PIPER

Operated by COMPLETE OIL & GAS SERVICES, LLC (P-5 103662) in the LIPSCOMB (CLEVELAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 175996District 10Field 538692702 tax incentive programmesCondensateGasSaveExport
Value, all time
$873 k
Jun 1999 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
324
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,389 leases and 1,486 wells, and the rule below applies to all of them.

Discovered
1958-05-24
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2013-08-06.

The Commission's schedule remark for this field reads: FIELD

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112002-11-12149631
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition737 bbl$26,343
GasProduction175,444 Mcf$846,375
Total$872,718

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.2651, -100.2811. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.26514, -100.28112 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,350 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,350 ft.

Completions filed
Jun 1999
1 of 1 wells

1 well

42-29532438310,350 ftJun 1999

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (324)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

324 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20175047.933.21$240
Mar 20170046.772.98$0
Feb 201766050.452.95$3,330
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 201604542.492.64$119
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 201604541.442.92$132
Jul 201606641.622.92$193
Jun 201603445.352.69$91
May 201607642.521.99$151
Apr 201607936.561.99$157
Mar 201609033.011.79$161
Feb 2016010626.472.06$219
Jan 2016011427.352.36$270
Dec 2015011332.362.00$226
Nov 201505838.792.17$126
Oct 201504343.552.43$104
Sep 201506142.992.76$168
Aug 201505940.162.87$169
Jul 201505348.152.95$156
Jun 201509756.152.88$280
May 2015011955.212.96$352
Apr 2015011549.822.71$311
Mar 2015011942.892.93$349
Feb 2015011144.662.98$330
Jan 201504043.433.10$124
Dec 2014012954.693.59$463
Nov 2014012670.464.25$536
Oct 2014012078.303.90$468
Sep 2014011386.164.05$457
Aug 201409589.394.04$383
Jul 2014010896.564.18$451
Jun 2014011498.164.74$540
May 2014015894.734.73$747
Apr 2014016395.944.81$784
Mar 2014017095.895.06$860
Feb 2014019597.406.19$1,207
Jan 2014018890.404.86$914
Dec 2013017591.824.35$762
Nov 2013016488.853.74$613
Oct 2013016597.423.78$624
Sep 20130131104.113.72$487
Aug 20130130104.253.52$458
Jul 20130123102.523.72$457
Jun 2013012794.403.93$500
May 2013014994.834.15$618
Apr 2013015593.964.28$664
Mar 2013015993.623.91$622
Feb 2013013891.233.42$472
Jan 2013015891.603.42$540
Dec 2012015386.773.42$523
Nov 2012014286.953.62$515
Oct 2012014589.383.40$493
Sep 2012011894.672.92$344
Aug 201209792.662.91$282
Jul 2012012985.133.02$390
Jun 2012015879.822.52$398
May 2012016291.612.49$403
Apr 20120164101.652.00$327
Mar 20120184105.052.22$409
Feb 20120182101.102.57$468
Jan 2012019298.092.73$525
Dec 2011019096.873.24$616
Nov 2011019395.723.31$639
Oct 2011021584.983.65$784
Sep 2011020383.623.99$809
Aug 2011029583.404.15$1,224
Jul 2011014294.144.52$641
Jun 2011014392.904.64$664
May 2011015198.134.40$665
Apr 20110145105.964.33$628
Mar 2011018796.364.06$759
Feb 2011018285.644.18$761
Jan 2011021486.504.59$982
Dec 2010021085.734.35$913
Nov 2010012580.843.80$474
Oct 2010013878.103.51$484
Sep 2010018172.633.98$720
Aug 2010018973.684.42$835
Jul 2010019572.554.74$924
Jun 2010018370.364.91$899
May 2010018371.124.24$775
Apr 2010014681.694.12$602
Mar 2010011478.394.39$500
Feb 2010011473.585.44$620
Jan 2010017174.365.96$1,020
Dec 2009023571.445.48$1,289
Nov 2009021774.593.75$814
Oct 2009023372.544.11$958
Sep 2009021565.543.06$659
Aug 2009023467.423.22$753
Jul 2009022661.133.46$783
Jun 2009020866.163.90$810
May 2009018054.743.93$707
Apr 2009022146.773.59$793
Mar 2009023242.144.06$942
Feb 2009023632.814.63$1,093
Jan 2009025635.865.37$1,375
Dec 2008025737.105.98$1,536
Nov 2008025655.496.86$1,756
Oct 2008027175.246.92$1,876
Sep 20080275101.767.88$2,166
Aug 20080256114.228.48$2,172
Jul 20080308131.0811.39$3,508
Jun 20080338131.3313.03$4,405
May 20080384123.1711.57$4,445
Apr 20080657110.3110.45$6,869
Mar 20080712101.909.66$6,881
Feb 2008068692.538.77$6,017
Jan 2008075790.388.21$6,212
Dec 2007076788.337.30$5,601
Nov 2007075591.677.29$5,505
Oct 2007077282.856.92$5,344
Sep 2007071775.846.24$4,477
Aug 2007072169.066.39$4,606
Jul 2007073570.906.39$4,695
Jun 2007077262.007.55$5,827
May 2007080258.747.85$6,293
Apr 2007071059.617.81$5,542
Mar 2007080156.927.30$5,849
Feb 2007072155.108.22$5,924
Jan 2007082450.306.73$5,543
Dec 2006084256.656.92$5,825
Nov 2006083554.207.62$6,361
Oct 2006086754.906.01$5,214
Sep 2006078360.085.04$3,944
Aug 20069385568.717.34$12,666
Jul 2006087369.376.34$5,537
Jun 2006085866.286.38$5,477
May 2006085466.016.42$5,487
Apr 2006084264.397.36$6,198
Mar 2006086856.707.08$6,148
Feb 2006081157.597.75$6,286
Jan 2006089760.598.93$8,013
Dec 2005090654.9413.42$12,154
Nov 2005089654.6910.59$9,487
Oct 2005093858.3413.80$12,940
Sep 2005091761.4512.08$11,076
Aug 2005091161.519.80$8,925
Jul 2005092655.697.84$7,263
Jun 2005095552.337.38$7,049
May 2005081745.226.65$5,434
Apr 2005094849.207.36$6,978
Mar 2005097550.377.15$6,976
Feb 2005089045.226.31$5,618
Jan 2005096843.166.32$6,120
Dec 2004098139.866.75$6,623
Nov 2004098645.286.33$6,242
Oct 200401,03049.706.52$6,711
Sep 200401,00443.245.28$5,305
Aug 200401,04542.375.55$5,800
Jul 200401,05938.286.08$6,443
Jun 200401,03836.106.43$6,677
May 200401,06837.486.49$6,936
Apr 200401,01234.475.86$5,929
Mar 20041141,06734.365.53$9,818
Feb 200401,02332.455.51$5,636
Jan 200401,08632.036.30$6,841
Dec 200301,16130.266.30$7,316
Nov 200301,13828.804.60$5,229
Oct 200301,18828.174.76$5,654
Sep 200301,16526.314.75$5,533
Aug 200301,22429.765.13$6,279
Jul 200301,18329.415.17$6,117
Jun 2003099028.565.98$5,923
May 200301,24526.595.97$7,436
Apr 200301,21626.675.41$6,575
Mar 200301,16031.146.10$7,071
Feb 200301,22633.487.93$9,717
Jan 200301,48430.315.58$8,284
Dec 2002095426.914.85$4,630
Nov 200201,19924.664.14$4,960
Oct 200201,30326.464.23$5,511
Sep 200201,22127.443.64$4,439
Aug 20021611,32725.963.16$8,378
Jul 200201,29824.583.06$3,974
Jun 200201,31723.733.34$4,396
May 200201,32724.663.58$4,756
Apr 200201,31223.653.51$4,608
Mar 200201,52022.003.10$4,716
Feb 200201,36218.222.38$3,236
Jan 200201,56917.172.38$3,727
Dec 200101,52816.932.36$3,613
Nov 200101,53218.072.41$3,685
Oct 200101,63019.782.53$4,122
Sep 200101,62524.262.25$3,658
Aug 200101,69824.873.05$5,184
Jul 200101,77023.933.20$5,659
Jun 200101,74224.563.82$6,662
May 200101,81725.524.31$7,826
Apr 200101,82724.685.34$9,748
Mar 200101,93724.545.38$10,414
Feb 200101,81427.755.77$10,461
Jan 200102,07127.478.40$17,394
Dec 200002,18126.889.12$19,896
Nov 20001092,13732.215.66$15,602
Oct 200002,26531.235.15$11,655
Sep 200002,27931.875.19$11,820
Aug 200002,44129.644.54$11,084
Jul 200002,50528.534.09$10,245
Jun 200002,26829.304.40$9,973
May 200002,67627.263.68$9,847
Apr 200002,72124.513.12$8,479
Mar 200002,96928.422.86$8,491
Feb 200002,92827.622.73$7,983
Jan 20001893,34825.272.48$13,081
Dec 199903,63224.282.42$8,803
Nov 199903,82523.192.43$9,310
Oct 199904,29520.982.80$12,042
Sep 199904,81221.752.62$12,602
Aug 199905,76219.262.88$16,569
Jul 199907,59017.892.37$18,006
Jun 199902,02115.942.36$4,774

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2017 — as filed, then multipliedworked
Condensate             5 bbl  × $ 47.93 =       $240
Gas                    0 Mcf  × $  3.21 =         $0

────────────────────────────────────────────────────
Month total                                     $240

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/175996 is the state's own key, not one this site invented.