RUTHERFORD, BENNIE D.

Operated by ARUBA PETROLEUM, INC. (P-5 33762) in the NEWARK, EAST (BARNETT SHALE) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 30714District 09Field 65280200OilCasinghead gasSaveExport
Value, all time
$516 k
Nov 2006 – Jul 2014
Value, last 12 filed months
$11 k
at the published price for each month
Months reported
93
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 21,881 leases and 22,468 wells, and the rule below applies to all of them.

Discovered
1981-10-15
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2009-09-29.

The Commission's schedule remark for this field reads: DESIGNATED AS UFT FIELD PER DOCKET 01-0299858

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition1,445 bbl$96,077
Casinghead gasProduction64,212 Mcf$420,058
Total$516,135

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.4176, -97.4411. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.41758, -97.44110 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,706 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,706 ft.

Completions filed
Mar 2014
1 of 1 wells

1 well

42-4973606938,706 ftMar 2014Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (93)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

93 months

Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 201447095.895.06$4,507
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 2013630104.253.52$6,568
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 2012012591.612.49$311
Apr 20120101101.652.00$202
Mar 2012105176105.052.22$11,421
Feb 20120213101.102.57$547
Jan 2012020798.092.73$566
Dec 201106996.873.24$224
Nov 2011029695.723.31$980
Oct 2011060584.983.65$2,207
Sep 2011030883.623.99$1,228
Aug 2011039183.404.15$1,622
Jul 2011047794.144.52$2,155
Jun 2011035092.904.64$1,624
May 2011036098.134.40$1,586
Apr 20110376105.964.33$1,629
Mar 2011094296.364.06$3,822
Feb 201101,26485.644.18$5,283
Jan 2011048786.504.59$2,235
Dec 2010082285.734.35$3,574
Nov 2010068080.843.80$2,581
Oct 2010034478.103.51$1,207
Sep 2010031072.633.98$1,234
Aug 2010071473.684.42$3,155
Jul 2010059072.554.74$2,795
Jun 2010055970.364.91$2,745
May 2010052571.124.24$2,223
Apr 2010035181.694.12$1,447
Mar 2010051778.394.39$2,269
Feb 2010059673.585.44$3,244
Jan 201001,27874.365.96$7,622
Dec 200902,14571.445.48$11,763
Nov 200901,37574.593.75$5,158
Oct 2009091972.544.11$3,777
Sep 200901,26365.543.06$3,871
Aug 200902,30567.423.22$7,419
Jul 2009014961.133.46$516
Jun 2009028666.163.90$1,114
May 200917839354.743.93$11,287
Apr 2009059446.773.59$2,131
Mar 2009055042.144.06$2,232
Feb 2009062832.814.63$2,910
Jan 2009073335.865.37$3,937
Dec 2008058137.105.98$3,473
Nov 200801,13755.496.86$7,800
Oct 200801,52775.246.92$10,570
Sep 200801,151101.767.88$9,067
Aug 200801,023114.228.48$8,678
Jul 20080682131.0811.39$7,768
Jun 200801,176131.3313.03$15,326
May 200801,953123.1711.57$22,605
Apr 200801,109110.3110.45$11,594
Mar 20080976101.909.66$9,432
Feb 200801,78392.538.77$15,638
Jan 200802,72690.388.21$22,369
Dec 20071481,64588.337.30$25,085
Nov 2007098391.677.29$7,168
Oct 200702,27782.856.92$15,761
Sep 200701,67375.846.24$10,446
Aug 2007054569.066.39$3,481
Jul 20070070.906.39$0
Jun 2007064462.007.55$4,861
May 2007059258.747.85$4,645
Apr 20071752,99859.617.81$33,832
Mar 200701,83056.927.30$13,363
Feb 20073703,29655.108.22$47,467
Jan 200702,07250.306.73$13,938
Dec 20063592,10256.656.92$34,880
Nov 200602,35854.207.62$17,962

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2014 — as filed, then multipliedworked
Oil                   47 bbl  × $ 95.89 =     $4,507
Casinghead gas         0 Mcf  × $  5.06 =         $0

────────────────────────────────────────────────────
Month total                                   $4,507

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/O/30714 is the state's own key, not one this site invented.