ELLIS, CARL "H"

Operated by AMOCO PRODUCTION COMPANY (P-5 20425) in the ELLIS RANCH (CLEVELAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 159504District 10Field 285061522 tax incentive programmesCondensateGasSaveExport
Value, all time
$46 k
Jun 1996 – May 2001
Value, last 12 filed months
$0
at the published price for each month
Months reported
60
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 140 leases and 149 wells, and the rule below applies to all of them.

Discovered
1958-04-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2005-07-01.

The Commission's schedule remark for this field reads: PETRO (CLEVELAND) FLD 68735120 EFC 5/1/11

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111996-09-13135432
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition285 bbl$3,281
GasProduction27,129 Mcf$43,116
Total$46,398

8,559 Mcf of this lease's gas, across 7 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.2718, -100.7015. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.27178, -100.70150 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
7,150 ft
1 wells filed one
Completion to plug
4.9 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,150 ft.

Completions filed
Jun 1996
1 of 1 wells
Plug dates filed
May 2001
1 of 1 wells

Last completion to plug: a median of 4.9 years across the 1 well that filed both dates, with the middle half between 4.9 years and 4.9 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3573213747,150 ftJun 1996May 2001Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (60)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

60 months

May 20010025.524.31$0
Apr 20010024.685.34$0
Mar 20010024.545.38$0
Feb 20010027.755.77$0
Jan 20010027.478.40$0
Dec 20000026.889.12$0
Nov 20000032.215.66$0
Oct 20000031.235.15$0
Sep 20000031.875.19$0
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 20000029.304.40$0
May 20000027.263.68$0
Apr 20000024.513.12$0
Mar 20000028.422.86$0
Feb 20000027.622.73$0
Jan 20000025.272.48$0
Dec 19990024.282.42$0
Nov 19990023.192.43$0
Oct 19990020.982.80$0
Sep 19990021.752.62$0
Aug 19990019.262.88$0
Jul 1999279117.892.37$699
Jun 199908015.942.36$189
May 1999055315.792.32$1,284
Apr 1999056415.102.21$1,245
Mar 1999060812.471.84$1,118
Feb 199905859.981.82$1,063
Jan 19992270710.381.90$1,572
Dec 199806299.201.77$1,115
Nov 199823668110.892.19$4,059
Oct 1998057012.421.97$1,122
Sep 1998036012.592.08$750
Aug 1998042611.301.91$813
Jul 1998063911.742.24$1,430
Jun 1998043811.242.24$980
May 1998063212.622.21$1,394
Apr 1998046313.042.51$1,160
Mar 1998075912.802.31$1,753
Feb 1998071813.952.30$1,651
Jan 199801,12214.702.15$2,418
Dec 1997047416.322.41$1,143
Nov 1997058418.193.09$1,804
Oct 1997060919.253.15$1,918
Sep 1997075117.742.95$2,219
Aug 1997063117.862.55$1,612
Jul 1997083717.582.25$1,881
Jun 1997072217.242.26$1,630
May 1997067218.972.31$1,551
Apr 1997058817.882.08$1,225
Mar 1997053518.951.94$1,037
Feb 1997067020.492.21$1,478
Jan 1997087223.483.54$3,087
Dec 1996075923.32$0
Nov 199601,05521.97$0
Oct 199601,14323.31$0
Sep 199601,20122.22$0
Aug 199601,73620.26$0
Jul 199601,66819.55$0
Jun 1996099718.73$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 1999 — as filed, then multipliedworked
Condensate            27 bbl  × $ 17.89 =       $483
Gas                   91 Mcf  × $  2.37 =       $216

────────────────────────────────────────────────────
Month total                                     $699

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/159504 is the state's own key, not one this site invented.