782.77$279
Jan 201808262.874.01$329
Dec 2017012857.272.92$374
Nov 2017018955.423.12$589
Oct 201706449.292.98$191
Sep 2017010847.523.09$333
Aug 201717713145.373.00$8,424
Jul 2017015543.873.09$479
Jun 2017021542.493.09$664
May 201707645.373.26$248
Apr 201709547.933.21$305
Mar 2017016946.772.98$504
Feb 2017010050.452.95$295
Jan 2017014649.413.42$499
Dec 201616915148.763.72$8,803
Nov 2016013642.492.64$360
Oct 2016015046.193.09$464
Sep 2016013741.553.10$425
Aug 2016018741.442.92$547
Jul 201617619441.622.92$7,892
Jun 2016016545.352.69$443
May 201617726142.521.99$8,046
Apr 201609236.561.99$183
Mar 2016010833.011.79$194
Feb 2016011526.472.06$237
Jan 2016014627.352.36$345
Dec 2015016832.362.00$336
Nov 2015017738.792.17$384
Oct 2015017043.552.43$413
Sep 2015018042.992.76$497
Aug 2015017840.162.87$511
Jul 201517817748.152.95$9,092
Jun 2015020156.152.88$579
May 2015016355.212.96$482
Apr 2015019249.822.71$520
Mar 2015019642.892.93$575
Feb 201516523344.662.98$8,062
Jan 2015017243.433.10$533
Dec 2014018954.693.59$679
Nov 2014021770.464.25$923
Oct 2014022278.303.90$866
Sep 2014022286.164.05$898
Aug 2014020389.394.04$819
Jul 201418121896.564.18$18,389
Jun 2014020598.164.74$971
May 2014021194.734.73$997
Apr 2014021295.944.81$1,020
Mar 2014022595.895.06$1,138
Feb 2014018797.406.19$1,158
Jan 201418720390.404.86$17,892
Dec 2013019991.824.35$867
Nov 2013019588.853.74$729
Oct 2013019597.423.78$737
Sep 20130196104.113.72$729
Aug 20130153104.253.52$539
Jul 2013174154102.523.72$18,411
Jun 2013019194.403.93$751
May 2013020394.834.15$842
Apr 2013016293.964.28$694
Mar 2013018993.623.91$740
Feb 2013018991.233.42$646
Jan 201315525191.603.42$15,056
Dec 2012016286.773.42$554
Nov 2012020886.953.62$754
Oct 2012021789.383.40$738
Sep 2012013594.672.92$394
Aug 20121684392.662.91$15,692
Jul 2012020085.133.02$604
Jun 2012019179.822.52$481
May 2012017691.612.49$438
Apr 2012171189101.652.00$17,760
Mar 20120199105.052.22$442
Feb 20120157101.102.57$404
Jan 2012022098.092.73$602
Dec 201116896.873.24$317
Nov 2011018895.723.31$623
Oct 2011122884.983.65$917
Sep 2011023983.623.99$953
Aug 201115826083.404.15$14,256
Jul 2011026294.144.52$1,184
Jun 20111092.904.64$93
May 2011025198.134.40$1,106
Apr 20110224105.964.33$971
Mar 201118123096.364.06$18,374
Feb 2011022785.644.18$949
Jan 2011023986.504.59$1,097
Dec 2010024585.734.35$1,065
Nov 2010024780.843.80$937
Oct 2010026678.103.51$933
Sep 201016627872.633.98$13,163
Aug 2010030973.684.42$1,366
Jul 2010030672.554.74$1,449
Jun 2010031870.364.91$1,562
May 2010033471.124.24$1,415
Apr 2010031581.694.12$1,299
Mar 201017023678.394.39$14,362
Feb 2010117073.585.44$999
Jan 2010029174.365.96$1,736
Dec 2009015571.445.48$850
Nov 200916727674.593.75$13,492
Oct 2009033472.544.11$1,373
Sep 2009031765.543.06$972
Aug 2009030267.423.22$972
Jul 200917125661.133.46$11,340
Jun 2009024866.163.90$966
May 2009028254.743.93$1,107
Apr 2009013746.773.59$491
Mar 200917336642.144.06$8,776
Feb 2009033332.814.63$1,543
Jan 2009036235.865.37$1,944
Dec 2008042137.105.98$2,516
Nov 200817830055.496.86$11,935
Oct 2008018775.246.92$1,294
Sep 20080159101.767.88$1,252
Aug 20080134114.228.48$1,137
Jul 200816965131.0811.39$22,893
Jun 20080175131.3313.03$2,281
May 20080162123.1711.57$1,875
Apr 200800110.3110.45$0
Mar 2008168229101.909.66$19,332
Feb 2008022092.538.77$1,930
Jan 2008025790.388.21$2,109
Dec 2007029788.337.30$2,169
Nov 2007034191.677.29$2,486
Oct 200717134682.856.92$16,562
Sep 2007031675.846.24$1,973
Aug 2007034469.066.39$2,197
Jul 200718038870.906.39$15,241
Jun 2007040862.007.55$3,080
May 200718343358.747.85$14,147
Apr 2007040959.617.81$3,192
Mar 200717243856.927.30$12,989
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 200635658556.656.92$24,215
Nov 2006062254.207.62$4,738
Oct 2006030954.906.01$1,858
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Oil                    0 bbl  × $106.41 =         $0
Casinghead gas        30 Mcf  × $  3.05 =        $91

────────────────────────────────────────────────────
Month total                                      $91

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/O/30712 is the state's own key, not one this site invented.