LOCKHART -19-

Operated by CHESAPEAKE OPERATING, INC. (P-5 147715) in the HUMPHREYS (MORROW, UPPER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 150090District 10Field 43586600CondensateGasSaveExport
Value, all time
$673 k
May 1994 – Sep 2011
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
209
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 3 leases and 3 wells, and the rule below applies to all of them.

Discovered
1986-02-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition4,002 bbl$93,332
GasProduction343,810 Mcf$580,045
Total$673,377

203,881 Mcf of this lease's gas, across 32 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.9915, -100.1652. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.99147, -100.16518 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
11,500 ft
1 wells filed one
Completion to plug
24.6 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,500 ft.

Completions filed
Nov 1985
1 of 1 wells
Plug dates filed
Jun 2010
1 of 1 wells

Last completion to plug: a median of 24.6 years across the 1 well that filed both dates, with the middle half between 24.6 years and 24.6 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2113178519 A11,500 ftNov 1985Jun 2010Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (209)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

209 months

Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 201128094.144.52$2,636
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 201034081.694.12$2,777
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 2009022632.814.63$1,047
Jan 2009010135.865.37$542
Dec 2008016137.105.98$962
Nov 200817727255.496.86$11,688
Oct 2008029975.246.92$2,070
Sep 20080417101.767.88$3,285
Aug 20080224114.228.48$1,900
Jul 20080841131.0811.39$9,579
Jun 200801,018131.3313.03$13,267
May 20080826123.1711.57$9,560
Apr 20080648110.3110.45$6,775
Mar 20080532101.909.66$5,141
Feb 2008039592.538.77$3,464
Jan 2008061090.388.21$5,006
Dec 200701,25788.337.30$9,179
Nov 2007089391.677.29$6,511
Oct 2007083282.856.92$5,759
Sep 200701,12075.846.24$6,993
Aug 200701,29669.066.39$8,279
Jul 200701,26070.906.39$8,049
Jun 200701,15162.007.55$8,688
May 200701,00458.747.85$7,878
Apr 20071641,20059.617.81$19,142
Mar 200701,18356.927.30$8,638
Feb 2007083355.108.22$6,844
Jan 200701,17750.306.73$7,918
Dec 2006029656.656.92$2,048
Nov 2006013354.207.62$1,013
Oct 2006029854.906.01$1,792
Sep 200601,07960.085.04$5,435
Aug 200601,21068.717.34$8,881
Jul 2006049369.376.34$3,127
Jun 2006024866.286.38$1,583
May 2006048366.016.42$3,103
Apr 2006053964.397.36$3,967
Mar 2006061556.707.08$4,356
Feb 2006068157.597.75$5,279
Jan 2006091660.598.93$8,183
Dec 2005067854.9413.42$9,096
Nov 2005054154.6910.59$5,728
Oct 2005046558.3413.80$6,415
Sep 2005097661.4512.08$11,789
Aug 200501,31861.519.80$12,912
Jul 2005019455.697.84$1,522
Jun 200503052.337.38$221
May 2005024945.226.65$1,656
Apr 2005052949.207.36$3,894
Mar 200507350.377.15$522
Feb 2005012845.226.31$808
Jan 2005015343.166.32$967
Dec 2004019739.866.75$1,330
Nov 2004017645.286.33$1,114
Oct 2004017349.706.52$1,127
Sep 2004017643.245.28$930
Aug 2004021542.375.55$1,193
Jul 2004022338.286.08$1,357
Jun 200401536.106.43$97
May 2004014137.486.49$916
Apr 2004074434.475.86$4,359
Mar 200419384834.365.53$11,321
Feb 2004077132.455.51$4,248
Jan 200401,12332.036.30$7,075
Dec 2003089130.266.30$5,615
Nov 2003056628.804.60$2,601
Oct 2003060028.174.76$2,856
Sep 2003079926.314.75$3,795
Aug 2003058929.765.13$3,021
Jul 2003057129.415.17$2,953
Jun 2003068328.565.98$4,086
May 2003085426.595.97$5,101
Apr 2003068526.675.41$3,704
Mar 2003048031.146.10$2,926
Feb 2003039333.487.93$3,115
Jan 20030030.315.58$0
Dec 20020126.914.85$5
Nov 2002060524.664.14$2,503
Oct 2002095326.464.23$4,030
Sep 200201,47827.443.64$5,373
Aug 200201,14625.963.16$3,626
Jul 2002051324.583.06$1,571
Jun 200201,58623.733.34$5,294
May 200202,08124.663.58$7,458
Apr 200205023.653.51$176
Mar 2002012922.003.10$400
Feb 200205518.222.38$131
Jan 200206517.172.38$154
Dec 20010516.932.36$12
Nov 2001017018.072.41$409
Oct 200103319.782.53$83
Sep 200101524.262.25$34
Aug 200106624.873.05$202
Jul 200106923.933.20$221
Jun 2001014024.563.82$535
May 200108825.524.31$379
Apr 200109224.685.34$491
Mar 2001014424.545.38$774
Feb 2001024227.755.77$1,396
Jan 2001023027.478.40$1,932
Dec 2000024926.889.12$2,272
Nov 2000028632.215.66$1,618
Oct 2000035231.235.15$1,811
Sep 2000034531.875.19$1,789
Aug 2000033529.644.54$1,521
Jul 200021335628.534.09$7,533
Jun 2000039329.304.40$1,728
May 2000031427.263.68$1,155
Apr 2000027524.513.12$857
Mar 2000023828.422.86$681
Feb 2000021727.622.73$592
Jan 2000028925.272.48$717
Dec 1999059624.282.42$1,445
Nov 1999042023.192.43$1,022
Oct 1999040720.982.80$1,141
Sep 1999045821.752.62$1,199
Aug 1999040219.262.88$1,156
Jul 1999076917.892.37$1,824
Jun 1999066615.942.36$1,573
May 1999089415.792.32$2,075
Apr 1999072815.102.21$1,607
Mar 1999089412.471.84$1,643
Feb 199909099.981.82$1,652
Jan 1999066510.381.90$1,263
Dec 199801,2329.201.77$2,185
Nov 199801,92610.892.19$4,210
Oct 199802,36412.421.97$4,655
Sep 199802,29612.592.08$4,782
Aug 199802,65611.301.91$5,066
Jul 199802,79711.742.24$6,258
Jun 199802,73411.242.24$6,117
May 199802,54112.622.21$5,606
Apr 19982002,78913.042.51$9,595
Mar 199801,46812.802.31$3,390
Feb 199801,63813.952.30$3,766
Jan 199803,22814.702.15$6,956
Dec 199702,36816.322.41$5,709
Nov 199702,57218.193.09$7,943
Oct 19971833,33219.253.15$14,018
Sep 199703,48417.742.95$10,295
Aug 199703,88417.862.55$9,923
Jul 199704,27717.582.25$9,610
Jun 19971884,27117.242.26$12,882
May 199705,15718.972.31$11,905
Apr 19972004,52917.882.08$13,009
Mar 199704,05918.951.94$7,871
Feb 199704,73820.492.21$10,452
Jan 199704,16223.483.54$14,732
Dec 19961994,20423.32$4,641
Nov 199604,51821.97$0
Oct 199604,11623.31$0
Sep 19961894,91122.22$4,200
Aug 199605,95420.26$0
Jul 199606,38419.55$0
Jun 199605,46318.73$0
May 19961976,94319.43$3,828
Apr 199606,87021.51$0
Mar 199605,39319.38$0
Feb 199603,85016.98$0
Jan 19963934,05317.07$6,709
Dec 199506,00717.19$0
Nov 199501,52616.00$0
Oct 199502,56215.43$0
Sep 199504,26416.18$0
Aug 199503,05815.92$0
Jul 19951899,56515.24$2,880
Jun 199505,69516.41$0
May 199505,87317.56$0
Apr 19951966,39217.73$3,475
Mar 199507,33816.44$0
Feb 19951917,76316.58$3,167
Jan 199518811,14815.92$2,993
Dec 199419312,32315.03$2,901
Nov 199406,18615.90$0
Oct 19941844,11815.58$2,867
Sep 199405,32115.29$0
Aug 19941809,48316.13$2,903
Jul 199409,59717.56$0
Jun 199412311,08617.09$2,102
May 1994011,91715.88$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2011 — as filed, then multipliedworked
Condensate            28 bbl  × $ 94.14 =     $2,636
Gas                    0 Mcf  × $  4.52 =         $0

────────────────────────────────────────────────────
Month total                                   $2,636

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/150090 is the state's own key, not one this site invented.