Operated by RAYMOND'S OPERATING, INC. (P-5 695675) in the K-M-A field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 6235District 09Field 47902001OilCasinghead gasSaveExport
Value, all time
$710 k
Jan 1993 – May 2026
Value, last 12 filed months
$11 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 347 leases and 2,190 wells, and the rule below applies to all of them.

Discovered
1931-12-31
as the register files it
Field class
Oil
the register's own label
Between wells
660 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition14,043 bbl$695,906
Casinghead gasProduction14,132 Mcf$14,179
Total$710,085

8,304 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.8489, -98.8072. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.84891, -98.80718 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
no depth filed
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

1 well

42-485869701

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260189.753.15$3
Feb 20260163.503.75$4
Jan 20260159.138.00$8
Dec 20250156.664.41$4
Nov 2025179158.593.93$10,492
Oct 20250159.383.30$3
Sep 20250162.743.08$3
Aug 20250163.933.01$3
Jul 20250166.743.32$3
Jun 20250166.483.13$3
May 2025177160.553.23$10,721
Apr 20250162.363.54$4
Mar 20250167.704.27$4
Feb 20250170.884.34$4
Jan 20250174.324.28$4
Dec 20240168.993.12$3
Nov 20240169.052.20$2
Oct 2024181171.372.28$12,920
Sep 20240169.612.36$2
Aug 20240175.632.06$2
Jul 20240179.932.15$2
Jun 2024177178.082.63$13,823
May 20240178.812.20$2
Apr 20240184.451.66$2
Mar 20240180.301.55$2
Feb 20240176.091.78$2
Jan 2024178173.023.30$13,001
Dec 20230171.262.61$3
Nov 20230177.892.81$3
Oct 20230185.443.09$3
Sep 2023175189.042.74$15,585
Aug 20230180.522.67$3
Jul 20230174.852.64$3
Jun 20230168.962.26$2
May 20230170.622.23$2
Apr 2023164178.122.24$12,814
Mar 20230172.852.39$2
Feb 20230175.112.47$2
Jan 20230176.533.39$3
Dec 20220176.415.73$6
Nov 20220185.005.65$6
Oct 2022171187.185.86$14,914
Sep 20220184.888.16$8
Aug 20220194.529.13$9
Jul 202201101.587.54$8
Jun 20221711115.097.98$19,688
May 202201109.378.43$8
Apr 202201104.226.84$7
Mar 202201108.885.08$5
Feb 20220191.054.86$5
Jan 2022166181.844.54$13,590
Dec 20210171.323.90$4
Nov 20210177.435.24$5
Oct 20210179.795.71$6
Sep 20210169.865.35$5
Aug 20210166.024.22$4
Jul 2021169170.783.98$11,966
Jun 20210169.493.38$3
May 20210163.483.02$3
Apr 20210160.362.76$3
Mar 2021170161.302.72$10,424
Feb 20210157.805.55$6
Jan 20210150.412.81$3
Dec 20200144.642.68$3
Nov 2020171138.772.71$6,632
Oct 20200136.972.48$2
Sep 20200137.091.99$2
Aug 20200139.982.39$2
Jul 20200138.371.83$2
Jun 2020168134.901.69$5,865
May 20200116.921.81$2
Apr 20200114.751.80$2
Mar 20200130.341.86$2
Feb 2020165149.881.98$8,232
Jan 20200157.252.09$2
Dec 20190159.012.30$2
Nov 2019170155.302.75$9,404
Oct 20190153.472.42$2
Sep 20190155.052.66$3
Aug 20190153.112.30$2
Jul 20190156.272.46$2
Jun 2019162152.782.49$8,553
May 20190158.482.74$3
Apr 20190162.632.75$3
Mar 2019171156.803.06$9,716
Feb 20190150.852.79$3
Jan 20190146.033.23$3
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 2018170061.443.40$10,445
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 2018172065.382.90$11,245
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 2017168055.423.12$9,311
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 2017166043.873.09$7,282
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 2017170049.413.42$8,400
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160141.553.10$3
Aug 2016169141.442.92$7,006
Jul 20160141.622.92$3
Jun 20160145.352.69$3
May 20160142.521.99$2
Apr 20160136.561.99$2
Mar 20160133.011.79$2
Feb 2016168126.472.06$4,449
Jan 20160127.352.36$2
Dec 20150132.362.00$2
Nov 20150138.792.17$2
Oct 20150143.552.43$2
Sep 20150142.992.76$3
Aug 2015168140.162.87$6,750
Jul 20150148.152.95$3
Jun 20150156.152.88$3
May 20150155.212.96$3
Apr 20150149.822.71$3
Mar 20150142.892.93$3
Feb 20150144.662.98$3
Jan 2015171143.433.10$7,430
Dec 20140154.693.59$4
Nov 20140170.464.25$4
Oct 20140178.303.90$4
Sep 20140186.164.05$4
Aug 20140189.394.04$4
Jul 2014169196.564.18$16,323
Jun 20140198.164.74$5
May 20140194.734.73$5
Apr 20140195.944.81$5
Mar 20140195.895.06$5
Feb 20140197.406.19$6
Jan 2014171190.404.86$15,463
Dec 20130191.824.35$4
Nov 20130188.853.74$4
Oct 20130197.423.78$4
Sep 201301104.113.72$4
Aug 201301104.253.52$4
Jul 201301102.523.72$4
Jun 2013171194.403.93$16,146
May 20130194.834.15$4
Apr 20130193.964.28$4
Mar 20130193.623.91$4
Feb 20130191.233.42$3
Jan 20130191.603.42$3
Dec 2012174186.773.42$15,101
Nov 20120186.953.62$4
Oct 20120189.383.40$3
Sep 20120194.672.92$3
Aug 20120192.662.91$3
Jul 20120185.133.02$3
Jun 20120179.822.52$3
May 2012173191.612.49$15,851
Apr 201201101.652.00$2
Mar 201201105.052.22$2
Feb 201201101.102.57$3
Jan 20120198.092.73$3
Dec 2011165196.873.24$15,987
Nov 20110195.723.31$3
Oct 20110184.983.65$4
Sep 20110183.623.99$4
Aug 20110183.404.15$4
Jul 20110194.144.52$5
Jun 2011168192.904.64$15,612
May 20110198.134.40$4
Apr 201101105.964.33$4
Mar 20110196.364.06$4
Feb 20110185.644.18$4
Jan 2011170186.504.59$14,710
Dec 20100185.734.35$4
Nov 20100180.843.80$4
Oct 20100178.103.51$4
Sep 20100172.633.98$4
Aug 20100173.684.42$4
Jul 2010170172.554.74$12,338
Jun 20100170.364.91$5
May 20100171.124.24$4
Apr 20100181.694.12$4
Mar 20100178.394.39$4
Feb 201090173.585.44$6,628
Jan 20100174.365.96$6
Dec 2009169171.445.48$12,079
Nov 20090174.593.75$4
Oct 20090172.544.11$4
Sep 20090165.543.06$3
Aug 20090167.423.22$3
Jul 2009165161.133.46$10,090
Jun 20090166.163.90$4
May 20090154.743.93$4
Apr 20090146.773.59$4
Mar 2009166142.144.06$6,999
Feb 20090132.814.63$5
Jan 20090135.865.37$5
Dec 20080137.105.98$6
Nov 20080155.496.86$7
Oct 2008176175.246.92$13,249
Sep 200801101.767.88$8
Aug 200801114.228.48$8
Jul 200801131.0811.39$11
Jun 200801131.3313.03$13
May 20081731123.1711.57$21,320
Apr 200801110.3110.45$10
Mar 200801101.909.66$10
Feb 2008176192.538.77$16,294
Jan 20080190.388.21$8
Dec 20070188.337.30$7
Nov 20070191.677.29$7
Oct 20070182.856.92$7
Sep 20070175.846.24$6
Aug 2007173169.066.39$11,954
Jul 20070170.906.39$6
Jun 20070162.007.55$8
May 20070158.747.85$8
Apr 20070159.617.81$8
Mar 2007175156.927.30$9,968
Feb 20070155.108.22$8
Jan 20070150.306.73$7
Dec 20060156.656.92$7
Nov 20060154.207.62$8
Oct 2006173154.906.01$9,504
Sep 20060160.085.04$5
Aug 20060168.717.34$7
Jul 20060169.376.34$6
Jun 2006169166.286.38$11,208
May 20060166.016.42$6
Apr 20060164.397.36$7
Mar 20060156.707.08$7
Feb 20060157.597.75$8
Jan 20060160.598.93$9
Dec 2005170154.9413.42$9,353
Nov 20050154.6910.59$11
Oct 20050158.3413.80$14
Sep 20050161.4512.08$12
Aug 2005174161.519.80$10,713
Jul 20050155.697.84$8
Jun 20050152.337.38$7
May 20050145.226.65$7
Apr 20050149.207.36$7
Mar 2005172150.377.15$8,671
Feb 20050145.226.31$6
Jan 20050143.166.32$6
Dec 20040139.866.75$7
Nov 2004175145.286.33$7,930
Oct 20040149.706.52$7
Sep 20040143.245.28$5
Aug 20040142.375.55$6
Jul 20040138.286.08$6
Jun 2004174136.106.43$6,288
May 20040137.486.49$6
Apr 20040134.475.86$6
Mar 20040134.365.53$6
Feb 20040132.455.51$6
Jan 2004177132.036.30$5,676
Dec 20030130.266.30$6
Nov 20030128.804.60$5
Oct 20030128.174.76$5
Sep 2003172126.314.75$4,530
Aug 20030129.765.13$5
Jul 20030129.415.17$5
Jun 20030128.565.98$6
May 20030126.595.97$6
Apr 2003175126.675.41$4,673
Mar 20030131.146.10$6
Feb 20030133.487.93$8
Jan 20030130.315.58$6
Dec 2002177126.914.85$4,768
Nov 20020124.664.14$4
Oct 20020126.464.23$4
Sep 20020127.443.64$4
Aug 20020125.963.16$3
Jul 2002174124.583.06$4,280
Jun 20020123.733.34$3
May 20020124.663.58$4
Apr 20020123.653.51$4
Mar 20020122.003.10$3
Feb 20020118.222.38$2
Jan 2002162117.172.38$2,784
Dec 20010116.932.36$2
Nov 20010118.072.41$2
Oct 20010119.782.53$3
Sep 2001173124.262.25$4,199
Aug 20010124.873.05$3
Jul 20010123.933.20$3
Jun 20010124.563.82$4
May 2001171125.524.31$4,368
Apr 20010124.685.34$5
Mar 20010124.545.38$5
Feb 20010127.755.77$6
Jan 20010127.478.40$8
Dec 2000190126.889.12$5,116
Nov 20000132.215.66$6
Oct 20000131.235.15$5
Sep 20000131.875.19$5
Aug 20000129.644.54$5
Jul 2000185128.534.09$5,282
Jun 20000129.304.40$4
May 20000127.263.68$4
Apr 20000124.513.12$3
Mar 20000128.422.86$3
Feb 2000191127.622.73$5,278
Jan 20000125.272.48$2
Dec 19990124.282.42$2
Nov 19990123.192.43$2
Oct 19990120.982.80$3
Sep 199971121.752.62$1,547
Aug 1999017319.262.88$497
Jul 1999017317.892.37$410
Jun 199918417315.942.36$3,342
May 1999017315.792.32$402
Apr 1999017315.102.21$382
Mar 1999017312.471.84$318
Feb 199901739.981.82$314
Jan 199918817310.381.90$2,280
Dec 199801739.201.77$307
Nov 1998017310.892.19$378
Oct 1998017312.421.97$341
Sep 199817717312.592.08$2,589
Aug 1998017311.301.91$330
Jul 1998017311.742.24$387
Jun 1998017311.242.24$387
May 199818017312.622.21$2,653
Apr 1998017313.042.51$433
Mar 1998017312.802.31$400
Feb 1998017313.952.30$398
Jan 199817917314.702.15$3,004
Dec 1997017316.322.41$417
Nov 1997017318.193.09$534
Oct 1997017319.253.15$545
Sep 1997017317.742.95$511
Aug 199717817317.862.55$3,621
Jul 1997017317.582.25$389
Jun 1997017317.242.26$391
May 1997017318.972.31$399
Apr 199717917317.882.08$3,561
Mar 1997017318.951.94$335
Feb 1997017320.492.21$382
Jan 199717717323.483.54$4,768
Dec 1996017323.32$0
Nov 1996017321.97$0
Oct 199618117323.31$4,219
Sep 1996017322.22$0
Aug 1996017320.26$0
Jul 1996017319.55$0
Jun 1996017318.73$0
May 199617117319.43$3,323
Apr 1996017321.51$0
Mar 1996017319.38$0
Feb 199617717316.98$3,005
Jan 1996017317.07$0
Dec 1995017317.19$0
Nov 1995017316.00$0
Oct 1995017315.43$0
Sep 199518117316.18$2,929
Aug 1995017315.92$0
Jul 1995017315.24$0
Jun 1995017316.41$0
May 199517517317.56$3,073
Apr 1995017317.73$0
Mar 1995017316.44$0
Feb 1995017316.58$0
Jan 1995017315.92$0
Dec 1994017315.03$0
Nov 199417317315.90$2,751
Oct 1994017315.58$0
Sep 1994017315.29$0
Aug 1994017316.13$0
Jul 1994017317.56$0
Jun 199417917317.09$3,059
May 1994017315.88$0
Apr 1994017314.14$0
Mar 1994017312.46$0
Feb 1994017312.50$0
Jan 199417817312.66$2,253
Dec 1993017312.33$0
Nov 1993017314.49$0
Oct 1993017315.85$0
Sep 1993017315.03$0
Aug 199318117315.66$2,834
Jul 1993017315.46$0
Jun 1993017316.79$0
May 1993017317.68$0
Apr 1993017318.05$0
Mar 199317917318.14$3,247
Feb 1993017317.90$0
Jan 1993017316.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2026 — as filed, then multipliedworked
Oil                    0 bbl  × $ 89.75 =         $0
Casinghead gas         1 Mcf  × $  3.15 =         $3

────────────────────────────────────────────────────
Month total                                       $3

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/O/6235 is the state's own key, not one this site invented.