JONES-FORD UNIT

Operated by TB PETROLEUM, LLC (P-5 840287) in the ARCHER COUNTY REGULAR field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 8555District 09Field 03446001OilCasinghead gasSaveExport
Value, all time
$1.4 M
Jan 1993 – May 2026
Value, last 12 filed months
$70 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,166 leases and 11,249 wells, and the rule below applies to all of them.

Discovered
1911-12-31
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition30,767 bbl$1,441,707
Casinghead gasProduction21 Mcf$0
Total$1,441,707

21 Mcf of this lease's gas, across 21 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (9)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.8072, -98.5812. A lease has no coordinate of its own — that point is the mean of its wells, and they span 1.1 miles.

33.80697, -98.58278 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
88.9%
8 of 9 wells
With a plug date
77.8%
7 of 9 wells
Median depth
4,420 ft
9 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
888.9%
A plug date is filed
777.8%
BothOn the schedule and plugged. Neither fact cancels the other.
777.8%
NeitherNo plug date, and not on the schedule.
111.1%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Total depth in feet, 9 of 9 wells. Median 4,420 ft, with the middle half between 4,410 and 4,421 ft; the shallowest is 4,250 ft and the deepest 5,533 ft. The median is published rather than the mean, because a single mis-keyed depth moves a mean and cannot move a median.

When they were last completed

Last completion by decade, 2 of 9 wells, Jun 1958 – Jun 2020. This is the LAST completion filed on each wellbore, not the first — a well recompleted in 2019 counts once, in the 2010s.

Completions filed
Jun 1958 – Jun 2020
2 of 9 wells; 7 filed none
Plug dates filed
Oct 1971 – Nov 1971
7 of 9 wells; 2 filed none

9 wells

42-00907347114,410 ftOct 1971Yes
42-00907349134,250 ftOct 1971Yes
42-0090745334,421 ftNov 1971Yes
42-0090745544,410 ftOct 1971Yes
42-0090745624,420 ftNov 1971Yes
42-0090745755,533 ftNov 1971Yes
42-0098775874,398 ftNov 1971Yes
42-00983945104,420 ftJun 2020
42-0090614216 U4,774 ftJun 1958Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202600106.413.05$0
Apr 2026170098.932.87$16,818
Mar 20260089.753.15$0
Feb 2026174063.503.75$11,049
Jan 20260059.138.00$0
Dec 2025172056.664.41$9,746
Nov 2025171058.593.93$10,019
Oct 20250059.383.30$0
Sep 2025172062.743.08$10,791
Aug 20250063.933.01$0
Jul 2025170066.743.32$11,346
Jun 20250066.483.13$0
May 2025172060.553.23$10,415
Apr 20250062.363.54$0
Mar 2025172067.704.27$11,644
Feb 20250070.884.34$0
Jan 2025172074.324.28$12,783
Dec 20240068.993.12$0
Nov 2024171069.052.20$11,808
Oct 2024170071.372.28$12,133
Sep 20240069.612.36$0
Aug 2024173075.632.06$13,084
Jul 2024173079.932.15$13,828
Jun 20240078.082.63$0
May 2024170078.812.20$13,398
Apr 20240084.451.66$0
Mar 2024171080.301.55$13,731
Feb 20240076.091.78$0
Jan 2024167073.023.30$12,194
Dec 20230071.262.61$0
Nov 2023177077.892.81$13,787
Oct 2023174085.443.09$14,867
Sep 20230089.042.74$0
Aug 2023169080.522.67$13,608
Jul 2023176074.852.64$13,174
Jun 20230068.962.26$0
May 2023171070.622.23$12,076
Apr 20231078.122.24$78
Mar 2023181072.852.39$13,186
Feb 2023174075.112.47$13,069
Jan 20231076.533.39$77
Dec 2022173076.415.73$13,219
Nov 2022169085.005.65$14,365
Oct 2022169087.185.86$14,733
Sep 20220084.888.16$0
Aug 2022177094.529.13$16,730
Jul 202200101.587.54$0
Jun 20221760115.097.98$20,256
May 20221800109.378.43$19,687
Apr 202200104.226.84$0
Mar 20221790108.885.08$19,490
Feb 20220091.054.86$0
Jan 2022174081.844.54$14,240
Dec 2021170071.323.90$12,124
Nov 20210077.435.24$0
Oct 2021185079.795.71$14,761
Sep 20210069.865.35$0
Aug 2021167066.024.22$11,025
Jul 2021183070.783.98$12,953
Jun 20210069.493.38$0
May 2021182063.483.02$11,553
Apr 20211060.362.76$60
Mar 2021174061.302.72$10,666
Feb 2021180057.805.55$10,404
Jan 20210050.412.81$0
Dec 2020166044.642.68$7,410
Nov 20200038.772.71$0
Oct 2020172036.972.48$6,359
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20202038.371.83$77
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 2018185060.183.08$11,133
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 2016194026.472.06$5,135
Jan 20160027.352.36$0
Dec 2015264032.362.00$8,543
Nov 20150038.792.17$0
Oct 2015219043.552.43$9,537
Sep 2015171042.992.76$7,351
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 2015310056.152.88$17,407
May 201532055.212.96$1,767
Apr 2015337049.822.71$16,789
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 2015167043.433.10$7,253
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 2014168089.394.04$15,018
Jul 20140096.564.18$0
Jun 2014335098.164.74$32,884
May 20140094.734.73$0
Apr 2014168095.944.81$16,118
Mar 2014169095.895.06$16,205
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 2013161088.853.74$14,305
Oct 2013171097.423.78$16,659
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 2013173094.403.93$16,331
May 2013172094.834.15$16,311
Apr 20130093.964.28$0
Mar 2013174093.623.91$16,290
Feb 2013169091.233.42$15,418
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 2012177089.383.40$15,820
Sep 20120094.672.92$0
Aug 2012175092.662.91$16,216
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 2012131098.092.73$12,850
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 201193092.904.64$8,640
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 2010368073.684.42$27,114
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20101071.124.24$71
Apr 20100081.694.12$0
Mar 20104078.394.39$314
Feb 20100073.585.44$0
Jan 20101074.365.96$74
Dec 2009150071.445.48$10,716
Nov 20094074.593.75$298
Oct 20091072.544.11$73
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 2009166066.163.90$10,983
May 20090054.743.93$0
Apr 20090046.773.59$0
Mar 200958042.144.06$2,444
Feb 2009316032.814.63$10,368
Jan 20092035.865.37$72
Dec 2008169037.105.98$6,270
Nov 20080055.496.86$0
Oct 2008397075.246.92$29,870
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 20081770131.0811.39$23,201
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 20083050110.3110.45$33,645
Mar 200800101.909.66$0
Feb 2008180092.538.77$16,655
Jan 20080090.388.21$0
Dec 2007178088.337.30$15,723
Nov 20070091.677.29$0
Oct 200759082.856.92$4,888
Sep 2007183075.846.24$13,879
Aug 2007165069.066.39$11,395
Jul 2007176070.906.39$12,478
Jun 20070062.007.55$0
May 2007180058.747.85$10,573
Apr 2007169059.617.81$10,074
Mar 2007180056.927.30$10,246
Feb 20070055.108.22$0
Jan 2007181050.306.73$9,104
Dec 2006127056.656.92$7,195
Nov 2006186054.207.62$10,081
Oct 20060054.906.01$0
Sep 2006177060.085.04$10,634
Aug 20060068.717.34$0
Jul 2006183069.376.34$12,695
Jun 2006180066.286.38$11,930
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 2003148028.174.76$4,169
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 200396026.595.97$2,553
Apr 20030026.675.41$0
Mar 2003145031.146.10$4,515
Feb 2003191033.487.93$6,395
Jan 20030030.315.58$0
Dec 2002145026.914.85$3,902
Nov 2002174024.664.14$4,291
Oct 20020026.464.23$0
Sep 2002175027.443.64$4,802
Aug 2002133025.963.16$3,453
Jul 20020024.583.06$0
Jun 2002129023.733.34$3,061
May 2002187024.663.58$4,611
Apr 2002179023.653.51$4,233
Mar 20020022.003.10$0
Feb 20020018.222.38$0
Jan 2002187017.172.38$3,211
Dec 20010016.932.36$0
Nov 2001177018.072.41$3,198
Oct 20010019.782.53$0
Sep 2001187024.262.25$4,537
Aug 20010024.873.05$0
Jul 2001157023.933.20$3,757
Jun 2001147024.563.82$3,610
May 2001188025.524.31$4,798
Apr 20010024.685.34$0
Mar 2001131024.545.38$3,215
Feb 20010027.755.77$0
Jan 2001149027.478.40$4,093
Dec 2000162026.889.12$4,355
Nov 20000032.215.66$0
Oct 2000148031.235.15$4,622
Sep 20000031.875.19$0
Aug 200051029.644.54$1,512
Jul 2000117028.534.09$3,338
Jun 2000104029.304.40$3,047
May 2000178027.263.68$4,852
Apr 20000024.513.12$0
Mar 2000218028.422.86$6,196
Feb 20000027.622.73$0
Jan 20000025.272.48$0
Dec 1999162024.282.42$3,933
Nov 1999179023.192.43$4,151
Oct 19990020.982.80$0
Sep 199968021.752.62$1,479
Aug 199953019.262.88$1,021
Jul 1999142017.892.37$2,540
Jun 199995015.942.36$1,514
May 1999139015.792.32$2,195
Apr 1999109015.102.21$1,646
Mar 1999102012.471.84$1,272
Feb 199911109.981.82$1,108
Jan 1999150010.381.90$1,557
Dec 199813309.201.77$1,224
Nov 1998150010.892.19$1,634
Oct 1998144012.421.97$1,788
Sep 199825012.592.08$315
Aug 1998128011.301.91$1,446
Jul 1998129011.742.24$1,514
Jun 1998101011.242.24$1,135
May 1998135012.622.21$1,704
Apr 1998124013.042.51$1,617
Mar 1998144012.802.31$1,843
Feb 1998144013.952.30$2,009
Jan 1998157014.702.15$2,308
Dec 1997130016.322.41$2,122
Nov 1997145018.193.09$2,638
Oct 1997145019.253.15$2,791
Sep 1997144017.742.95$2,555
Aug 1997124017.862.55$2,215
Jul 1997152017.582.25$2,672
Jun 1997127017.242.26$2,189
May 1997167018.972.31$3,168
Apr 199798017.882.08$1,752
Mar 1997143018.951.94$2,710
Feb 1997129020.492.21$2,643
Jan 1997124023.483.54$2,912
Dec 1996139023.32$3,241
Nov 1996153021.97$3,361
Oct 1996136023.31$3,170
Sep 1996170022.22$3,777
Aug 1996146020.26$2,958
Jul 1996156019.55$3,050
Jun 1996162018.73$3,034
May 1996176019.43$3,420
Apr 1996144021.51$3,097
Mar 1996160019.38$3,101
Feb 19960016.98$0
Jan 1996180017.07$3,073
Dec 1995177017.19$3,043
Nov 1995178016.00$2,848
Oct 1995202015.43$3,117
Sep 19950016.18$0
Aug 1995118015.92$1,879
Jul 1995176015.24$2,682
Jun 1995172016.41$2,823
May 1995160017.56$2,810
Apr 1995189017.73$3,351
Mar 1995189016.44$3,107
Feb 19950016.58$0
Jan 19950015.92$0
Dec 1994156015.03$2,345
Nov 1994236015.90$3,752
Oct 199445015.58$701
Sep 1994160115.29$2,446
Aug 1994172116.13$2,774
Jul 1994137117.56$2,406
Jun 199493117.09$1,589
May 199469115.88$1,096
Apr 1994139114.14$1,965
Mar 1994123112.46$1,533
Feb 1994141112.50$1,763
Jan 1994133112.66$1,684
Dec 199390112.33$1,110
Nov 1993124114.49$1,797
Oct 1993254115.85$4,026
Sep 1993211115.03$3,171
Aug 19930115.66$0
Jul 1993161115.46$2,489
Jun 199347116.79$789
May 1993161117.68$2,846
Apr 1993219118.05$3,953
Mar 1993277118.14$5,025
Feb 19930117.90$0
Jan 19930116.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Oil                  170 bbl  × $ 98.93 =    $16,818
Casinghead gas         0 Mcf  × $  2.87 =         $0

────────────────────────────────────────────────────
Month total                                  $16,818

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/O/8555 is the state's own key, not one this site invented.