Operated by APACHE CORPORATION (P-5 27200) in the HAYWOOD (ATOKA) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 163156District 10Field 39899500CondensateGasSaveExport
Value, all time
$2.8 M
Feb 1997 – Aug 2013
Value, last 12 filed months
$5 k
at the published price for each month
Months reported
199
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 51 leases and 58 wells, and the rule below applies to all of them.

Discovered
1958-01-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2007-12-21.

The Commission's schedule remark for this field reads: ALLOCATION FORMULA EFFECTIVE 05/01/2009.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,304 bbl$57,609
GasProduction573,577 Mcf$2,729,252
Total$2,786,861

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.2192, -100.9981. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.21920, -100.99815 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
7,900 ft
1 wells filed one
Completion to plug
11.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,900 ft.

Completions filed
May 2002
1 of 1 wells
Plug dates filed
Aug 2013
1 of 1 wells

Last completion to plug: a median of 11.3 years across the 1 well that filed both dates, with the middle half between 11.3 years and 11.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3573215637,900 ftMay 2002Aug 2013Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (199)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

199 months

Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 201263086.773.42$5,467
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 20120579101.102.57$1,488
Jan 2012085998.092.73$2,349
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201103,188105.964.33$13,815
Mar 201103,08496.364.06$12,513
Feb 201102,11985.644.18$8,857
Jan 201102,84786.504.59$13,064
Dec 201002,58585.734.35$11,239
Nov 201002,52780.843.80$9,591
Oct 20101732,83978.103.51$23,473
Sep 201002,56272.633.98$10,195
Aug 201002,80273.684.42$12,383
Jul 201002,71072.554.74$12,836
Jun 201002,41170.364.91$11,839
May 201002,63071.124.24$11,139
Apr 201002,24981.694.12$9,272
Mar 201002,44778.394.39$10,739
Feb 201002,33673.585.44$12,713
Jan 201002,00774.365.96$11,970
Dec 200902,40471.445.48$13,183
Nov 200902,35374.593.75$8,827
Oct 200902,47172.544.11$10,156
Sep 200902,40965.543.06$7,383
Aug 200902,67967.423.22$8,622
Jul 200902,52461.133.46$8,744
Jun 200902,45066.163.90$9,543
May 200902,68754.743.93$10,548
Apr 200902,50346.773.59$8,980
Mar 200902,56842.144.06$10,424
Feb 200902,08732.814.63$9,669
Jan 200902,38735.865.37$12,821
Dec 200802,49837.105.98$14,931
Nov 200802,32155.496.86$15,923
Oct 200802,48475.246.92$17,194
Sep 200802,294101.767.88$18,070
Aug 200802,628114.228.48$22,293
Jul 200802,669131.0811.39$30,398
Jun 200802,657131.3313.03$34,628
May 200802,651123.1711.57$30,683
Apr 200802,549110.3110.45$26,649
Mar 200802,590101.909.66$25,030
Feb 200802,35392.538.77$20,637
Jan 200802,54990.388.21$20,916
Dec 20071592,48188.337.30$32,161
Nov 200702,57791.677.29$18,791
Oct 200702,69782.856.92$18,669
Sep 200702,60275.846.24$16,247
Aug 200702,77069.066.39$17,695
Jul 200702,29970.906.39$14,686
Jun 200702,47962.007.55$18,713
May 200702,61258.747.85$20,494
Apr 200702,34859.617.81$18,327
Mar 200702,57356.927.30$18,788
Feb 200702,28255.108.22$18,749
Jan 200702,45750.306.73$16,528
Dec 200602,43756.656.92$16,860
Nov 200602,60654.207.62$19,851
Oct 200602,67654.906.01$16,093
Sep 200602,76060.085.04$13,903
Aug 200602,58168.717.34$18,944
Jul 200603,04369.376.34$19,301
Jun 200602,95866.286.38$18,884
May 200602,68666.016.42$17,258
Apr 200602,60164.397.36$19,145
Mar 200602,75856.707.08$19,535
Feb 200602,42557.597.75$18,796
Jan 200602,72660.598.93$24,352
Dec 200502,54754.9413.42$34,169
Nov 200503,13054.6910.59$33,142
Oct 200503,14458.3413.80$43,374
Sep 200503,06361.4512.08$36,998
Aug 2005403,00661.519.80$31,910
Jul 200503,40955.697.84$26,739
Jun 200502,90852.337.38$21,464
May 200503,14445.226.65$20,911
Apr 200503,06449.207.36$22,553
Mar 200503,39250.377.15$24,269
Feb 200503,05545.226.31$19,283
Jan 200502,51943.166.32$15,926
Dec 200403,29039.866.75$22,211
Nov 200403,43745.286.33$21,758
Oct 200403,24549.706.52$21,142
Sep 20041443,21243.245.28$23,198
Aug 200403,49042.375.55$19,372
Jul 200403,59238.286.08$21,854
Jun 200403,33136.106.43$21,428
May 200403,61137.486.49$23,452
Apr 200403,41534.475.86$20,007
Mar 200403,61334.365.53$19,980
Feb 200403,34932.455.51$18,452
Jan 200403,64932.036.30$22,987
Dec 200303,78730.266.30$23,864
Nov 200303,82428.804.60$17,572
Oct 20031474,28428.174.76$24,531
Sep 200303,65526.314.75$17,359
Aug 200304,40529.765.13$22,596
Jul 200304,71129.415.17$24,360
Jun 200304,09928.565.98$24,524
May 200304,62126.595.97$27,600
Apr 200304,57926.675.41$24,760
Mar 200305,05531.146.10$30,815
Feb 200304,96433.487.93$39,344
Jan 200304,99530.315.58$27,882
Dec 200204,48326.914.85$21,759
Nov 20022004,58724.664.14$23,908
Oct 200205,10726.464.23$21,598
Sep 200205,32127.443.64$19,343
Aug 200205,98525.963.16$18,938
Jul 2002063324.583.06$1,938
Jun 200207,80523.733.34$26,055
May 20020024.663.58$0
Apr 20020023.653.51$0
Mar 20020022.003.10$0
Feb 20020018.222.38$0
Jan 200202,38017.172.38$5,654
Dec 200102,48616.932.36$5,878
Nov 200102,36918.072.41$5,699
Oct 200102,72919.782.53$6,901
Sep 200102,84324.262.25$6,401
Aug 200102,89224.873.05$8,830
Jul 200102,99723.933.20$9,582
Jun 200102,86124.563.82$10,941
May 200103,00725.524.31$12,952
Apr 2001942,93724.685.34$17,990
Mar 200103,03924.545.38$16,339
Feb 200102,95127.755.77$17,019
Jan 200103,19227.478.40$26,809
Dec 200002,92526.889.12$26,683
Nov 200003,08832.215.66$17,472
Oct 200001,01931.235.15$5,243
Sep 200003,49231.875.19$18,111
Aug 2000803,05529.644.54$16,243
Jul 200013,71328.534.09$15,214
Jun 200003,41329.304.40$15,008
May 200003,45527.263.68$12,714
Apr 200003,44824.513.12$10,744
Mar 200003,59528.422.86$10,281
Feb 200003,56127.622.73$9,709
Jan 200004,07025.272.48$10,096
Dec 199903,93424.282.42$9,535
Nov 199903,93223.192.43$9,570
Oct 199904,27120.982.80$11,975
Sep 199903,64621.752.62$9,548
Aug 199903,46519.262.88$9,964
Jul 199903,72417.892.37$8,835
Jun 199903,84715.942.36$9,087
May 199903,92815.792.32$9,117
Apr 199904,27115.102.21$9,431
Mar 199903,01612.471.84$5,544
Feb 199903,1239.981.82$5,677
Jan 19992033,40710.381.90$8,580
Dec 199803,1499.201.77$5,584
Nov 199803,39910.892.19$7,429
Oct 199803,88412.421.97$7,648
Sep 199803,55412.592.08$7,402
Aug 199803,96411.301.91$7,561
Jul 199805,34211.742.24$11,952
Jun 199806,28711.242.24$14,066
May 199805,05112.622.21$11,144
Apr 199806,14613.042.51$15,398
Mar 199803,27112.802.31$7,554
Feb 199804,24913.952.30$9,769
Jan 199803,72514.702.15$8,027
Dec 199706,86716.322.41$16,557
Nov 199704,05918.193.09$12,535
Oct 199703,75019.253.15$11,812
Sep 199703,66717.742.95$10,836
Aug 199703,10617.862.55$7,935
Jul 199706,58817.582.25$14,803
Jun 199706,71417.242.26$15,155
May 199708,12618.972.31$18,759
Apr 199707,81417.882.08$16,275
Mar 1997011,10518.951.94$21,534
Feb 1997010,18420.492.21$22,465

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2012 — as filed, then multipliedworked
Condensate            63 bbl  × $ 86.77 =     $5,467
Gas                    0 Mcf  × $  3.42 =         $0

────────────────────────────────────────────────────
Month total                                   $5,467

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/163156 is the state's own key, not one this site invented.