C. C. CATTLE COMPANY

Operated by STRAT LAND EXPLORATION COMPANY (P-5 825420) in the SHAPLEY (MORROW) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 132153District 10Field 82677333Hydrogen sulphide fieldNGPA filingCondensateGasSaveExport
Value, all time
$1.0 M
Jan 1993 – Jan 2014
Value, last 12 filed months
$0
at the published price for each month
Months reported
253
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 75 leases and 82 wells, and the rule below applies to all of them.

Discovered
1958-11-18
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 160 acres. The field rule took effect on 1962-07-11.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: MULTI 49B WITH 160 AC BASE UNIT UP TO 640 AC PLUS 10% TOL

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition284 bbl$10,605
GasProduction445,481 Mcf$991,884
Total$1,002,489

243,389 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.4048, -101.5093. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.40481, -101.50930 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,756 ft
1 wells filed one
Completion to plug
20 months
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,756 ft.

Completions filed
May 2012
1 of 1 wells
Plug dates filed
Jan 2014
1 of 1 wells

Last completion to plug: a median of 20 months across the 1 well that filed both dates, with the middle half between 20 months and 20 months. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1950019416,756 ftMay 2012Jan 2014Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (253)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

253 months

Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 201203485.133.02$103
Jun 201203279.822.52$81
May 2012019591.612.49$485
Apr 20120373101.652.00$745
Mar 20120531105.052.22$1,180
Feb 20120594101.102.57$1,527
Jan 2012058298.092.73$1,591
Dec 2011032496.873.24$1,050
Nov 201103995.723.31$129
Oct 201105484.983.65$197
Sep 2011043483.623.99$1,730
Aug 2011056983.404.15$2,361
Jul 2011074494.144.52$3,361
Jun 201101,28792.904.64$5,972
May 2011078398.134.40$3,449
Apr 2011099105.964.33$429
Mar 201103496.364.06$138
Feb 2011016485.644.18$686
Jan 2011053286.504.59$2,441
Dec 2010087385.734.35$3,796
Nov 201001,08980.843.80$4,133
Oct 2010094878.103.51$3,326
Sep 2010097772.633.98$3,888
Aug 201001,07473.684.42$4,746
Jul 2010092272.554.74$4,367
Jun 201001,03070.364.91$5,058
May 201001,05071.124.24$4,447
Apr 201001,11581.694.12$4,597
Mar 2010084978.394.39$3,726
Feb 2010092173.585.44$5,012
Jan 201001,01274.365.96$6,036
Dec 200901,05871.445.48$5,802
Nov 200901,07374.593.75$4,025
Oct 200901,19472.544.11$4,908
Sep 200901,14765.543.06$3,515
Aug 2009069467.423.22$2,234
Jul 2009094161.133.46$3,260
Jun 2009082166.163.90$3,198
May 200916081254.743.93$11,946
Apr 200901,00446.773.59$3,602
Mar 2009091742.144.06$3,722
Feb 2009095132.814.63$4,406
Jan 200901,05435.865.37$5,661
Dec 2008099737.105.98$5,959
Nov 200801,06055.496.86$7,272
Oct 2008064675.246.92$4,472
Sep 20080357101.767.88$2,812
Aug 20080977114.228.48$8,288
Jul 200801,134131.0811.39$12,916
Jun 200801,016131.3313.03$13,241
May 200801,256123.1711.57$14,537
Apr 200801,380110.3110.45$14,428
Mar 200801,024101.909.66$9,896
Feb 200801,10992.538.77$9,727
Jan 2008091590.388.21$7,508
Dec 200701,24688.337.30$9,098
Nov 200701,27191.677.29$9,268
Oct 200701,38182.856.92$9,559
Sep 200701,21475.846.24$7,580
Aug 200701,41069.066.39$9,007
Jul 200701,41970.906.39$9,064
Jun 200701,35862.007.55$10,251
May 200701,36358.747.85$10,694
Apr 200701,37859.617.81$10,756
Mar 200701,23256.927.30$8,996
Feb 200701,30055.108.22$10,681
Jan 200701,16250.306.73$7,817
Dec 2006098256.656.92$6,794
Nov 200601,42354.207.62$10,840
Oct 200601,24654.906.01$7,493
Sep 200601,27460.085.04$6,417
Aug 200601,24368.717.34$9,124
Jul 200601,29869.376.34$8,233
Jun 200601,33966.286.38$8,548
May 200601,08466.016.42$6,965
Apr 200601,20964.397.36$8,899
Mar 200601,27656.707.08$9,038
Feb 200601,15157.597.75$8,922
Jan 200601,30060.598.93$11,613
Dec 200501,34854.9413.42$18,084
Nov 200501,30154.6910.59$13,776
Oct 200501,36558.3413.80$18,831
Sep 200501,28061.4512.08$15,461
Aug 200501,31961.519.80$12,922
Jul 200501,25755.697.84$9,859
Jun 200501,10752.337.38$8,171
May 200501,45745.226.65$9,691
Apr 2005046549.207.36$3,423
Mar 200505550.377.15$394
Feb 200503945.226.31$246
Jan 200508843.166.32$556
Dec 200409839.866.75$662
Nov 200407745.286.33$487
Oct 2004019849.706.52$1,290
Sep 2004060943.245.28$3,218
Aug 200401,61142.375.55$8,942
Jul 200401,85438.286.08$11,280
Jun 200401,36036.106.43$8,749
May 200401,40537.486.49$9,125
Apr 200401,40734.475.86$8,243
Mar 200401,27134.365.53$7,029
Feb 200401,37632.455.51$7,581
Jan 200401,70232.036.30$10,722
Dec 200301,79230.266.30$11,293
Nov 200301,58528.804.60$7,283
Oct 200301,76828.174.76$8,415
Sep 200301,85326.314.75$8,801
Aug 200301,79129.765.13$9,187
Jul 200301,90629.415.17$9,856
Jun 2003075128.565.98$4,493
May 2003089326.595.97$5,334
Apr 200301,41826.675.41$7,668
Mar 200302,03431.146.10$12,399
Feb 200301,90833.487.93$15,123
Jan 200303530.315.58$195
Dec 2002061926.914.85$3,004
Nov 2002067424.664.14$2,788
Oct 2002020726.464.23$875
Sep 2002069227.443.64$2,516
Aug 2002014525.963.16$459
Jul 2002019524.583.06$597
Jun 2002055423.733.34$1,849
May 2002070724.663.58$2,534
Apr 2002021323.653.51$748
Mar 2002020822.003.10$645
Feb 2002058518.222.38$1,390
Jan 2002014517.172.38$344
Dec 200101,22016.932.36$2,885
Nov 2001034118.072.41$820
Oct 2001019219.782.53$486
Sep 2001081424.262.25$1,833
Aug 200101,08224.873.05$3,304
Jul 200102,10123.933.20$6,717
Jun 200101,21524.563.82$4,646
May 200101,26825.524.31$5,462
Apr 2001038024.685.34$2,027
Mar 2001053324.545.38$2,866
Feb 200101,30427.755.77$7,520
Jan 2001096527.478.40$8,105
Dec 2000062826.889.12$5,729
Nov 2000026632.215.66$1,505
Oct 2000045231.235.15$2,326
Sep 2000046331.875.19$2,401
Aug 2000059529.644.54$2,702
Jul 2000060028.534.09$2,454
Jun 200001,41829.304.40$6,235
May 200001,72927.263.68$6,362
Apr 200001,35024.513.12$4,207
Mar 200002,03228.422.86$5,811
Feb 2000083727.622.73$2,282
Jan 2000068925.272.48$1,709
Dec 199901,36624.282.42$3,311
Nov 199901,84623.192.43$4,493
Oct 199901,32320.982.80$3,709
Sep 1999077421.752.62$2,027
Aug 1999082319.262.88$2,367
Jul 199901,14417.892.37$2,714
Jun 199901,56715.942.36$3,701
May 199901,43015.792.32$3,319
Apr 199901,53615.102.21$3,392
Mar 1999086112.471.84$1,583
Feb 199901,4259.981.82$2,590
Jan 199902,51210.381.90$4,773
Dec 199808859.201.77$1,569
Nov 1998092910.892.19$2,031
Oct 199801,53512.421.97$3,023
Sep 199801,45112.592.08$3,022
Aug 199801,58911.301.91$3,031
Jul 199801,48911.742.24$3,331
Jun 199801,86111.242.24$4,164
May 199801,81812.622.21$4,011
Apr 199801,61113.042.51$4,036
Mar 199802,44712.802.31$5,651
Feb 199802,42513.952.30$5,575
Jan 199801,77714.702.15$3,829
Dec 199701,64716.322.41$3,971
Nov 199701,53818.193.09$4,750
Oct 199702,07819.253.15$6,545
Sep 199701,74217.742.95$5,147
Aug 199701,85117.862.55$4,729
Jul 199701,89017.582.25$4,247
Jun 199701,83717.242.26$4,146
May 199701,77818.972.31$4,105
Apr 199701,93017.882.08$4,020
Mar 199702,18118.951.94$4,229
Feb 199702,70720.492.21$5,971
Jan 199701,92823.483.54$6,825
Dec 199602,07323.32$0
Nov 199601,92921.97$0
Oct 199602,80423.31$0
Sep 199602,68622.22$0
Aug 199602,04520.26$0
Jul 199602,58319.55$0
Jun 199602,67018.73$0
May 199602,96819.43$0
Apr 199603,24721.51$0
Mar 199603,18619.38$0
Feb 199603,35016.98$0
Jan 199603,39017.07$0
Dec 199502,91617.19$0
Nov 199503,14616.00$0
Oct 199503,77415.43$0
Sep 199503,47816.18$0
Aug 199513,54915.92$16
Jul 199504,30315.24$0
Jun 199503,19816.41$0
May 199504,39917.56$0
Apr 199504,38017.73$0
Mar 199504,13116.44$0
Feb 199503,95316.58$0
Jan 199504,56715.92$0
Dec 1994125,06615.03$180
Nov 199414,60315.90$16
Oct 199445,27615.58$62
Sep 199404,24615.29$0
Aug 199405,27616.13$0
Jul 199406,07117.56$0
Jun 199404,89517.09$0
May 199405,41415.88$0
Apr 199405,94914.14$0
Mar 199406,21112.46$0
Feb 199405,47212.50$0
Jan 199496,06212.66$114
Dec 199306,20112.33$0
Nov 199306,36314.49$0
Oct 199307,76315.85$0
Sep 1993978,09815.03$1,458
Aug 199308,93015.66$0
Jul 199309,75715.46$0
Jun 199308,96716.79$0
May 199309,74617.68$0
Apr 1993010,68318.05$0
Mar 199305,39718.14$0
Feb 199307,50117.90$0
Jan 1993010,71716.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2012 — as filed, then multipliedworked
Condensate             0 bbl  × $ 85.13 =         $0
Gas                   34 Mcf  × $  3.02 =       $103

────────────────────────────────────────────────────
Month total                                     $103

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/132153 is the state's own key, not one this site invented.