ODC -B-

Operated by LATIGO PETROLEUM, LLC (P-5 488260) in the PAN PETRO (CLEVELAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 170089District 10Field 687351202 tax incentive programmesCondensateGasSaveExport
Value, all time
$892 k
May 1998 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
337
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 965 leases and 1,339 wells, and the rule below applies to all of them.

Discovered
1974-03-21
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2011-04-18.

The Commission's schedule remark for this field reads: PRORATION ACRES PLATS ARE REQUIRED.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111998-10-14139441
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition597 bbl$20,488
GasProduction199,647 Mcf$871,890
Total$892,378

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.2506, -100.6964. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.25058, -100.69640 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,220 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,220 ft.

Completions filed
May 1998
1 of 1 wells

1 well

42-3573223336559,220 ftMay 1998

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (337)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

337 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 201902855.052.66$74
Aug 201903053.112.30$69
Jul 201903156.272.46$76
Jun 201903252.782.49$80
May 201903258.482.74$88
Apr 201903262.632.75$88
Mar 201904356.803.06$132
Feb 201903850.852.79$106
Jan 201903946.033.23$126
Dec 201804246.594.19$176
Nov 201803352.934.24$140
Oct 201803861.443.40$129
Sep 201805759.543.11$177
Aug 201806559.403.07$199
Jul 2018025965.142.93$759
Jun 2018018160.183.08$557
May 2018025065.382.90$725
Apr 2018013263.842.90$383
Mar 2018015061.222.79$418
Feb 201808461.782.77$232
Jan 201808562.874.01$341
Dec 201709657.272.92$280
Nov 2017013855.423.12$430
Oct 2017037249.292.98$1,110
Sep 201704947.523.09$151
Aug 201707745.373.00$231
Jul 201707743.873.09$238
Jun 201707942.493.09$244
May 201709245.373.26$300
Apr 2017010147.933.21$324
Mar 2017010246.772.98$304
Feb 201709150.452.95$269
Jan 2017010049.413.42$342
Dec 2016010248.763.72$380
Nov 2016010742.492.64$283
Oct 2016213846.193.09$519
Sep 2016010941.553.10$338
Aug 2016011941.442.92$348
Jul 2016012441.622.92$363
Jun 201602545.352.69$67
May 2016015742.521.99$313
Apr 2016014436.561.99$287
Mar 2016017333.011.79$310
Feb 2016018226.472.06$376
Jan 2016014727.352.36$348
Dec 201505532.362.00$110
Nov 2015026238.792.17$568
Oct 2015024343.552.43$590
Sep 2015043942.992.76$1,211
Aug 2015042140.162.87$1,209
Jul 2015043748.152.95$1,287
Jun 2015039856.152.88$1,147
May 2015045355.212.96$1,339
Apr 2015043449.822.71$1,175
Mar 2015040042.892.93$1,174
Feb 2015038144.662.98$1,134
Jan 2015028843.433.10$893
Dec 2014043054.693.59$1,544
Nov 2014035070.464.25$1,488
Oct 2014049578.303.90$1,931
Sep 2014042986.164.05$1,735
Aug 2014053689.394.04$2,163
Jul 20141541596.564.18$3,183
Jun 2014028698.164.74$1,355
May 2014040694.734.73$1,919
Apr 2014034895.944.81$1,674
Mar 2014034595.895.06$1,745
Feb 2014037497.406.19$2,316
Jan 2014015490.404.86$749
Dec 2013019691.824.35$853
Nov 2013046588.853.74$1,738
Oct 2013049197.423.78$1,856
Sep 20130485104.113.72$1,803
Aug 20130485104.253.52$1,708
Jul 20130543102.523.72$2,019
Jun 2013052194.403.93$2,049
May 2013052694.834.15$2,182
Apr 2013052793.964.28$2,257
Mar 2013056393.623.91$2,203
Feb 2013053991.233.42$1,843
Jan 2013063491.603.42$2,168
Dec 2012069986.773.42$2,391
Nov 2012074386.953.62$2,693
Oct 20127165889.383.40$8,583
Sep 2012041994.672.92$1,223
Aug 2012043192.662.91$1,253
Jul 2012045185.133.02$1,362
Jun 2012043379.822.52$1,091
May 2012044591.612.49$1,107
Apr 20120452101.652.00$903
Mar 20120440105.052.22$978
Feb 20120412101.102.57$1,059
Jan 2012046098.092.73$1,258
Dec 2011048196.873.24$1,558
Nov 2011051195.723.31$1,692
Oct 2011061884.983.65$2,255
Sep 2011013283.623.99$526
Aug 2011049383.404.15$2,046
Jul 2011056294.144.52$2,539
Jun 2011055792.904.64$2,584
May 2011057898.134.40$2,546
Apr 20110541105.964.33$2,344
Mar 2011056596.364.06$2,292
Feb 2011048985.644.18$2,044
Jan 2011057486.504.59$2,634
Dec 2010059785.734.35$2,596
Nov 2010057480.843.80$2,179
Oct 2010059778.103.51$2,095
Sep 2010059872.633.98$2,380
Aug 2010066373.684.42$2,930
Jul 2010050072.554.74$2,368
Jun 2010059270.364.91$2,907
May 2010062771.124.24$2,655
Apr 2010060681.694.12$2,498
Mar 2010064378.394.39$2,822
Feb 2010057173.585.44$3,108
Jan 2010066574.365.96$3,966
Dec 2009067771.445.48$3,713
Nov 2009067574.593.75$2,532
Oct 2009073272.544.11$3,009
Sep 2009040465.543.06$1,238
Aug 2009060067.423.22$1,931
Jul 2009047961.133.46$1,660
Jun 2009051666.163.90$2,010
May 2009055054.743.93$2,159
Apr 2009059246.773.59$2,124
Mar 2009052342.144.06$2,123
Feb 2009055832.814.63$2,585
Jan 2009060335.865.37$3,239
Dec 2008064337.105.98$3,843
Nov 2008060755.496.86$4,164
Oct 2008063575.246.92$4,395
Sep 20080624101.767.88$4,915
Aug 20080671114.228.48$5,692
Jul 20080708131.0811.39$8,064
Jun 20080631131.3313.03$8,224
May 20080687123.1711.57$7,952
Apr 20080645110.3110.45$6,743
Mar 20080707101.909.66$6,833
Feb 2008072892.538.77$6,385
Jan 2008078190.388.21$6,409
Dec 2007083688.337.30$6,104
Nov 2007070891.677.29$5,163
Oct 2007072682.856.92$5,025
Sep 2007080475.846.24$5,020
Aug 2007067569.066.39$4,312
Jul 2007056370.906.39$3,596
Jun 2007067462.007.55$5,088
May 2007075358.747.85$5,908
Apr 2007082759.617.81$6,455
Mar 2007069156.927.30$5,046
Feb 2007057955.108.22$4,757
Jan 2007069550.306.73$4,675
Dec 2006066156.656.92$4,573
Nov 2006062854.207.62$4,784
Oct 2006092254.906.01$5,545
Sep 2006043160.085.04$2,171
Aug 2006078068.717.34$5,725
Jul 2006080469.376.34$5,100
Jun 20069178966.286.38$11,068
May 2006077966.016.42$5,005
Apr 2006083064.397.36$6,109
Mar 2006086456.707.08$6,120
Feb 2006082257.597.75$6,371
Jan 2006093960.598.93$8,388
Dec 2005084254.9413.42$11,296
Nov 2005096054.6910.59$10,165
Oct 200501,06558.3413.80$14,692
Sep 200501,04161.4512.08$12,574
Aug 200501,17861.519.80$11,541
Jul 200501,28555.697.84$10,079
Jun 200501,09952.337.38$8,112
May 200501,27645.226.65$8,487
Apr 200501,51449.207.36$11,144
Mar 200501,52150.377.15$10,883
Feb 2005042745.226.31$2,695
Jan 2005049243.166.32$3,111
Dec 2004053539.866.75$3,612
Nov 2004050545.286.33$3,197
Oct 2004053449.706.52$3,479
Sep 2004052043.245.28$2,748
Aug 2004054942.375.55$3,047
Jul 2004055438.286.08$3,371
Jun 2004054936.106.43$3,532
May 2004057537.486.49$3,734
Apr 2004055834.475.86$3,269
Mar 2004059534.365.53$3,290
Feb 2004056132.455.51$3,091
Jan 2004062132.036.30$3,912
Dec 2003054330.266.30$3,422
Nov 2003052028.804.60$2,389
Oct 2003066128.174.76$3,146
Sep 2003066726.314.75$3,168
Aug 2003068429.765.13$3,509
Jul 2003073129.415.17$3,780
Jun 2003075328.565.98$4,505
May 2003072126.595.97$4,306
Apr 2003068826.675.41$3,720
Mar 2003083031.146.10$5,060
Feb 2003058433.487.93$4,629
Jan 2003077130.315.58$4,304
Dec 2002078626.914.85$3,815
Nov 2002080224.664.14$3,318
Oct 2002085826.464.23$3,629
Sep 2002085827.443.64$3,119
Aug 2002091625.963.16$2,898
Jul 2002094224.583.06$2,884
Jun 2002095123.733.34$3,175
May 200201,04624.663.58$3,749
Apr 200201,10823.653.51$3,892
Mar 200201,18222.003.10$3,667
Feb 200201,25918.222.38$2,991
Jan 200201,20617.172.38$2,865
Dec 2001054116.932.36$1,279
Nov 2001083018.072.41$1,997
Oct 200101,23619.782.53$3,126
Sep 200101,13924.262.25$2,564
Aug 200101,22624.873.05$3,743
Jul 200101,22523.933.20$3,916
Jun 200101,20524.563.82$4,608
May 200101,27425.524.31$5,488
Apr 200101,25324.685.34$6,685
Mar 200101,30924.545.38$7,038
Feb 200101,08627.755.77$6,263
Jan 200101,30027.478.40$10,918
Dec 200001,30526.889.12$11,905
Nov 200001,34832.215.66$7,627
Oct 2000991,42731.235.15$10,434
Sep 200001,41731.875.19$7,349
Aug 200001,47129.644.54$6,679
Jul 200001,50428.534.09$6,151
Jun 200001,47729.304.40$6,495
May 200001,56027.263.68$5,740
Apr 200001,54324.513.12$4,808
Mar 200001,62528.422.86$4,647
Feb 200001,52727.622.73$4,163
Jan 200001,66325.272.48$4,125
Dec 199901,73224.282.42$4,198
Nov 199901,77123.192.43$4,311
Oct 199901,88420.982.80$5,282
Sep 199901,86421.752.62$4,882
Aug 199902,39419.262.88$6,884
Jul 199902,17117.892.37$5,150
Jun 199902,19215.942.36$5,178
May 199902,26015.792.32$5,246
Apr 199902,35015.102.21$5,189
Mar 199902,59012.471.84$4,761
Feb 199902,4909.981.82$4,526
Jan 1999552,86710.381.90$6,018
Dec 19981233,0319.201.77$6,507
Nov 199803,24210.892.19$7,086
Oct 199803,50812.421.97$6,908
Sep 19981413,53612.592.08$9,139
Aug 199804,37611.301.91$8,347
Jul 199806,14911.742.24$13,757
Jun 199802,24611.242.24$5,025
May 199804,61112.622.21$10,173

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2019 — as filed, then multipliedworked
Condensate             0 bbl  × $ 55.05 =         $0
Gas                   28 Mcf  × $  2.66 =        $74

────────────────────────────────────────────────────
Month total                                      $74

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/170089 is the state's own key, not one this site invented.