FIRESTONE

Operated by LE NORMAN OPERATING LLC (P-5 491579) in the BRITT RANCH (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 180040District 10Field 12062300CondensateGasSaveExport
Value, all time
$489 k
Sep 2000 – Jun 2015
Value, last 12 filed months
$0
at the published price for each month
Months reported
178
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2 leases and 2 wells, and the rule below applies to all of them.

Discovered
1981-10-10
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: ALLOCATION FORMULA EFFECTIVE 08/01/2005.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,442 bbl$72,706
GasProduction70,161 Mcf$416,785
Total$489,492

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.5719, -100.0804. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.57192, -100.08042 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
16,225 ft
1 wells filed one
Completion to plug
14.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 16,225 ft.

Completions filed
Sep 2000
1 of 1 wells
Plug dates filed
Jun 2015
1 of 1 wells

Last completion to plug: a median of 14.8 years across the 1 well that filed both dates, with the middle half between 14.8 years and 14.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4833157010816,225 ftSep 2000Jun 2015Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (178)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

178 months

Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20078058.747.85$470
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 200603256.707.08$227
Feb 20062221157.597.75$12,870
Jan 2006012260.598.93$1,090
Dec 2005065854.9413.42$8,827
Nov 2005015154.6910.59$1,599
Oct 200505558.3413.80$759
Sep 2005012261.4512.08$1,474
Aug 2005016961.519.80$1,656
Jul 2005039655.697.84$3,106
Jun 2005030352.337.38$2,236
May 2005056345.226.65$3,745
Apr 2005035249.207.36$2,591
Mar 2005047650.377.15$3,406
Feb 2005093545.226.31$5,902
Jan 200561,66843.166.32$10,804
Dec 2004072739.866.75$4,908
Nov 200401,20445.286.33$7,622
Oct 200401,59149.706.52$10,366
Sep 2004071343.245.28$3,767
Aug 2004083642.375.55$4,640
Jul 2004034638.286.08$2,105
Jun 2004967236.106.43$4,648
May 200417848537.486.49$9,821
Apr 2004045534.475.86$2,666
Mar 2004080634.365.53$4,457
Feb 200401,53432.455.51$8,452
Jan 2004099532.036.30$6,268
Dec 200319391730.266.30$11,619
Nov 2003080128.804.60$3,681
Oct 2003081228.174.76$3,865
Sep 2003068726.314.75$3,263
Aug 2003033529.765.13$1,718
Jul 2003040529.415.17$2,094
Jun 2003072128.565.98$4,314
May 200301,31526.595.97$7,854
Apr 20032791226.675.41$5,652
Mar 20031601,20331.146.10$12,316
Feb 200301,22433.487.93$9,701
Jan 200301,60730.315.58$8,970
Dec 2002082426.914.85$4,000
Nov 200201,25424.664.14$5,188
Oct 200217448826.464.23$6,668
Sep 2002045527.443.64$1,654
Aug 2002032225.963.16$1,019
Jul 2002052124.583.06$1,595
Jun 200218343123.733.34$5,781
May 200201,03224.663.58$3,699
Apr 2002092923.653.51$3,263
Mar 2002083422.003.10$2,588
Feb 2002083018.222.38$1,972
Jan 200201,23217.172.38$2,927
Dec 2001084316.932.36$1,993
Nov 20011801,39918.072.41$6,618
Oct 2001086719.782.53$2,193
Sep 200101,68624.262.25$3,796
Aug 200101,35524.873.05$4,137
Jul 20011871,69723.933.20$9,900
Jun 200101,50924.563.82$5,771
May 200101,67625.524.31$7,219
Apr 20011881,54124.685.34$12,862
Mar 20011782,31824.545.38$16,831
Feb 200103,16127.755.77$18,230
Jan 20013634,96527.478.40$51,671
Dec 200018610,67626.889.12$102,391
Nov 20000032.215.66$0
Oct 20000031.235.15$0
Sep 20000031.875.19$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2007 — as filed, then multipliedworked
Condensate             8 bbl  × $ 58.74 =       $470
Gas                    0 Mcf  × $  7.85 =         $0

────────────────────────────────────────────────────
Month total                                     $470

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/180040 is the state's own key, not one this site invented.