CROSS F

Operated by CONOCOPHILLIPS COMPANY (P-5 172232) in the BRADFORD (TONKAWA) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 170002District 10Field 11226800CondensateGasSaveExport
Value, all time
$263 k
Jun 1998 – Mar 2010
Value, last 12 filed months
$7 k
at the published price for each month
Months reported
142
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 91 leases and 219 wells, and the rule below applies to all of them.

Discovered
1958-11-19
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 640 acres. The field rule took effect on 1961-04-17.

The Commission's schedule remark for this field reads: MULTI 49B WITH 80 AC BASE UNIT UP TO 640 AC WITH 10% TOLERANCE.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition23 bbl$628
GasProduction63,077 Mcf$262,857
Total$263,484

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.3139, -100.4532. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.31386, -100.45319 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
9,100 ft
1 wells filed one
Completion to plug
11.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,100 ft.

Completions filed
Jun 1998
1 of 1 wells
Plug dates filed
Mar 2010
1 of 1 wells

Last completion to plug: a median of 11.8 years across the 1 well that filed both dates, with the middle half between 11.8 years and 11.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2953180929,100 ftJun 1998Mar 2010Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (142)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

142 months

Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 2010011474.365.96$680
Dec 2009014871.445.48$812
Nov 2009015774.593.75$589
Oct 2009017072.544.11$699
Sep 2009021065.543.06$644
Aug 2009024667.423.22$792
Jul 2009026161.133.46$904
Jun 2009023466.163.90$911
May 2009012854.743.93$503
Apr 200908946.773.59$319
Mar 2009012442.144.06$503
Feb 2009012532.814.63$579
Jan 2009010535.865.37$564
Dec 2008010337.105.98$616
Nov 2008013755.496.86$940
Oct 2008016075.246.92$1,108
Sep 20080137101.767.88$1,079
Aug 20080112114.228.48$950
Jul 20080121131.0811.39$1,378
Jun 20080146131.3313.03$1,903
May 20080118123.1711.57$1,366
Apr 20080178110.3110.45$1,861
Mar 20080194101.909.66$1,875
Feb 2008028992.538.77$2,535
Jan 2008032590.388.21$2,667
Dec 2007022088.337.30$1,606
Nov 2007023891.677.29$1,735
Oct 2007033982.856.92$2,347
Sep 2007033575.846.24$2,092
Aug 2007033569.066.39$2,140
Jul 2007077270.906.39$4,931
Jun 200709562.007.55$717
May 200705558.747.85$432
Apr 2007015059.617.81$1,171
Mar 200708456.927.30$613
Feb 2007011755.108.22$961
Jan 2007014750.306.73$989
Dec 2006015756.656.92$1,086
Nov 2006015654.207.62$1,188
Oct 2006016054.906.01$962
Sep 2006016760.085.04$841
Aug 2006017468.717.34$1,277
Jul 2006017969.376.34$1,135
Jun 2006018666.286.38$1,187
May 2006020966.016.42$1,343
Apr 2006020664.397.36$1,516
Mar 2006021456.707.08$1,516
Feb 2006019057.597.75$1,473
Jan 2006022060.598.93$1,965
Dec 2005021654.9413.42$2,898
Nov 2005021354.6910.59$2,255
Oct 2005022158.3413.80$3,049
Sep 2005021061.4512.08$2,537
Aug 2005021761.519.80$2,126
Jul 2005021855.697.84$1,710
Jun 2005020752.337.38$1,528
May 2005024445.226.65$1,623
Apr 2005027249.207.36$2,002
Mar 2005028050.377.15$2,003
Feb 2005023545.226.31$1,483
Jan 2005029143.166.32$1,840
Dec 2004029539.866.75$1,992
Nov 2004028645.286.33$1,811
Oct 2004030049.706.52$1,955
Sep 2004028143.245.28$1,485
Aug 2004030342.375.55$1,682
Jul 2004031238.286.08$1,898
Jun 2004027836.106.43$1,788
May 2004031237.486.49$2,026
Apr 2004032334.475.86$1,892
Mar 2004033334.365.53$1,842
Feb 2004031632.455.51$1,741
Jan 2004035332.036.30$2,224
Dec 2003035630.266.30$2,243
Nov 2003035128.804.60$1,613
Oct 2003035028.174.76$1,666
Sep 2003027326.314.75$1,297
Aug 2003022029.765.13$1,129
Jul 2003025129.415.17$1,298
Jun 2003022528.565.98$1,346
May 2003024026.595.97$1,433
Apr 2003027626.675.41$1,492
Mar 2003029631.146.10$1,804
Feb 2003027933.487.93$2,211
Jan 2003032830.315.58$1,831
Dec 2002032026.914.85$1,553
Nov 2002037524.664.14$1,551
Oct 2002042526.464.23$1,797
Sep 2002046727.443.64$1,698
Aug 20020025.963.16$0
Jul 2002055624.583.06$1,702
Jun 2002041523.733.34$1,385
May 2002047224.663.58$1,692
Apr 2002049523.653.51$1,739
Mar 2002053622.003.10$1,663
Feb 2002048418.222.38$1,150
Jan 2002052517.172.38$1,247
Dec 2001050416.932.36$1,192
Nov 2001053718.072.41$1,292
Oct 2001053019.782.53$1,340
Sep 20011054224.262.25$1,463
Aug 2001057824.873.05$1,765
Jul 2001056723.933.20$1,813
Jun 2001060924.563.82$2,329
May 2001052025.524.31$2,240
Apr 2001055524.685.34$2,961
Mar 2001060824.545.38$3,269
Feb 2001058227.755.77$3,356
Jan 2001066727.478.40$5,602
Dec 2000066726.889.12$6,085
Nov 2000066232.215.66$3,746
Oct 2000071231.235.15$3,664
Sep 2000066131.875.19$3,428
Aug 20001366429.644.54$3,400
Jul 2000068528.534.09$2,801
Jun 2000072029.304.40$3,166
May 2000076827.263.68$2,826
Apr 2000077024.513.12$2,399
Mar 2000083828.422.86$2,396
Feb 2000078627.622.73$2,143
Jan 2000088625.272.48$2,198
Dec 1999090824.282.42$2,201
Nov 1999089323.192.43$2,174
Oct 1999092420.982.80$2,591
Sep 1999086821.752.62$2,273
Aug 1999093319.262.88$2,683
Jul 1999098717.892.37$2,342
Jun 199901,02015.942.36$2,409
May 199901,08415.792.32$2,516
Apr 199901,09415.102.21$2,416
Mar 199901,20912.471.84$2,223
Feb 199901,0999.981.82$1,998
Jan 199901,27910.381.90$2,430
Dec 199801,2639.201.77$2,240
Nov 199801,36710.892.19$2,988
Oct 199801,52812.421.97$3,009
Sep 199801,64212.592.08$3,420
Aug 199801,89711.301.91$3,618
Jul 199803,19711.742.24$7,153
Jun 19980011.242.24$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2010 — as filed, then multipliedworked
Condensate             0 bbl  × $ 74.36 =         $0
Gas                  114 Mcf  × $  5.96 =       $680

────────────────────────────────────────────────────
Month total                                     $680

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/170002 is the state's own key, not one this site invented.