COOPER, G.M. NCT-1

Operated by COURSON OIL & GAS, INC. (P-5 182785) in the SPICER (MARMATON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 176467District 10Field 85118500CondensateGasSaveExport
Value, all time
$179 k
Mar 2000 – Nov 2018
Value, last 12 filed months
$0
at the published price for each month
Months reported
225
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 36 leases and 63 wells, and the rule below applies to all of them.

Discovered
1962-09-15
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 80 acres.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition169 bbl$8,979
GasProduction29,151 Mcf$169,884
Total$178,863

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.2736, -100.9797. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.27359, -100.97974 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,845 ft
1 wells filed one
Completion to plug
33.5 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,845 ft.

Completions filed
May 1985
1 of 1 wells
Plug dates filed
Nov 2018
1 of 1 wells

Last completion to plug: a median of 33.5 years across the 1 well that filed both dates, with the middle half between 33.5 years and 33.5 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3570040516,845 ftMay 1985Nov 2018Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (225)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

225 months

Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 201125084.983.65$2,125
Sep 2011021283.623.99$845
Aug 2011021283.404.15$880
Jul 2011021294.144.52$958
Jun 2011021292.904.64$984
May 2011021298.134.40$934
Apr 20110212105.964.33$919
Mar 2011021296.364.06$860
Feb 2011021285.644.18$886
Jan 2011021286.504.59$973
Dec 2010021285.734.35$922
Nov 2010021280.843.80$805
Oct 2010021278.103.51$744
Sep 2010021272.633.98$844
Aug 2010021273.684.42$937
Jul 2010021272.554.74$1,004
Jun 2010021270.364.91$1,041
May 2010021271.124.24$898
Apr 2010021281.694.12$874
Mar 2010021278.394.39$930
Feb 2010021273.585.44$1,154
Jan 2010021274.365.96$1,264
Dec 2009021271.445.48$1,163
Nov 2009021274.593.75$795
Oct 2009021272.544.11$871
Sep 2009021265.543.06$650
Aug 2009021267.423.22$682
Jul 2009021261.133.46$734
Jun 2009021266.163.90$826
May 2009021254.743.93$832
Apr 2009021246.773.59$761
Mar 2009021242.144.06$861
Feb 2009021232.814.63$982
Jan 2009021235.865.37$1,139
Dec 2008021237.105.98$1,267
Nov 2008021255.496.86$1,454
Oct 2008021275.246.92$1,467
Sep 20080212101.767.88$1,670
Aug 20080212114.228.48$1,798
Jul 20080212131.0811.39$2,415
Jun 20080212131.3313.03$2,763
May 20080212123.1711.57$2,454
Apr 20080212110.3110.45$2,216
Mar 20080212101.909.66$2,049
Feb 2008021292.538.77$1,859
Jan 2008021290.388.21$1,740
Dec 2007021288.337.30$1,548
Nov 2007021291.677.29$1,546
Oct 2007021282.856.92$1,467
Sep 2007021275.846.24$1,324
Aug 2007021269.066.39$1,354
Jul 2007021270.906.39$1,354
Jun 2007021262.007.55$1,600
May 2007021258.747.85$1,663
Apr 2007021259.617.81$1,655
Mar 2007421256.927.30$1,776
Feb 2007021255.108.22$1,742
Jan 2007021250.306.73$1,426
Dec 2006021256.656.92$1,467
Nov 2006021254.207.62$1,615
Oct 2006021254.906.01$1,275
Sep 2006021260.085.04$1,068
Aug 2006021268.717.34$1,556
Jul 2006021269.376.34$1,345
Jun 20063421266.286.38$3,607
May 2006021266.016.42$1,362
Apr 2006021264.397.36$1,560
Mar 2006021256.707.08$1,502
Feb 2006021257.597.75$1,643
Jan 2006021260.598.93$1,894
Dec 2005021254.9413.42$2,844
Nov 20054621254.6910.59$4,760
Oct 2005021258.3413.80$2,925
Sep 2005021261.4512.08$2,561
Aug 2005021261.519.80$2,077
Jul 2005021255.697.84$1,663
Jun 2005021252.337.38$1,565
May 2005021245.226.65$1,410
Apr 2005021249.207.36$1,560
Mar 2005021250.377.15$1,517
Feb 2005021245.226.31$1,338
Jan 2005021243.166.32$1,340
Dec 2004021039.866.75$1,418
Nov 2004021045.286.33$1,329
Oct 2004021049.706.52$1,368
Sep 2004021043.245.28$1,110
Aug 2004021042.375.55$1,166
Jul 2004021038.286.08$1,278
Jun 2004021036.106.43$1,351
May 2004021137.486.49$1,370
Apr 20043021034.475.86$2,264
Mar 2004021034.365.53$1,161
Feb 2004021032.455.51$1,157
Jan 2004021032.036.30$1,323
Dec 2003021030.266.30$1,323
Nov 2003021028.804.60$965
Oct 2003021028.174.76$1,000
Sep 2003021026.314.75$997
Aug 2003021029.765.13$1,077
Jul 2003021029.415.17$1,086
Jun 2003021028.565.98$1,256
May 2003021026.595.97$1,254
Apr 2003021026.675.41$1,136
Mar 2003021031.146.10$1,280
Feb 2003021033.487.93$1,664
Jan 2003021030.315.58$1,172
Dec 2002021026.914.85$1,019
Nov 2002021024.664.14$869
Oct 2002021026.464.23$888
Sep 20023021027.443.64$1,587
Aug 2002021025.963.16$664
Jul 2002021024.583.06$643
Jun 2002021023.733.34$701
May 2002021024.663.58$753
Apr 2002021023.653.51$738
Mar 2002021022.003.10$652
Feb 2002021018.222.38$499
Jan 2002021017.172.38$499
Dec 2001021016.932.36$497
Nov 2001021018.072.41$505
Oct 2001021019.782.53$531
Sep 2001021024.262.25$473
Aug 2001021024.873.05$641
Jul 2001021023.933.20$671
Jun 2001021024.563.82$803
May 2001021025.524.31$905
Apr 2001021024.685.34$1,120
Mar 2001021024.545.38$1,129
Feb 2001021027.755.77$1,211
Jan 2001021027.478.40$1,764
Dec 2000021026.889.12$1,916
Nov 2000021032.215.66$1,188
Oct 2000021031.235.15$1,081
Sep 2000021031.875.19$1,089
Aug 2000021029.644.54$954
Jul 2000021028.534.09$859
Jun 2000021029.304.40$923
May 2000021027.263.68$773
Apr 2000021024.513.12$654
Mar 20000828.422.86$23

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2011 — as filed, then multipliedworked
Condensate            25 bbl  × $ 84.98 =     $2,125
Gas                    0 Mcf  × $  3.65 =         $0

────────────────────────────────────────────────────
Month total                                   $2,125

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/176467 is the state's own key, not one this site invented.