PRICE, L.M. -A-

Operated by PANTERA ENERGY COMPANY (P-5 638486) in the TEXAS HUGOTON field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 172111District 10Field 89120001GasSaveExport
Value, all time
$729 k
Jan 1999 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
329
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,719 leases and 1,719 wells, and the rule below applies to all of them.

Discovered
1945-06-25
as the register files it
Field class
Gas
the register's own label
Between wells
2,500 ft
minimum
From a lease line
1,250 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1996-02-01.

The Commission's schedule remark for this field reads: OPTIONS.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction148,725 Mcf$728,528
Total$728,528

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.2091, -101.9952. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.20908, -101.99522 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
3,301 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 3,301 ft.

Completions filed
Jan 1999
1 of 1 wells

1 well

42-4213070123,301 ftJan 1999

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (329)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

329 months

May 20260106.413.05$0
Apr 2026098.932.87$0
Mar 2026089.753.15$0
Feb 2026063.503.75$0
Jan 2026059.138.00$0
Dec 2025056.664.41$0
Nov 2025058.593.93$0
Oct 2025059.383.30$0
Sep 2025062.743.08$0
Aug 2025063.933.01$0
Jul 2025066.743.32$0
Jun 2025066.483.13$0
May 2025060.553.23$0
Apr 2025262.363.54$7
Mar 2025667.704.27$26
Feb 2025570.884.34$22
Jan 2025874.324.28$34
Dec 20241568.993.12$47
Nov 20241269.052.20$26
Oct 20241471.372.28$32
Sep 20241469.612.36$33
Aug 20241275.632.06$25
Jul 20241279.932.15$26
Jun 2024978.082.63$24
May 2024778.812.20$15
Apr 2024684.451.66$10
Mar 2024880.301.55$12
Feb 2024676.091.78$11
Jan 2024173.023.30$3
Dec 2023571.262.61$13
Nov 20231277.892.81$34
Oct 20231385.443.09$40
Sep 20231689.042.74$44
Aug 20232780.522.67$72
Jul 20232174.852.64$55
Jun 20233068.962.26$68
May 20233470.622.23$76
Apr 20232478.122.24$54
Mar 20231972.852.39$45
Feb 20231675.112.47$39
Jan 20233276.533.39$108
Dec 20223476.415.73$195
Nov 20224785.005.65$265
Oct 20223887.185.86$223
Sep 20224684.888.16$376
Aug 20225794.529.13$520
Jul 202271101.587.54$535
Jun 202282115.097.98$654
May 202269109.378.43$582
Apr 202242104.226.84$287
Mar 202262108.885.08$315
Feb 202210991.054.86$530
Jan 202219481.844.54$880
Dec 202114471.323.90$561
Nov 20219477.435.24$492
Oct 202112579.795.71$714
Sep 20212969.865.35$155
Aug 202112066.024.22$506
Jul 202112170.783.98$482
Jun 202115869.493.38$534
May 202113563.483.02$407
Apr 202111260.362.76$309
Mar 202118561.302.72$503
Feb 202117657.805.55$976
Jan 202119650.412.81$551
Dec 202011944.642.68$318
Nov 202016238.772.71$438
Oct 202012836.972.48$317
Sep 202014237.091.99$283
Aug 202014339.982.39$341
Jul 202020238.371.83$369
Jun 202022734.901.69$384
May 202024916.921.81$452
Apr 202023414.751.80$422
Mar 202021530.341.86$399
Feb 202028149.881.98$557
Jan 202029657.252.09$620
Dec 201933259.012.30$765
Nov 201923855.302.75$655
Oct 201928353.472.42$684
Sep 201934455.052.66$914
Aug 201918953.112.30$436
Jul 20198556.272.46$209
Jun 2019052.782.49$0
May 201917258.482.74$471
Apr 201926962.632.75$740
Mar 20195756.803.06$175
Feb 201918550.852.79$517
Jan 201933046.033.23$1,065
Dec 201833046.594.19$1,381
Nov 201829552.934.24$1,250
Oct 201833261.443.40$1,128
Sep 201828659.543.11$889
Aug 201828259.403.07$865
Jul 201821065.142.93$616
Jun 201829960.183.08$920
May 201841565.382.90$1,204
Apr 201841563.842.90$1,204
Mar 20189761.222.79$270
Feb 201840761.782.77$1,126
Jan 201839762.874.01$1,592
Dec 201732557.272.92$949
Nov 201733655.423.12$1,048
Oct 201726449.292.98$788
Sep 201751547.523.09$1,590
Aug 201732745.373.00$982
Jul 201743543.873.09$1,343
Jun 20173542.493.09$108
May 20178345.373.26$271
Apr 201734947.933.21$1,121
Mar 201719246.772.98$573
Feb 201716750.452.95$493
Jan 20179549.413.42$325
Dec 201616848.763.72$625
Nov 201633542.492.64$886
Oct 201633646.193.09$1,038
Sep 201628141.553.10$871
Aug 201629741.442.92$869
Jul 20162941.622.92$85
Jun 20162845.352.69$75
May 20165442.521.99$108
Apr 20167636.561.99$151
Mar 2016733.011.79$13
Feb 201626726.472.06$551
Jan 20168327.352.36$196
Dec 201518932.362.00$378
Nov 20159938.792.17$215
Oct 201519443.552.43$471
Sep 201514042.992.76$386
Aug 2015540.162.87$14
Jul 20152448.152.95$71
Jun 201531556.152.88$908
May 201526855.212.96$792
Apr 20155849.822.71$157
Mar 201517842.892.93$522
Feb 201522644.662.98$673
Jan 2015343.433.10$9
Dec 2014854.693.59$29
Nov 20141170.464.25$47
Oct 20141678.303.90$62
Sep 20141686.164.05$65
Aug 2014989.394.04$36
Jul 2014596.564.18$21
Jun 2014698.164.74$28
May 2014494.734.73$19
Apr 2014195.944.81$5
Mar 2014195.895.06$5
Feb 2014197.406.19$6
Jan 2014290.404.86$10
Dec 201318491.824.35$801
Nov 201334488.853.74$1,286
Oct 201349997.423.78$1,886
Sep 2013434104.113.72$1,614
Aug 2013162104.253.52$571
Jul 2013229102.523.72$851
Jun 20138494.403.93$330
May 201314094.834.15$581
Apr 20136993.964.28$296
Mar 201316493.623.91$642
Feb 201321691.233.42$739
Jan 201320291.603.42$691
Dec 201213086.773.42$445
Nov 201212486.953.62$450
Oct 201219289.383.40$653
Sep 201211094.672.92$321
Aug 201217092.662.91$494
Jul 201219385.133.02$583
Jun 201218579.822.52$466
May 201233791.612.49$839
Apr 2012170101.652.00$339
Mar 2012187105.052.22$416
Feb 2012245101.102.57$630
Jan 201234298.092.73$935
Dec 201142996.873.24$1,390
Nov 201116895.723.31$556
Oct 201126184.983.65$952
Sep 201116683.623.99$662
Aug 2011083.404.15$0
Jul 20116594.144.52$294
Jun 201119792.904.64$914
May 201133298.134.40$1,462
Apr 2011325105.964.33$1,408
Mar 201139596.364.06$1,603
Feb 201140185.644.18$1,676
Jan 201141786.504.59$1,914
Dec 201038185.734.35$1,656
Nov 201041480.843.80$1,571
Oct 201047378.103.51$1,660
Sep 201048872.633.98$1,942
Aug 201051573.684.42$2,276
Jul 201039072.554.74$1,847
Jun 201054570.364.91$2,676
May 201063571.124.24$2,689
Apr 201023581.694.12$969
Mar 201046678.394.39$2,045
Feb 201044273.585.44$2,406
Jan 201061074.365.96$3,638
Dec 200957271.445.48$3,137
Nov 200938274.593.75$1,433
Oct 200965872.544.11$2,705
Sep 200961865.543.06$1,894
Aug 200958367.423.22$1,876
Jul 200955661.133.46$1,926
Jun 200958866.163.90$2,290
May 200959554.743.93$2,336
Apr 200955746.773.59$1,998
Mar 200949642.144.06$2,013
Feb 200958132.814.63$2,692
Jan 200962135.865.37$3,335
Dec 200864937.105.98$3,879
Nov 200862855.496.86$4,308
Oct 200865475.246.92$4,527
Sep 2008663101.767.88$5,223
Aug 2008708114.228.48$6,006
Jul 2008702131.0811.39$7,995
Jun 2008669131.3313.03$8,719
May 2008640123.1711.57$7,408
Apr 2008539110.3110.45$5,635
Mar 2008601101.909.66$5,808
Feb 200866692.538.77$5,841
Jan 200866090.388.21$5,416
Dec 200774688.337.30$5,447
Nov 200765791.677.29$4,791
Oct 200768582.856.92$4,742
Sep 200776675.846.24$4,783
Aug 200776569.066.39$4,887
Jul 200776170.906.39$4,861
Jun 200773862.007.55$5,571
May 200778658.747.85$6,167
Apr 200778859.617.81$6,151
Mar 200781056.927.30$5,915
Feb 200773255.108.22$6,014
Jan 200779050.306.73$5,314
Dec 200669056.656.92$4,774
Nov 200676654.207.62$5,835
Oct 200688654.906.01$5,328
Sep 200668160.085.04$3,430
Aug 200686268.717.34$6,327
Jul 200684069.376.34$5,328
Jun 200672266.286.38$4,609
May 200665366.016.42$4,196
Apr 200673964.397.36$5,439
Mar 200675256.707.08$5,326
Feb 200671957.597.75$5,573
Jan 200678860.598.93$7,039
Dec 200580454.9413.42$10,786
Nov 200572454.6910.59$7,666
Oct 200567458.3413.80$9,298
Sep 200574061.4512.08$8,938
Aug 200573961.519.80$7,240
Jul 200579255.697.84$6,212
Jun 200571952.337.38$5,307
May 200560645.226.65$4,031
Apr 200574749.207.36$5,498
Mar 200597650.377.15$6,983
Feb 200585545.226.31$5,397
Jan 200591143.166.32$5,760
Dec 200495939.866.75$6,474
Nov 200488945.286.33$5,628
Oct 200486149.706.52$5,610
Sep 20041,04543.245.28$5,522
Aug 200489142.375.55$4,946
Jul 20041,06038.286.08$6,449
Jun 20041,03136.106.43$6,632
May 20041,01537.486.49$6,592
Apr 200489234.475.86$5,226
Mar 20041,55934.365.53$8,621
Feb 200490532.455.51$4,986
Jan 2004032.036.30$0
Dec 2003030.266.30$0
Nov 2003028.804.60$0
Oct 2003028.174.76$0
Sep 2003026.314.75$0
Aug 2003029.765.13$0
Jul 20034629.415.17$238
Jun 200387628.565.98$5,241
May 200377726.595.97$4,641
Apr 200390026.675.41$4,867
Mar 20031,08931.146.10$6,639
Feb 20031,04433.487.93$8,275
Jan 20031,13530.315.58$6,336
Dec 20021,14526.914.85$5,558
Nov 20021,10124.664.14$4,555
Oct 20021,04826.464.23$4,432
Sep 20021,05127.443.64$3,821
Aug 20021,12325.963.16$3,553
Jul 20021,14424.583.06$3,503
Jun 20021,10223.733.34$3,679
May 20021,09724.663.58$3,932
Apr 20021,03723.653.51$3,642
Mar 20021,08122.003.10$3,354
Feb 200298518.222.38$2,340
Jan 20021,25517.172.38$2,981
Dec 20011,25616.932.36$2,970
Nov 20011,06318.072.41$2,557
Oct 20011,21719.782.53$3,078
Sep 200197424.262.25$2,193
Aug 20011,38724.873.05$4,235
Jul 20011,48823.933.20$4,757
Jun 200159124.563.82$2,260
May 200151425.524.31$2,214
Apr 20011,01924.685.34$5,437
Mar 20011,24224.545.38$6,678
Feb 20011,23027.755.77$7,094
Jan 20011,35627.478.40$11,389
Dec 20001,39426.889.12$12,717
Nov 20001,29632.215.66$7,333
Oct 20001,43231.235.15$7,368
Sep 20001,34831.875.19$6,991
Aug 20001,45629.644.54$6,611
Jul 20001,12328.534.09$4,593
Jun 200066929.304.40$2,942
May 20001,23127.263.68$4,530
Apr 20001,18724.513.12$3,699
Mar 20001,52428.422.86$4,358
Feb 20001,40527.622.73$3,831
Jan 20001,57925.272.48$3,917
Dec 19991,61424.282.42$3,912
Nov 19991,40623.192.43$3,422
Oct 199961520.982.80$1,724
Sep 19991,19221.752.62$3,122
Aug 19991,30919.262.88$3,764
Jul 19991,37617.892.37$3,264
Jun 19991,37015.942.36$3,236
May 19991,47215.792.32$3,417
Apr 19991,02515.102.21$2,263
Mar 19991,30012.471.84$2,390
Feb 19991,5099.981.82$2,743
Jan 19991,21410.381.90$2,307

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2025 — as filed, then multipliedworked
Gas                    2 Mcf  × $  3.54 =         $7

────────────────────────────────────────────────────
Month total                                       $7

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/172111 is the state's own key, not one this site invented.