CLIFTON 2-DENTON COUNTY

Operated by WLH PRODUCTION LLC (P-5 102515) in the BIG BUCK (CADDO 1ST) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 30887District 09Field 07767470OilSaveExport
Value, all time
$2.2 M
Nov 2007 – May 2026
Value, last 12 filed months
$25 k
at the published price for each month
Months reported
223
no gaps in the span
Streams
1
oil

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 15 leases and 16 wells, and the rule below applies to all of them.

Discovered
1974-03-21
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,300 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 80 acres.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition28,527 bbl$2,191,771
Total$2,191,771

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.3239, -97.1862. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.32387, -97.18623 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
2,060 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 2,060 ft.

Completions filed
Jun 1974
1 of 1 wells

1 well

42-1210006612,060 ftJun 1974

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (223)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

223 months

May 20260106.413.05$0
Apr 202614298.932.87$14,048
Mar 2026089.753.15$0
Feb 2026063.503.75$0
Jan 2026059.138.00$0
Dec 2025056.664.41$0
Nov 2025058.593.93$0
Oct 202518259.383.30$10,807
Sep 2025062.743.08$0
Aug 2025063.933.01$0
Jul 2025066.743.32$0
Jun 2025066.483.13$0
May 2025060.553.23$0
Apr 2025062.363.54$0
Mar 2025067.704.27$0
Feb 20258570.884.34$6,025
Jan 2025074.324.28$0
Dec 2024068.993.12$0
Nov 2024069.052.20$0
Oct 2024071.372.28$0
Sep 2024069.612.36$0
Aug 2024075.632.06$0
Jul 2024079.932.15$0
Jun 2024078.082.63$0
May 2024078.812.20$0
Apr 2024084.451.66$0
Mar 2024080.301.55$0
Feb 202415076.091.78$11,414
Jan 2024073.023.30$0
Dec 202315071.262.61$10,689
Nov 2023077.892.81$0
Oct 2023085.443.09$0
Sep 2023089.042.74$0
Aug 2023080.522.67$0
Jul 2023074.852.64$0
Jun 2023068.962.26$0
May 202315070.622.23$10,593
Apr 2023078.122.24$0
Mar 2023072.852.39$0
Feb 2023075.112.47$0
Jan 2023076.533.39$0
Dec 2022076.415.73$0
Nov 20224085.005.65$3,400
Oct 20222987.185.86$2,528
Sep 202218284.888.16$15,448
Aug 2022094.529.13$0
Jul 2022177101.587.54$17,980
Jun 20220115.097.98$0
May 20220109.378.43$0
Apr 20220104.226.84$0
Mar 2022221108.885.08$24,062
Feb 2022091.054.86$0
Jan 2022081.844.54$0
Dec 2021071.323.90$0
Nov 20212577.435.24$1,936
Oct 202116579.795.71$13,165
Sep 2021069.865.35$0
Aug 2021066.024.22$0
Jul 2021070.783.98$0
Jun 20218269.493.38$5,698
May 20217063.483.02$4,444
Apr 2021060.362.76$0
Mar 2021061.302.72$0
Feb 2021057.805.55$0
Jan 2021050.412.81$0
Dec 2020044.642.68$0
Nov 2020038.772.71$0
Oct 2020036.972.48$0
Sep 2020037.091.99$0
Aug 2020039.982.39$0
Jul 2020038.371.83$0
Jun 202016334.901.69$5,689
May 20203016.921.81$508
Apr 2020014.751.80$0
Mar 2020030.341.86$0
Feb 2020049.881.98$0
Jan 2020057.252.09$0
Dec 201911259.012.30$6,609
Nov 2019055.302.75$0
Oct 2019053.472.42$0
Sep 2019055.052.66$0
Aug 2019053.112.30$0
Jul 2019056.272.46$0
Jun 2019052.782.49$0
May 201915858.482.74$9,240
Apr 2019062.632.75$0
Mar 2019056.803.06$0
Feb 2019050.852.79$0
Jan 201914946.033.23$6,858
Dec 2018046.594.19$0
Nov 2018052.934.24$0
Oct 2018061.443.40$0
Sep 201816059.543.11$9,526
Aug 2018059.403.07$0
Jul 2018065.142.93$0
Jun 2018060.183.08$0
May 201816965.382.90$11,049
Apr 2018063.842.90$0
Mar 201816061.222.79$9,795
Feb 2018061.782.77$0
Jan 2018062.874.01$0
Dec 2017057.272.92$0
Nov 2017055.423.12$0
Oct 2017049.292.98$0
Sep 2017047.523.09$0
Aug 201716145.373.00$7,305
Jul 2017043.873.09$0
Jun 2017042.493.09$0
May 201716745.373.26$7,577
Apr 2017047.933.21$0
Mar 2017046.772.98$0
Feb 2017050.452.95$0
Jan 2017049.413.42$0
Dec 201616048.763.72$7,802
Nov 2016042.492.64$0
Oct 2016046.193.09$0
Sep 2016041.553.10$0
Aug 2016041.442.92$0
Jul 2016041.622.92$0
Jun 2016045.352.69$0
May 201616342.521.99$6,931
Apr 2016036.561.99$0
Mar 2016033.011.79$0
Feb 201615526.472.06$4,103
Jan 2016027.352.36$0
Dec 201516432.362.00$5,307
Nov 2015038.792.17$0
Oct 2015043.552.43$0
Sep 2015042.992.76$0
Aug 2015040.162.87$0
Jul 2015048.152.95$0
Jun 2015056.152.88$0
May 2015055.212.96$0
Apr 2015049.822.71$0
Mar 2015042.892.93$0
Feb 2015044.662.98$0
Jan 2015043.433.10$0
Dec 2014054.693.59$0
Nov 2014070.464.25$0
Oct 2014078.303.90$0
Sep 201414786.164.05$12,666
Aug 2014089.394.04$0
Jul 201430896.564.18$29,740
Jun 201449398.164.74$48,393
May 201449394.734.73$46,702
Apr 201416295.944.81$15,542
Mar 201417295.895.06$16,493
Feb 201416797.406.19$16,266
Jan 201432690.404.86$29,470
Dec 2013091.824.35$0
Nov 201333588.853.74$29,765
Oct 201315997.423.78$15,490
Sep 2013325104.113.72$33,836
Aug 20130104.253.52$0
Jul 2013162102.523.72$16,608
Jun 201331794.403.93$29,925
May 2013094.834.15$0
Apr 201316893.964.28$15,785
Mar 201333593.623.91$31,363
Feb 201316791.233.42$15,235
Jan 2013091.603.42$0
Dec 2012086.773.42$0
Nov 2012086.953.62$0
Oct 201232689.383.40$29,138
Sep 201249594.672.92$46,862
Aug 2012092.662.91$0
Jul 201216385.133.02$13,876
Jun 201232179.822.52$25,622
May 201233091.612.49$30,231
Apr 2012329101.652.00$33,443
Mar 2012331105.052.22$34,772
Feb 2012330101.102.57$33,363
Jan 201267098.092.73$65,720
Dec 201133296.873.24$32,161
Nov 201165895.723.31$62,984
Oct 201131884.983.65$27,024
Sep 201149483.623.99$41,308
Aug 201148983.404.15$40,783
Jul 201165594.144.52$61,662
Jun 201132592.904.64$30,193
May 201116698.134.40$16,290
Apr 2011499105.964.33$52,874
Mar 201149996.364.06$48,084
Feb 2011085.644.18$0
Jan 2011086.504.59$0
Dec 201016685.734.35$14,231
Nov 201016680.843.80$13,419
Oct 2010078.103.51$0
Sep 2010072.633.98$0
Aug 201033273.684.42$24,462
Jul 201032872.554.74$23,796
Jun 201032870.364.91$23,078
May 2010071.124.24$0
Apr 201066181.694.12$53,997
Mar 201066078.394.39$51,737
Feb 201067173.585.44$49,372
Jan 201033374.365.96$24,762
Dec 200933071.445.48$23,575
Nov 200967474.593.75$50,274
Oct 200950072.544.11$36,270
Sep 200957365.543.06$37,554
Aug 200965367.423.22$44,025
Jul 200965961.133.46$40,285
Jun 200999466.163.90$65,763
May 200998654.743.93$53,974
Apr 200948446.773.59$22,637
Mar 200949942.144.06$21,028
Feb 200966332.814.63$21,753
Jan 200933335.865.37$11,941
Dec 200866937.105.98$24,820
Nov 200831755.496.86$17,590
Oct 200828575.246.92$21,443
Sep 2008254101.767.88$25,847
Aug 2008122114.228.48$13,935
Jul 20080131.0811.39$0
Jun 20080131.3313.03$0
May 20080123.1711.57$0
Apr 20080110.3110.45$0
Mar 20080101.909.66$0
Feb 2008092.538.77$0
Jan 2008090.388.21$0
Dec 2007088.337.30$0
Nov 2007091.677.29$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Oil                  142 bbl  × $ 98.93 =    $14,048

────────────────────────────────────────────────────
Month total                                  $14,048

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/O/30887 is the state's own key, not one this site invented.