HARRIS, MACK C.

Operated by LATIGO PETROLEUM, LLC (P-5 488260) in the LIPSCOMB (CLEVELAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 182646District 10Field 538692702 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.1 M
Mar 2001 – May 2026
Value, last 12 filed months
$50 k
at the published price for each month
Months reported
303
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,389 leases and 1,486 wells, and the rule below applies to all of them.

Discovered
1958-05-24
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2013-08-06.

The Commission's schedule remark for this field reads: FIELD

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112001-10-11144711
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition89 bbl$5,793
GasProduction442,811 Mcf$2,077,555
Total$2,083,348

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.1779, -100.3904. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.17792, -100.39044 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,170 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,170 ft.

Completions filed
Mar 2001
1 of 1 wells

1 well

42-2953257934198,170 ftMar 2001

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (303)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

303 months

May 20260482106.413.05$1,468
Apr 2026050298.932.87$1,441
Mar 2026079489.753.15$2,501
Feb 202601,24463.503.75$4,665
Jan 202602,30359.138.00$18,419
Dec 202501,77156.664.41$7,816
Nov 202501,16758.593.93$4,582
Oct 2025068759.383.30$2,270
Sep 2025051462.743.08$1,582
Aug 2025054163.933.01$1,631
Jul 2025055966.743.32$1,853
Jun 2025051866.483.13$1,621
May 2025052660.553.23$1,700
Apr 2025053962.363.54$1,910
Mar 2025059067.704.27$2,518
Feb 2025034070.884.34$1,476
Jan 2025045774.324.28$1,955
Dec 2024029168.993.12$908
Nov 2024022169.052.20$486
Oct 202402,37271.372.28$5,411
Sep 2024066369.612.36$1,568
Aug 2024045575.632.06$939
Jul 2024047179.932.15$1,011
Jun 2024050278.082.63$1,322
May 2024060178.812.20$1,321
Apr 2024040484.451.66$670
Mar 2024048680.301.55$751
Feb 2024044576.091.78$794
Jan 20240073.023.30$0
Dec 202301,83571.262.61$4,791
Nov 2023079077.892.81$2,218
Oct 2023055585.443.09$1,713
Sep 2023092589.042.74$2,530
Aug 202301,55180.522.67$4,146
Jul 2023054474.852.64$1,437
Jun 2023049868.962.26$1,125
May 2023045470.622.23$1,011
Apr 2023044378.122.24$991
Mar 2023071872.852.39$1,718
Feb 2023047575.112.47$1,171
Jan 202301,37576.533.39$4,658
Dec 202201,43876.415.73$8,238
Nov 202201,58985.005.65$8,972
Oct 202201,65787.185.86$9,716
Sep 2022086284.888.16$7,037
Aug 2022068494.529.13$6,243
Jul 20220642101.587.54$4,842
Jun 20220608115.097.98$4,850
May 20220542109.378.43$4,571
Apr 20220619104.226.84$4,232
Mar 20220633108.885.08$3,213
Feb 2022060091.054.86$2,915
Jan 202201,45081.844.54$6,580
Dec 202101,22871.323.90$4,788
Nov 2021069577.435.24$3,640
Oct 2021069679.795.71$3,977
Sep 2021067869.865.35$3,628
Aug 2021069466.024.22$2,929
Jul 2021071070.783.98$2,827
Jun 2021066769.493.38$2,255
May 2021068863.483.02$2,076
Apr 2021067960.362.76$1,873
Mar 2021070761.302.72$1,921
Feb 2021060657.805.55$3,362
Jan 2021070150.412.81$1,970
Dec 2020069444.642.68$1,857
Nov 2020072038.772.71$1,949
Oct 2020072036.972.48$1,784
Sep 2020070537.091.99$1,404
Aug 2020074139.982.39$1,767
Jul 2020074838.371.83$1,365
Jun 2020074234.901.69$1,254
May 2020078716.921.81$1,428
Apr 2020075014.751.80$1,353
Mar 2020073030.341.86$1,355
Feb 2020069049.881.98$1,367
Jan 2020075057.252.09$1,571
Dec 2019075059.012.30$1,728
Nov 2019075355.302.75$2,071
Oct 2019073953.472.42$1,787
Sep 2019074555.052.66$1,980
Aug 2019074553.112.30$1,717
Jul 2019075256.272.46$1,850
Jun 2019075152.782.49$1,871
May 2019076258.482.74$2,088
Apr 2019074062.632.75$2,036
Mar 2019078656.803.06$2,407
Feb 2019072550.852.79$2,024
Jan 2019079646.033.23$2,570
Dec 2018079346.594.19$3,319
Nov 2018079352.934.24$3,360
Oct 2018046061.443.40$1,563
Sep 2018067759.543.11$2,104
Aug 2018575959.403.07$2,625
Jul 2018078365.142.93$2,296
Jun 2018073560.183.08$2,262
May 2018075465.382.90$2,187
Apr 2018051463.842.90$1,491
Mar 2018079061.222.79$2,202
Feb 2018571561.782.77$2,287
Jan 2018082662.874.01$3,312
Dec 2017083857.272.92$2,448
Nov 2017079355.423.12$2,473
Oct 2017083149.292.98$2,479
Sep 2017081347.523.09$2,510
Aug 2017080845.373.00$2,428
Jul 2017084743.873.09$2,615
Jun 2017081042.493.09$2,501
May 2017085045.373.26$2,774
Apr 2017084847.933.21$2,723
Mar 2017088046.772.98$2,626
Feb 2017080250.452.95$2,368
Jan 2017085649.413.42$2,926
Dec 201601,12248.763.72$4,177
Nov 2016081442.492.64$2,153
Oct 2016091146.193.09$2,815
Sep 2016086241.553.10$2,673
Aug 2016089641.442.92$2,620
Jul 2016090641.622.92$2,649
Jun 20162087845.352.69$3,265
May 2016093342.521.99$1,858
Apr 2016089936.561.99$1,790
Mar 2016093133.011.79$1,670
Feb 2016084926.472.06$1,752
Jan 2016094227.352.36$2,227
Dec 2015094532.362.00$1,891
Nov 2015093538.792.17$2,026
Oct 2015091043.552.43$2,208
Sep 2015092142.992.76$2,541
Aug 2015097840.162.87$2,809
Jul 2015098248.152.95$2,892
Jun 2015094256.152.88$2,716
May 2015099055.212.96$2,926
Apr 2015096549.822.71$2,612
Mar 2015094642.892.93$2,776
Feb 2015090944.662.98$2,705
Jan 201501,01643.433.10$3,150
Dec 2014064754.693.59$2,324
Nov 2014094370.464.25$4,009
Oct 201401,01078.303.90$3,940
Sep 2014098486.164.05$3,981
Aug 201401,04889.394.04$4,229
Jul 2014097496.564.18$4,071
Jun 2014099098.164.74$4,690
May 201401,01494.734.73$4,793
Apr 201401,03095.944.81$4,953
Mar 201401,03595.895.06$5,234
Feb 2014074197.406.19$4,588
Jan 201401,03490.404.86$5,026
Dec 2013087991.824.35$3,828
Nov 201301,02988.853.74$3,847
Oct 2013093497.423.78$3,530
Sep 201301,109104.113.72$4,123
Aug 201301,177104.253.52$4,146
Jul 201301,214102.523.72$4,513
Jun 201301,15594.403.93$4,543
May 201301,28594.834.15$5,332
Apr 201301,61993.964.28$6,934
Mar 201301,39693.623.91$5,462
Feb 201301,31291.233.42$4,487
Jan 201301,49191.603.42$5,099
Dec 201201,78486.773.42$6,102
Nov 20120286.953.62$7
Oct 2012020389.383.40$690
Sep 2012076794.672.92$2,238
Aug 2012075292.662.91$2,187
Jul 2012096285.133.02$2,906
Jun 201201,03779.822.52$2,612
May 2012097991.612.49$2,436
Apr 201201,015101.652.00$2,027
Mar 20120915105.052.22$2,033
Feb 20120977101.102.57$2,511
Jan 201201,08198.092.73$2,956
Dec 201101,19496.873.24$3,868
Nov 201101,23495.723.31$4,086
Oct 201101,46384.983.65$5,338
Sep 2011091983.623.99$3,663
Aug 201101,49183.404.15$6,187
Jul 201101,53594.144.52$6,934
Jun 201101,47992.904.64$6,862
May 201101,13998.134.40$5,017
Apr 201101,087105.964.33$4,710
Mar 201101,13496.364.06$4,601
Feb 2011099585.644.18$4,159
Jan 201101,10286.504.59$5,057
Dec 201001,11785.734.35$4,856
Nov 201001,10780.843.80$4,201
Oct 201001,17578.103.51$4,123
Sep 201001,15772.633.98$4,604
Aug 201001,26373.684.42$5,582
Jul 2010591,07472.554.74$9,367
Jun 201001,15270.364.91$5,657
May 201001,20171.124.24$5,087
Apr 201001,17181.694.12$4,828
Mar 201001,21778.394.39$5,341
Feb 201001,10373.585.44$6,003
Jan 201001,22374.365.96$7,294
Dec 200901,23171.445.48$6,751
Nov 200901,20574.593.75$4,521
Oct 200901,26972.544.11$5,216
Sep 200901,25765.543.06$3,852
Aug 200901,27967.423.22$4,116
Jul 200901,26761.133.46$4,390
Jun 200901,24866.163.90$4,861
May 200901,32054.743.93$5,182
Apr 200901,35546.773.59$4,861
Mar 200901,39842.144.06$5,674
Feb 200901,23832.814.63$5,736
Jan 200901,36835.865.37$7,348
Dec 200801,42637.105.98$8,523
Nov 200801,27255.496.86$8,726
Oct 200801,28775.246.92$8,909
Sep 200801,254101.767.88$9,878
Aug 200801,337114.228.48$11,342
Jul 20080967131.0811.39$11,014
Jun 200801,241131.3313.03$16,173
May 200801,297123.1711.57$15,012
Apr 200801,285110.3110.45$13,435
Mar 200801,356101.909.66$13,104
Feb 200801,18392.538.77$10,376
Jan 200801,41790.388.21$11,628
Dec 200701,64888.337.30$12,034
Nov 200701,16791.677.29$8,509
Oct 200701,54882.856.92$10,715
Sep 200701,66175.846.24$10,372
Aug 200701,40169.066.39$8,950
Jul 200701,11870.906.39$7,142
Jun 200701,54862.007.55$11,685
May 200701,69258.747.85$13,276
Apr 200701,37759.617.81$10,748
Mar 200701,47856.927.30$10,792
Feb 200701,35455.108.22$11,124
Jan 200701,54450.306.73$10,386
Dec 200601,59156.656.92$11,007
Nov 200601,55754.207.62$11,860
Oct 200601,64054.906.01$9,863
Sep 200601,60460.085.04$8,080
Aug 200601,69568.717.34$12,441
Jul 200601,76869.376.34$11,214
Jun 200601,81866.286.38$11,606
May 200601,58266.016.42$10,164
Apr 200601,63564.397.36$12,034
Mar 200601,66956.707.08$11,821
Feb 200601,59057.597.75$12,324
Jan 200601,87860.598.93$16,777
Dec 200501,86054.9413.42$24,953
Nov 200501,86354.6910.59$19,726
Oct 200501,95758.3413.80$26,998
Sep 200501,92461.4512.08$23,240
Aug 200502,00861.519.80$19,672
Jul 200502,04455.697.84$16,032
Jun 200502,01852.337.38$14,895
May 200501,81745.226.65$12,085
Apr 200501,98449.207.36$14,603
Mar 200502,07250.377.15$14,825
Feb 200501,87445.226.31$11,829
Jan 200502,13043.166.32$13,466
Dec 200402,16439.866.75$14,609
Nov 200402,16245.286.33$13,686
Oct 200402,28349.706.52$14,874
Sep 200402,19343.245.28$11,588
Aug 200402,28442.375.55$12,678
Jul 200402,28738.286.08$13,915
Jun 200402,24336.106.43$14,429
May 200402,33537.486.49$15,165
Apr 200402,30034.475.86$13,474
Mar 200402,43434.365.53$13,460
Feb 200402,26832.455.51$12,496
Jan 200402,49332.036.30$15,705
Dec 200302,55930.266.30$16,126
Nov 200302,52028.804.60$11,580
Oct 200302,66128.174.76$12,665
Sep 200302,64126.314.75$12,543
Aug 200302,76429.765.13$14,179
Jul 200302,86229.415.17$14,799
Jun 200302,50628.565.98$14,993
May 200302,85026.595.97$17,022
Apr 200302,83426.675.41$15,324
Mar 200302,97931.146.10$18,160
Feb 200302,70733.487.93$21,455
Jan 200303,13130.315.58$17,477
Dec 200203,21226.914.85$15,590
Nov 200203,20624.664.14$13,263
Oct 200203,33426.464.23$14,100
Sep 200203,34327.443.64$12,152
Aug 200203,55325.963.16$11,242
Jul 200203,65724.583.06$11,197
Jun 200203,65923.733.34$12,215
May 200203,90024.663.58$13,978
Apr 200203,90923.653.51$13,730
Mar 200204,19522.003.10$13,016
Feb 200203,94918.222.38$9,382
Jan 200204,57817.172.38$10,876
Dec 200104,55416.932.36$10,767
Nov 200104,29018.072.41$10,320
Oct 200105,63119.782.53$14,240
Sep 200105,49024.262.25$12,360
Aug 200106,46924.873.05$19,751
Jul 200107,45823.933.20$23,844
Jun 200108,53724.563.82$32,647
May 2001011,09525.524.31$47,790
Apr 2001017,74624.685.34$94,681
Mar 20010024.545.38$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  482 Mcf  × $  3.05 =     $1,468

────────────────────────────────────────────────────
Month total                                   $1,468

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/182646 is the state's own key, not one this site invented.