SEAY E

Operated by KEIRUS, INC. (P-5 453692) in the K-M-A (ELLENBURGER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 30917District 09Field 47902332OilCasinghead gasSaveExport
Value, all time
$1.8 M
Mar 2006 – May 2026
Value, last 12 filed months
$58 k
at the published price for each month
Months reported
243
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 33 leases and 53 wells, and the rule below applies to all of them.

Discovered
1940-04-07
as the register files it
Field class
Oil
the register's own label
Between wells
660 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1991-04-01.

The Commission's schedule remark for this field reads: 20 ACRE UNIT 73 BPD., 40 ACRE UNIT 93 BPD. TOP.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition25,845 bbl$1,777,412
Casinghead gasProduction18,048 Mcf$62,490
Total$1,839,902

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.8869, -98.8197. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.88693, -98.81967 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
4,070 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,070 ft.

Completions filed
Mar 2006
1 of 1 wells

1 well

42-485440802R4,070 ftMar 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (243)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

243 months

May 202600106.413.05$0
Apr 202659098.932.87$5,837
Mar 202658089.753.15$5,206
Feb 202657063.503.75$3,620
Jan 2026115059.138.00$6,800
Dec 202562056.664.41$3,513
Nov 202558058.593.93$3,398
Oct 202556059.383.30$3,325
Sep 2025116062.743.08$7,278
Aug 202558063.933.01$3,708
Jul 2025117066.743.32$7,809
Jun 2025118066.483.13$7,845
May 202559060.553.23$3,572
Apr 202557062.363.54$3,555
Mar 202558067.704.27$3,927
Feb 202558070.884.34$4,111
Jan 2025115074.324.28$8,547
Dec 2024116068.993.12$8,003
Nov 202458069.052.20$4,005
Oct 2024113071.372.28$8,065
Sep 2024112069.612.36$7,796
Aug 202460075.632.06$4,538
Jul 2024115079.932.15$9,192
Jun 20241154378.082.63$9,092
May 202411715878.812.20$9,568
Apr 202411615584.451.66$10,053
Mar 202411815980.301.55$9,721
Feb 202411814976.091.78$9,244
Jan 20245715973.023.30$4,686
Dec 202311813971.262.61$8,772
Nov 202311513977.892.81$9,348
Oct 20235517285.443.09$5,230
Sep 2023112089.042.74$9,972
Aug 202356080.522.67$4,509
Jul 2023167574.852.64$12,513
Jun 20235615668.962.26$4,214
May 202310916270.622.23$8,058
Apr 20235515278.122.24$4,637
Mar 2023110072.852.39$8,014
Feb 202311115175.112.47$8,710
Jan 2023112276.533.39$8,578
Dec 202255176.415.73$4,208
Nov 2022113285.005.65$9,616
Oct 2022109187.185.86$9,508
Sep 202211010084.888.16$10,153
Aug 20225412994.529.13$6,281
Jul 2022111129101.587.54$12,248
Jun 202256112115.097.98$7,338
May 202252111109.378.43$6,623
Apr 2022107108104.226.84$11,890
Mar 2022111111108.885.08$12,649
Feb 202210912191.054.86$10,512
Jan 20226015781.844.54$5,623
Dec 202110913671.323.90$8,304
Nov 20215513477.435.24$4,960
Oct 202111215479.795.71$9,816
Sep 20218614969.865.35$6,805
Aug 20215516566.024.22$4,328
Jul 202116717670.783.98$12,521
Jun 20215617269.493.38$4,473
May 202111417563.483.02$7,765
Apr 202111016160.362.76$7,084
Mar 202111316961.302.72$7,386
Feb 20215512657.805.55$3,878
Jan 202110914050.412.81$5,888
Dec 202011013744.642.68$5,277
Nov 202011013338.772.71$4,625
Oct 202016713736.972.48$6,514
Sep 20205415537.091.99$2,311
Aug 202016516039.982.39$6,978
Jul 202011115938.371.83$4,549
Jun 202016614834.901.69$6,044
May 20205516816.921.81$1,235
Apr 20205716914.751.80$1,146
Mar 202016813230.341.86$5,342
Feb 202011014449.881.98$5,772
Jan 202014316157.252.09$8,524
Dec 201911115959.012.30$6,917
Nov 201911015255.302.75$6,501
Oct 201916615653.472.42$9,253
Sep 201910813955.052.66$6,315
Aug 201911015153.112.30$6,190
Jul 201910815256.272.46$6,451
Jun 201916816852.782.49$9,286
May 201911214858.482.74$6,955
Apr 201911712062.632.75$7,658
Mar 201911215456.803.06$6,833
Feb 201911414850.852.79$6,210
Jan 201911210346.033.23$5,488
Dec 201816911946.594.19$8,372
Nov 20181159552.934.24$6,489
Oct 20181149561.443.40$7,327
Sep 20181687459.543.11$10,233
Aug 20181116959.403.07$6,805
Jul 201811311265.142.93$7,689
Jun 20181948060.183.08$11,921
May 20181138365.382.90$7,629
Apr 20181688163.842.90$10,960
Mar 20181158861.222.79$7,286
Feb 20181679261.782.77$10,572
Jan 20181159262.874.01$7,599
Dec 20171759957.272.92$10,311
Nov 20171688455.423.12$9,573
Oct 20171128049.292.98$5,759
Sep 20171668047.523.09$8,135
Aug 20171108745.373.00$5,252
Jul 20171678243.873.09$7,579
Jun 20171669742.493.09$7,353
May 20171688245.373.26$7,890
Apr 20171079147.933.21$5,421
Mar 20172238946.772.98$10,695
Feb 20171138950.452.95$5,964
Jan 20171669249.413.42$8,517
Dec 2016568648.763.72$3,051
Nov 2016167042.492.64$7,096
Oct 201616611846.193.09$8,032
Sep 20161699141.553.10$7,304
Aug 20161138641.442.92$4,934
Jul 20161668541.622.92$7,157
Jun 20161636345.352.69$7,561
May 20161665842.521.99$7,174
Apr 20161684136.561.99$6,224
Mar 2016165033.011.79$5,447
Feb 2016167826.472.06$4,437
Jan 20161642527.352.36$4,545
Dec 20151666132.362.00$5,494
Nov 20151678438.792.17$6,660
Oct 2015166043.552.43$7,229
Sep 20151664242.992.76$7,252
Aug 201516710140.162.87$6,997
Jul 20151679248.152.95$8,312
Jun 20151658756.152.88$9,516
May 20151689255.212.96$9,547
Apr 20151687449.822.71$8,570
Mar 20151709442.892.93$7,567
Feb 201517111744.662.98$7,985
Jan 201516910443.433.10$7,662
Dec 201417611154.693.59$10,024
Nov 201416610070.464.25$12,122
Oct 20141706278.303.90$13,553
Sep 20141696686.164.05$14,828
Aug 20142207789.394.04$19,977
Jul 20141708196.564.18$16,754
Jun 20141656998.164.74$16,523
May 20141709194.734.73$16,534
Apr 20141697495.944.81$16,570
Mar 20142258195.895.06$21,985
Feb 20141186197.406.19$11,871
Jan 20141715890.404.86$15,740
Dec 2013225091.824.35$20,660
Nov 2013170088.853.74$15,105
Oct 2013176097.423.78$17,146
Sep 20131700104.113.72$17,699
Aug 20131690104.253.52$17,618
Jul 20131150102.523.72$11,790
Jun 20131701294.403.93$16,095
May 2013170294.834.15$16,129
Apr 20131703593.964.28$16,123
Mar 20131696593.623.91$16,076
Feb 20131118591.233.42$10,417
Jan 2013168091.603.42$15,389
Dec 2012112086.773.42$9,718
Nov 201222612286.953.62$20,093
Oct 20121697889.383.40$15,370
Sep 20121678494.672.92$16,055
Aug 201216620892.662.91$15,986
Jul 201216912185.133.02$14,752
Jun 2012225079.822.52$17,960
May 20121129191.612.49$10,487
Apr 2012226131101.652.00$23,234
Mar 2012225136105.052.22$23,938
Feb 201211553101.102.57$11,763
Jan 201211516298.092.73$11,723
Dec 201111114096.873.24$11,206
Nov 201116811395.723.31$16,455
Oct 201111112884.983.65$9,900
Sep 201116812883.623.99$14,558
Aug 20111675583.404.15$14,156
Jul 20111116494.144.52$10,739
Jun 20111656892.904.64$15,644
May 20111107898.134.40$11,138
Apr 201111295105.964.33$12,279
Mar 201116711496.364.06$16,555
Feb 201111311885.644.18$10,171
Jan 201111213686.504.59$10,312
Dec 201011216285.734.35$10,306
Nov 201011416280.843.80$9,831
Oct 201011114378.103.51$9,171
Sep 20101134872.633.98$8,398
Aug 20101673973.684.42$12,477
Jul 2010567172.554.74$4,399
Jun 20101126370.364.91$8,190
May 20101115771.124.24$8,136
Apr 20101116581.694.12$9,336
Mar 2010555478.394.39$4,548
Feb 201011017473.585.44$9,041
Jan 20105619374.365.96$5,315
Dec 200911014871.445.48$8,670
Nov 20095511474.593.75$4,530
Oct 2009558672.544.11$4,343
Sep 20091098965.543.06$7,417
Aug 2009559167.423.22$4,001
Jul 200911010761.133.46$7,095
Jun 20095510066.163.90$4,028
May 20091079654.743.93$6,234
Apr 20091099546.773.59$5,439
Mar 200910810042.144.06$4,957
Feb 20092310432.814.63$1,236
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Oil                   59 bbl  × $ 98.93 =     $5,837
Casinghead gas         0 Mcf  × $  2.87 =         $0

────────────────────────────────────────────────────
Month total                                   $5,837

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well