SCHRADER "B"

Operated by BP AMERICA PRODUCTION COMPANY (P-5 40798) in the ELLIS RANCH (MORROW, LOWER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 171586District 10Field 28506608CondensateGasSaveExport
Value, all time
$756 k
Jul 1998 – Dec 2009
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
138
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 13 leases and 13 wells, and the rule below applies to all of them.

Discovered
1961-09-06
as the register files it
Field class
Gas
the register's own label
Between wells
2,500 ft
minimum
From a lease line
1,250 ft
minimum

A drilling unit in this field needs at least 640 acres.

The Commission's schedule remark for this field reads: ALLOCATION FORMULA SUSPENDED EFF. 4/1/93

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition313 bbl$9,855
GasProduction232,944 Mcf$745,661
Total$755,516

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.1899, -100.7738. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.18993, -100.77384 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,948 ft
1 wells filed one
Completion to plug
5.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,948 ft.

Completions filed
Jan 2009
1 of 1 wells
Plug dates filed
Nov 2014
1 of 1 wells

Last completion to plug: a median of 5.8 years across the 1 well that filed both dates, with the middle half between 5.8 years and 5.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3573206316,948 ftJan 2009Nov 2014Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (138)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

138 months

Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 200925067.423.22$1,686
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 200851055.496.86$2,830
Oct 20080075.246.92$0
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060668.717.34$44
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050261.4512.08$24
Aug 20050361.519.80$29
Jul 200504555.697.84$353
Jun 200501652.337.38$118
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040143.245.28$5
Aug 200403042.375.55$167
Jul 2004013238.286.08$803
Jun 2004016136.106.43$1,036
May 20040137.486.49$6
Apr 2004024834.475.86$1,453
Mar 200401,04634.365.53$5,785
Feb 2004099832.455.51$5,499
Jan 2004050732.036.30$3,194
Dec 200301,19730.266.30$7,543
Nov 2003089428.804.60$4,108
Oct 200301,57928.174.76$7,515
Sep 200301,31826.314.75$6,260
Aug 200301,36329.765.13$6,992
Jul 200302,09529.415.17$10,833
Jun 200302,09528.565.98$12,534
May 200301,98926.595.97$11,880
Apr 200302,50926.675.41$13,567
Mar 200302,74131.146.10$16,709
Feb 200302,02233.487.93$16,026
Jan 200302,05430.315.58$11,466
Dec 200201,70926.914.85$8,295
Nov 200201,53624.664.14$6,354
Oct 2002048326.464.23$2,043
Sep 20024027.443.64$110
Aug 20020025.963.16$0
Jul 20020124.583.06$3
Jun 200201423.733.34$47
May 2002019524.663.58$699
Apr 2002078623.653.51$2,761
Mar 2002092122.003.10$2,858
Feb 200202918.222.38$69
Jan 20020017.172.38$0
Dec 20010016.932.36$0
Nov 2001090218.072.41$2,170
Oct 200102,16319.782.53$5,470
Sep 200102,15624.262.25$4,854
Aug 200102,21224.873.05$6,754
Jul 200102,44023.933.20$7,801
Jun 20011402,33424.563.82$12,364
May 200102,67625.524.31$11,526
Apr 200102,86024.685.34$15,259
Mar 200103,33124.545.38$17,909
Feb 200103,22527.755.77$18,599
Jan 200103,21027.478.40$26,960
Dec 200003,80126.889.12$34,675
Nov 200004,66332.215.66$26,383
Oct 200005,71831.235.15$29,422
Sep 200002,35431.875.19$12,209
Aug 20000129.644.54$5
Jul 20000028.534.09$0
Jun 200002329.304.40$101
May 2000016327.263.68$600
Apr 2000088524.513.12$2,758
Mar 200003,63328.422.86$10,389
Feb 200003,96027.622.73$10,797
Jan 200004,24425.272.48$10,527
Dec 199904,66324.282.42$11,302
Nov 199905,37823.192.43$13,090
Oct 199906,31920.982.80$17,717
Sep 199906,74321.752.62$17,659
Aug 1999937,52219.262.88$23,421
Jul 199907,48117.892.37$17,748
Jun 199907,51415.942.36$17,749
May 199907,95115.792.32$18,454
Apr 1999010,98915.102.21$24,264
Mar 1999011,26012.471.84$20,700
Feb 1999012,2169.981.82$22,206
Jan 1999017,06610.381.90$32,425
Dec 1998019,9659.201.77$35,404
Nov 1998020,19710.892.19$44,145
Oct 19980012.421.97$0
Sep 19980012.592.08$0
Aug 19980011.301.91$0
Jul 19980011.742.24$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 2009 — as filed, then multipliedworked
Condensate            25 bbl  × $ 67.42 =     $1,686
Gas                    0 Mcf  × $  3.22 =         $0

────────────────────────────────────────────────────
Month total                                   $1,686

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/171586 is the state's own key, not one this site invented.