BURCHFIEL

Operated by MEWBOURNE OIL COMPANY (P-5 562560) in the LIPSCOMB (CLEVELAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 153449District 10Field 538692702 tax incentive programmesCondensateGasSaveExport
Value, all time
$757 k
Jan 1995 – May 2026
Value, last 12 filed months
$1 k
at the published price for each month
Months reported
377
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,389 leases and 1,486 wells, and the rule below applies to all of them.

Discovered
1958-05-24
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2013-08-06.

The Commission's schedule remark for this field reads: FIELD

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111995-05-31132100
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,460 bbl$32,224
GasProduction212,818 Mcf$724,856
Total$757,080

56,963 Mcf of this lease's gas, across 24 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.3402, -100.0548. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.34020, -100.05482 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,700 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,700 ft.

Completions filed
Jan 1995
1 of 1 wells

1 well

42-2953220537,700 ftJan 1995

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (377)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

377 months

May 2026032106.413.05$97
Apr 202603198.932.87$89
Mar 202603289.753.15$101
Feb 202602963.503.75$109
Jan 202603259.138.00$256
Dec 202503256.664.41$141
Nov 202503158.593.93$122
Oct 202503359.383.30$109
Sep 202503162.743.08$95
Aug 202503463.933.01$103
Jul 202503266.743.32$106
Jun 202503166.483.13$97
May 202503260.553.23$103
Apr 202503162.363.54$110
Mar 202503267.704.27$137
Feb 202503070.884.34$130
Jan 202503274.324.28$137
Dec 202404968.993.12$153
Nov 202403469.052.20$75
Oct 202403471.372.28$78
Sep 202403169.612.36$73
Aug 202403275.632.06$66
Jul 202403979.932.15$84
Jun 202403078.082.63$79
May 202403478.812.20$75
Apr 202403284.451.66$53
Mar 202403380.301.55$51
Feb 202403976.091.78$70
Jan 202403373.023.30$109
Dec 202303971.262.61$102
Nov 202303177.892.81$87
Oct 202303285.443.09$99
Sep 202303289.042.74$88
Aug 202303480.522.67$91
Jul 202308374.852.64$219
Jun 202305068.962.26$113
May 202306370.622.23$140
Apr 202305978.122.24$132
Mar 202306372.852.39$151
Feb 202309575.112.47$234
Jan 202306376.533.39$213
Dec 202205376.415.73$304
Nov 202206185.005.65$344
Oct 202207087.185.86$410
Sep 202206684.888.16$539
Aug 202206994.529.13$630
Jul 2022072101.587.54$543
Jun 2022063115.097.98$503
May 2022062109.378.43$523
Apr 2022054104.226.84$369
Mar 2022054108.885.08$274
Feb 202205591.054.86$267
Jan 202208681.844.54$390
Dec 202108571.323.90$331
Nov 202108877.435.24$461
Oct 202107779.795.71$440
Sep 202108569.865.35$455
Aug 202106866.024.22$287
Jul 202108070.783.98$319
Jun 202108169.493.38$274
May 202107863.483.02$235
Apr 202105860.362.76$160
Mar 202107961.302.72$215
Feb 202105857.805.55$322
Jan 202107650.412.81$214
Dec 202008044.642.68$214
Nov 202004938.772.71$133
Oct 202004736.972.48$116
Sep 202004837.091.99$96
Aug 202006539.982.39$155
Jul 202006038.371.83$110
Jun 202005934.901.69$100
May 202005416.921.81$98
Apr 202005414.751.80$97
Mar 202005830.341.86$108
Feb 202005149.881.98$101
Jan 202006557.252.09$136
Dec 201906759.012.30$154
Nov 201906355.302.75$173
Oct 201907853.472.42$189
Sep 201906955.052.66$183
Aug 201906753.112.30$154
Jul 201906756.272.46$165
Jun 201906952.782.49$172
May 201906958.482.74$189
Apr 201906462.632.75$176
Mar 201905456.803.06$165
Feb 201905350.852.79$148
Jan 201905346.033.23$171
Dec 201805646.594.19$234
Nov 201805752.934.24$242
Oct 201805561.443.40$187
Sep 201805959.543.11$183
Aug 201806759.403.07$205
Jul 201807665.142.93$223
Jun 201807860.183.08$240
May 201807865.382.90$226
Apr 201807763.842.90$223
Mar 201807761.222.79$215
Feb 201805761.782.77$158
Jan 201806462.874.01$257
Dec 2017010757.272.92$313
Nov 2017013755.423.12$427
Oct 2017013749.292.98$409
Sep 2017010047.523.09$309
Aug 2017010745.373.00$321
Jul 2017013443.873.09$414
Jun 2017012142.493.09$374
May 2017010945.373.26$356
Apr 2017010547.933.21$337
Mar 2017010746.772.98$319
Feb 201709650.452.95$283
Jan 2017011349.413.42$386
Dec 2016010448.763.72$387
Nov 201608742.492.64$230
Oct 201608546.193.09$263
Sep 201606341.553.10$195
Aug 201607841.442.92$228
Jul 201608541.622.92$249
Jun 201606845.352.69$183
May 201608142.521.99$161
Apr 201607036.561.99$139
Mar 201606833.011.79$122
Feb 201606526.472.06$134
Jan 201606927.352.36$163
Dec 201505632.362.00$112
Nov 201502738.792.17$59
Oct 201505743.552.43$138
Sep 201505242.992.76$143
Aug 201505940.162.87$169
Jul 201506448.152.95$188
Jun 201505956.152.88$170
May 201506555.212.96$192
Apr 201505649.822.71$152
Mar 201505142.892.93$150
Feb 201504244.662.98$125
Jan 201506443.433.10$198
Dec 201404454.693.59$158
Nov 201404370.464.25$183
Oct 201404578.303.90$176
Sep 201404686.164.05$186
Aug 201408089.394.04$323
Jul 201404696.564.18$192
Jun 201404298.164.74$199
May 201404494.734.73$208
Apr 201404395.944.81$207
Mar 201404595.895.06$228
Feb 201404297.406.19$260
Jan 201406890.404.86$331
Dec 201309991.824.35$431
Nov 2013012788.853.74$475
Oct 2013023997.423.78$903
Sep 20130266104.113.72$989
Aug 20130287104.253.52$1,011
Jul 20130236102.523.72$877
Jun 2013022994.403.93$901
May 2013022994.834.15$950
Apr 2013018593.964.28$792
Mar 2013017093.623.91$665
Feb 2013012191.233.42$414
Jan 2013028891.603.42$985
Dec 2012020686.773.42$705
Nov 2012022986.953.62$830
Oct 2012018489.383.40$626
Sep 2012017294.672.92$502
Aug 2012014892.662.91$430
Jul 2012010785.133.02$323
Jun 201208079.822.52$202
May 2012010991.612.49$271
Apr 20120110101.652.00$220
Mar 20120194105.052.22$431
Feb 2012077101.102.57$198
Jan 201207898.092.73$213
Dec 201109196.873.24$295
Nov 2011017895.723.31$589
Oct 201109084.983.65$328
Sep 2011026883.623.99$1,068
Aug 201108483.404.15$349
Jul 201106194.144.52$276
Jun 201107592.904.64$348
May 2011045998.134.40$2,022
Apr 20110253105.964.33$1,096
Mar 2011027796.364.06$1,124
Feb 2011026185.644.18$1,091
Jan 2011025986.504.59$1,188
Dec 2010020485.734.35$887
Nov 2010029080.843.80$1,101
Oct 2010018378.103.51$642
Sep 2010024772.633.98$983
Aug 201006673.684.42$292
Jul 20100072.554.74$0
Jun 201001670.364.91$79
May 2010045371.124.24$1,919
Apr 2010054581.694.12$2,247
Mar 2010043978.394.39$1,927
Feb 2010051373.585.44$2,792
Jan 2010053374.365.96$3,179
Dec 2009053671.445.48$2,939
Nov 2009056174.593.75$2,105
Oct 2009060172.544.11$2,470
Sep 2009053165.543.06$1,627
Aug 2009058867.423.22$1,892
Jul 2009059061.133.46$2,044
Jun 2009059166.163.90$2,302
May 2009057054.743.93$2,238
Apr 2009062046.773.59$2,224
Mar 2009058242.144.06$2,362
Feb 200919354632.814.63$8,862
Jan 2009063935.865.37$3,432
Dec 2008066137.105.98$3,951
Nov 2008068755.496.86$4,713
Oct 2008066375.246.92$4,589
Sep 20080665101.767.88$5,238
Aug 20080636114.228.48$5,395
Jul 20080660131.0811.39$7,517
Jun 20080669131.3313.03$8,719
May 20080746123.1711.57$8,634
Apr 20080712110.3110.45$7,444
Mar 20080793101.909.66$7,664
Feb 2008054592.538.77$4,780
Jan 2008075090.388.21$6,154
Dec 2007064888.337.30$4,732
Nov 2007066791.677.29$4,864
Oct 2007072882.856.92$5,039
Sep 2007071375.846.24$4,452
Aug 2007065269.066.39$4,165
Jul 2007068570.906.39$4,376
Jun 2007068562.007.55$5,171
May 2007072058.747.85$5,649
Apr 2007068159.617.81$5,315
Mar 2007071256.927.30$5,199
Feb 2007059155.108.22$4,856
Jan 2007071750.306.73$4,823
Dec 2006082756.656.92$5,722
Nov 2006065754.207.62$5,005
Oct 2006067454.906.01$4,053
Sep 2006074660.085.04$3,758
Aug 2006070068.717.34$5,138
Jul 2006071469.376.34$4,529
Jun 2006068366.286.38$4,360
May 2006064466.016.42$4,138
Apr 2006077264.397.36$5,682
Mar 2006084056.707.08$5,950
Feb 2006072457.597.75$5,612
Jan 2006087060.598.93$7,772
Dec 2005077954.9413.42$10,451
Nov 2005078554.6910.59$8,312
Oct 2005077758.3413.80$10,719
Sep 2005086061.4512.08$10,388
Aug 2005094261.519.80$9,229
Jul 2005082155.697.84$6,440
Jun 2005079852.337.38$5,890
May 2005069445.226.65$4,616
Apr 2005078949.207.36$5,807
Mar 2005076750.377.15$5,488
Feb 2005063645.226.31$4,014
Jan 2005070843.166.32$4,476
Dec 2004082339.866.75$5,556
Nov 2004069145.286.33$4,374
Oct 2004070549.706.52$4,593
Sep 200414767443.245.28$9,918
Aug 2004049742.375.55$2,759
Jul 2004064338.286.08$3,912
Jun 2004064936.106.43$4,175
May 2004063737.486.49$4,137
Apr 2004067434.475.86$3,949
Mar 2004077634.365.53$4,291
Feb 2004064932.455.51$3,576
Jan 2004064932.036.30$4,088
Dec 2003054230.266.30$3,415
Nov 2003048628.804.60$2,233
Oct 2003054928.174.76$2,613
Sep 2003055626.314.75$2,641
Aug 2003070229.765.13$3,601
Jul 2003092429.415.17$4,778
Jun 2003083128.565.98$4,972
May 2003085726.595.97$5,119
Apr 200301,05226.675.41$5,688
Mar 2003096631.146.10$5,889
Feb 2003083833.487.93$6,642
Jan 200301,01630.315.58$5,671
Dec 2002099926.914.85$4,849
Nov 2002097024.664.14$4,013
Oct 2002093326.464.23$3,946
Sep 2002094927.443.64$3,450
Aug 2002088325.963.16$2,794
Jul 2002088224.583.06$2,700
Jun 2002092623.733.34$3,091
May 2002089724.663.58$3,215
Apr 200201,03623.653.51$3,639
Mar 2002064122.003.10$1,989
Feb 200218743618.222.38$4,443
Jan 2002097417.172.38$2,314
Dec 2001096016.932.36$2,270
Nov 2001096718.072.41$2,326
Oct 2001081219.782.53$2,053
Sep 2001094024.262.25$2,116
Aug 200151,02424.873.05$3,251
Jul 2001084523.933.20$2,702
Jun 2001094324.563.82$3,606
May 200101,05925.524.31$4,561
Apr 200101,06324.685.34$5,671
Mar 200101,06524.545.38$5,726
Feb 2001088027.755.77$5,075
Jan 200101,05527.478.40$8,861
Dec 2000093826.889.12$8,557
Nov 200001,14832.215.66$6,495
Oct 200001,15031.235.15$5,917
Sep 200001,00831.875.19$5,228
Aug 200001,02729.644.54$4,663
Jul 2000097928.534.09$4,004
Jun 200001,05429.304.40$4,635
May 200001,11627.263.68$4,107
Apr 200001,14124.513.12$3,555
Mar 200001,06728.422.86$3,051
Feb 200001,09627.622.73$2,988
Jan 200001,11725.272.48$2,771
Dec 199901,30424.282.42$3,161
Nov 199901,29923.192.43$3,162
Oct 199901,16420.982.80$3,264
Sep 199901,11221.752.62$2,912
Aug 199901,27619.262.88$3,669
Jul 199901,20917.892.37$2,868
Jun 19991821,18115.942.36$5,691
May 199901,25915.792.32$2,922
Apr 199901,21915.102.21$2,692
Mar 199901,11412.471.84$2,048
Feb 199909569.981.82$1,738
Jan 1999092510.381.90$1,757
Dec 199801,1389.201.77$2,018
Nov 199801,28610.892.19$2,811
Oct 199801,09412.421.97$2,154
Sep 199801,03512.592.08$2,156
Aug 1998099611.301.91$1,900
Jul 199801,06711.742.24$2,387
Jun 199801,13811.242.24$2,546
May 199801,23012.622.21$2,714
Apr 1998094213.042.51$2,360
Mar 1998093012.802.31$2,148
Feb 1998097913.952.30$2,251
Jan 199801,27414.702.15$2,745
Dec 199701,08516.322.41$2,616
Nov 199701,13218.193.09$3,496
Oct 19971851,29319.253.15$7,634
Sep 199701,27417.742.95$3,765
Aug 199701,16217.862.55$2,969
Jul 199701,21917.582.25$2,739
Jun 199701,21417.242.26$2,740
May 199701,48418.972.31$3,426
Apr 199701,37417.882.08$2,862
Mar 199701,47918.951.94$2,868
Feb 199701,41120.492.21$3,113
Jan 199701,59323.483.54$5,639
Dec 199601,61123.32$0
Nov 199601,56721.97$0
Oct 199601,59423.31$0
Sep 199601,87922.22$0
Aug 199601,72420.26$0
Jul 199601,70419.55$0
Jun 199601,60618.73$0
May 199601,74419.43$0
Apr 199601,82521.51$0
Mar 19961862,02319.38$3,605
Feb 199601,84216.98$0
Jan 199601,97317.07$0
Dec 199502,22117.19$0
Nov 199502,28716.00$0
Oct 199502,40515.43$0
Sep 199502,48616.18$0
Aug 199502,65515.92$0
Jul 19951902,92215.24$2,896
Jun 199502,89816.41$0
May 199503,77617.56$0
Apr 199503,78117.73$0
Mar 19951854,77516.44$3,041
Feb 199505,48816.58$0
Jan 1995017715.92$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   32 Mcf  × $  3.05 =        $97

────────────────────────────────────────────────────
Month total                                      $97

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/153449 is the state's own key, not one this site invented.