MORRISON

Operated by PERRY OPERATING INC. (P-5 656847) in the I.M.U. (CADDO CONS.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 30929District 09Field 44112075OilSaveExport
Value, all time
$1.5 M
Mar 2008 – May 2026
Value, last 12 filed months
$70 k
at the published price for each month
Months reported
219
no gaps in the span
Streams
1
oil

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 55 leases and 266 wells, and the rule below applies to all of them.

Discovered
not filed
Field class
Oil
the register's own label
Between wells
660 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 1996-11-01.

The Commission's schedule remark for this field reads: DOCKET 09-0213374.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition21,809 bbl$1,529,388
Total$1,529,388

Wells on this lease (2)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.1978, -98.6539. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.1 miles.

33.19783, -98.65389 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 2 wells
With a plug date
0.0%
0 of 2 wells
Median depth
4,727 ft
2 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
2100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 4,720 and 4,734 ft, median 4,727 ft, over the 2 wells that filed a depth.

Completions filed
Jul 1981 – Jun 1984
2 of 2 wells

2 wells

42-5033786734,720 ftJun 1984
42-5033417614,734 ftJul 1981

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (219)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

219 months

May 20260106.413.05$0
Apr 20269498.932.87$9,299
Mar 20269989.753.15$8,885
Feb 202615863.503.75$10,033
Jan 2026059.138.00$0
Dec 20258756.664.41$4,929
Nov 20259758.593.93$5,683
Oct 20259759.383.30$5,760
Sep 202510762.743.08$6,713
Aug 202510563.933.01$6,713
Jul 20257866.743.32$5,206
Jun 20259766.483.13$6,449
May 202510260.553.23$6,176
Apr 202515362.363.54$9,541
Mar 2025067.704.27$0
Feb 202512870.884.34$9,073
Jan 202515574.324.28$11,520
Dec 2024068.993.12$0
Nov 202415469.052.20$10,634
Oct 202416071.372.28$11,419
Sep 2024069.612.36$0
Aug 2024075.632.06$0
Jul 202415179.932.15$12,069
Jun 2024078.082.63$0
May 202416478.812.20$12,925
Apr 202415184.451.66$12,752
Mar 2024080.301.55$0
Feb 202414376.091.78$10,881
Jan 2024073.023.30$0
Dec 202315271.262.61$10,832
Nov 202315677.892.81$12,151
Oct 2023085.443.09$0
Sep 202317789.042.74$15,760
Aug 202315080.522.67$12,078
Jul 2023074.852.64$0
Jun 202315368.962.26$10,551
May 202315670.622.23$11,017
Apr 2023078.122.24$0
Mar 202314472.852.39$10,490
Feb 202315175.112.47$11,342
Jan 2023076.533.39$0
Dec 202215576.415.73$11,844
Nov 2022085.005.65$0
Oct 202215587.185.86$13,513
Sep 2022084.888.16$0
Aug 202215294.529.13$14,367
Jul 20220101.587.54$0
Jun 2022155115.097.98$17,839
May 20220109.378.43$0
Apr 2022154104.226.84$16,050
Mar 2022171108.885.08$18,618
Feb 2022091.054.86$0
Jan 202216381.844.54$13,340
Dec 202114371.323.90$10,199
Nov 2021077.435.24$0
Oct 202116279.795.71$12,926
Sep 202117869.865.35$12,435
Aug 20211566.024.22$990
Jul 202117070.783.98$12,033
Jun 2021069.493.38$0
May 2021063.483.02$0
Apr 202116660.362.76$10,020
Mar 2021061.302.72$0
Feb 20211057.805.55$578
Jan 202116550.412.81$8,318
Dec 202017644.642.68$7,857
Nov 2020738.772.71$271
Oct 202016436.972.48$6,063
Sep 2020537.091.99$185
Aug 202017239.982.39$6,877
Jul 20202138.371.83$806
Jun 202050834.901.69$17,729
May 20201116.921.81$186
Apr 2020014.751.80$0
Mar 20201430.341.86$425
Feb 202017649.881.98$8,779
Jan 20201257.252.09$687
Dec 201915559.012.30$9,147
Nov 201917755.302.75$9,788
Oct 2019053.472.42$0
Sep 201916255.052.66$8,918
Aug 2019053.112.30$0
Jul 201915756.272.46$8,834
Jun 2019852.782.49$422
May 201915958.482.74$9,298
Apr 20191062.632.75$626
Mar 201915856.803.06$8,974
Feb 201915850.852.79$8,034
Jan 2019046.033.23$0
Dec 2018046.594.19$0
Nov 201833252.934.24$17,573
Oct 2018061.443.40$0
Sep 2018059.543.11$0
Aug 201815759.403.07$9,326
Jul 201814065.142.93$9,120
Jun 201815860.183.08$9,508
May 201815865.382.90$10,330
Apr 201815863.842.90$10,087
Mar 201816761.222.79$10,224
Feb 201817161.782.77$10,564
Jan 20181862.874.01$1,132
Dec 2017357.272.92$172
Nov 20171255.423.12$665
Oct 2017849.292.98$394
Sep 2017347.523.09$143
Aug 201715645.373.00$7,078
Jul 201715543.873.09$6,800
Jun 201716042.493.09$6,798
May 2017045.373.26$0
Apr 201716047.933.21$7,669
Mar 201732046.772.98$14,966
Feb 201716250.452.95$8,173
Jan 201716149.413.42$7,955
Dec 2016048.763.72$0
Nov 201615742.492.64$6,671
Oct 201615746.193.09$7,252
Sep 2016041.553.10$0
Aug 201616041.442.92$6,630
Jul 201617341.622.92$7,200
Jun 2016045.352.69$0
May 201617442.521.99$7,398
Apr 2016036.561.99$0
Mar 201615333.011.79$5,051
Feb 201616426.472.06$4,341
Jan 201616827.352.36$4,595
Dec 2015032.362.00$0
Nov 201516138.792.17$6,245
Oct 2015043.552.43$0
Sep 201516842.992.76$7,222
Aug 201517340.162.87$6,948
Jul 2015048.152.95$0
Jun 201533356.152.88$18,698
May 2015055.212.96$0
Apr 201517049.822.71$8,469
Mar 2015042.892.93$0
Feb 2015044.662.98$0
Jan 2015043.433.10$0
Dec 201415954.693.59$8,696
Nov 2014070.464.25$0
Oct 201416178.303.90$12,606
Sep 201416086.164.05$13,786
Aug 2014089.394.04$0
Jul 201417196.564.18$16,512
Jun 2014098.164.74$0
May 201417094.734.73$16,104
Apr 2014095.944.81$0
Mar 201416895.895.06$16,110
Feb 201416997.406.19$16,461
Jan 2014090.404.86$0
Dec 201316691.824.35$15,242
Nov 2013088.853.74$0
Oct 201316997.423.78$16,464
Sep 20130104.113.72$0
Aug 2013163104.253.52$16,993
Jul 2013165102.523.72$16,916
Jun 2013094.403.93$0
May 201317094.834.15$16,121
Apr 201315093.964.28$14,094
Mar 2013093.623.91$0
Feb 201316591.233.42$15,053
Jan 2013091.603.42$0
Dec 201215786.773.42$13,623
Nov 201216386.953.62$14,173
Oct 2012089.383.40$0
Sep 201215194.672.92$14,295
Aug 201216992.662.91$15,660
Jul 201217185.133.02$14,557
Jun 2012079.822.52$0
May 201216691.612.49$15,207
Apr 2012171101.652.00$17,382
Mar 20120105.052.22$0
Feb 2012172101.102.57$17,389
Jan 2012098.092.73$0
Dec 201117396.873.24$16,759
Nov 201116795.723.31$15,985
Oct 2011084.983.65$0
Sep 201114483.623.99$12,041
Aug 201116283.404.15$13,511
Jul 2011094.144.52$0
Jun 2011092.904.64$0
May 201113298.134.40$12,953
Apr 2011148105.964.33$15,682
Mar 201113996.364.06$13,394
Feb 201117085.644.18$14,559
Jan 2011086.504.59$0
Dec 201026485.734.35$22,633
Nov 201031480.843.80$25,384
Oct 2010078.103.51$0
Sep 201017272.633.98$12,492
Aug 2010073.684.42$0
Jul 201015172.554.74$10,955
Jun 201016170.364.91$11,328
May 2010071.124.24$0
Apr 201016781.694.12$13,642
Mar 2010078.394.39$0
Feb 201015673.585.44$11,478
Jan 201016974.365.96$12,567
Dec 2009071.445.48$0
Nov 2009074.593.75$0
Oct 200917072.544.11$12,332
Sep 200916065.543.06$10,486
Aug 2009067.423.22$0
Jul 200914861.133.46$9,047
Jun 200916666.163.90$10,983
May 2009054.743.93$0
Apr 200914246.773.59$6,641
Mar 200914542.144.06$6,110
Feb 200917332.814.63$5,676
Jan 2009035.865.37$0
Dec 200816637.105.98$6,159
Nov 2008055.496.86$0
Oct 2008075.246.92$0
Sep 2008163101.767.88$16,587
Aug 2008175114.228.48$19,989
Jul 20080131.0811.39$0
Jun 2008174131.3313.03$22,851
May 20080123.1711.57$0
Apr 20080110.3110.45$0
Mar 2008299101.909.66$30,468

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Oil                   94 bbl  × $ 98.93 =     $9,299

────────────────────────────────────────────────────
Month total                                   $9,299

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/O/30929 is the state's own key, not one this site invented.