HOOVER 'A'

Operated by LATIGO PETROLEUM, LLC (P-5 488260) in the PATTEN (KRIDER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 188837District 10Field 69658200Hydrogen sulphide fieldGasSaveExport
Value, all time
$2.4 M
Mar 2002 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
291
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 63 leases and 63 wells, and the rule below applies to all of them.

Discovered
1994-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 320 acres. The field rule took effect on 1998-01-06.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: RULE 2 AMENDED PER DOCKET 10-0205601 TO 467/1200.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction444,981 Mcf$2,420,992
Total$2,420,992

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.0921, -101.3181. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.09206, -101.31813 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
3,550 ft
1 wells filed one
Completion to plug
1 well filed both, dated out of order

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 3,550 ft.

Completions filed
Mar 2002
1 of 1 wells
Plug dates filed
Dec 1997
1 of 1 wells

Last completion to plug: no median is published. 1 well on this lease filed both dates, and on that one the last completion is dated after the plug date, so there is no interval to take a median of. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1953134833,550 ftMar 2002Dec 1997

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (291)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

291 months

May 20260106.413.05$0
Apr 2026098.932.87$0
Mar 2026089.753.15$0
Feb 2026063.503.75$0
Jan 2026059.138.00$0
Dec 2025056.664.41$0
Nov 2025058.593.93$0
Oct 2025059.383.30$0
Sep 2025062.743.08$0
Aug 2025063.933.01$0
Jul 2025066.743.32$0
Jun 2025066.483.13$0
May 2025060.553.23$0
Apr 2025562.363.54$18
Mar 2025067.704.27$0
Feb 2025070.884.34$0
Jan 2025074.324.28$0
Dec 2024068.993.12$0
Nov 2024069.052.20$0
Oct 2024071.372.28$0
Sep 2024069.612.36$0
Aug 2024075.632.06$0
Jul 2024079.932.15$0
Jun 2024178.082.63$3
May 2024078.812.20$0
Apr 2024084.451.66$0
Mar 2024080.301.55$0
Feb 2024076.091.78$0
Jan 2024073.023.30$0
Dec 2023071.262.61$0
Nov 2023077.892.81$0
Oct 2023085.443.09$0
Sep 2023089.042.74$0
Aug 2023080.522.67$0
Jul 2023074.852.64$0
Jun 2023068.962.26$0
May 2023270.622.23$4
Apr 2023278.122.24$4
Mar 2023172.852.39$2
Feb 2023475.112.47$10
Jan 2023176.533.39$3
Dec 2022076.415.73$0
Nov 2022085.005.65$0
Oct 2022087.185.86$0
Sep 2022084.888.16$0
Aug 2022094.529.13$0
Jul 20220101.587.54$0
Jun 20220115.097.98$0
May 20220109.378.43$0
Apr 20220104.226.84$0
Mar 20220108.885.08$0
Feb 2022091.054.86$0
Jan 2022081.844.54$0
Dec 2021071.323.90$0
Nov 2021077.435.24$0
Oct 2021079.795.71$0
Sep 2021069.865.35$0
Aug 2021066.024.22$0
Jul 2021070.783.98$0
Jun 2021369.493.38$10
May 202113863.483.02$416
Apr 20211760.362.76$47
Mar 202120561.302.72$557
Feb 202110057.805.55$555
Jan 202111150.412.81$312
Dec 202012344.642.68$329
Nov 2020038.772.71$0
Oct 2020036.972.48$0
Sep 2020037.091.99$0
Aug 2020039.982.39$0
Jul 2020038.371.83$0
Jun 2020034.901.69$0
May 2020016.921.81$0
Apr 2020014.751.80$0
Mar 2020030.341.86$0
Feb 2020049.881.98$0
Jan 2020057.252.09$0
Dec 2019059.012.30$0
Nov 2019055.302.75$0
Oct 2019053.472.42$0
Sep 2019055.052.66$0
Aug 2019053.112.30$0
Jul 2019056.272.46$0
Jun 2019052.782.49$0
May 2019058.482.74$0
Apr 2019062.632.75$0
Mar 2019056.803.06$0
Feb 2019050.852.79$0
Jan 2019046.033.23$0
Dec 2018046.594.19$0
Nov 2018052.934.24$0
Oct 2018061.443.40$0
Sep 2018059.543.11$0
Aug 2018059.403.07$0
Jul 2018065.142.93$0
Jun 2018060.183.08$0
May 2018065.382.90$0
Apr 2018063.842.90$0
Mar 2018061.222.79$0
Feb 2018061.782.77$0
Jan 2018062.874.01$0
Dec 2017057.272.92$0
Nov 2017055.423.12$0
Oct 2017049.292.98$0
Sep 2017047.523.09$0
Aug 2017045.373.00$0
Jul 2017043.873.09$0
Jun 2017042.493.09$0
May 201725645.373.26$835
Apr 201732347.933.21$1,037
Mar 201719846.772.98$591
Feb 201718750.452.95$552
Jan 20174049.413.42$137
Dec 201639948.763.72$1,485
Nov 201618242.492.64$481
Oct 201621046.193.09$649
Sep 201620541.553.10$636
Aug 201625341.442.92$740
Jul 201631241.622.92$912
Jun 201637445.352.69$1,005
May 20161,06942.521.99$2,128
Apr 201641836.561.99$832
Mar 201646033.011.79$825
Feb 201627426.472.06$565
Jan 201631327.352.36$740
Dec 201543532.362.00$871
Nov 201551238.792.17$1,110
Oct 201548743.552.43$1,182
Sep 201552242.992.76$1,440
Aug 201551340.162.87$1,474
Jul 201554148.152.95$1,593
Jun 201553256.152.88$1,534
May 201546655.212.96$1,377
Apr 201547949.822.71$1,296
Mar 201552942.892.93$1,552
Feb 201545144.662.98$1,342
Jan 201555143.433.10$1,708
Dec 201463254.693.59$2,270
Nov 201455070.464.25$2,339
Oct 201466178.303.90$2,579
Sep 201465386.164.05$2,642
Aug 201463889.394.04$2,574
Jul 201467296.564.18$2,809
Jun 201463098.164.74$2,984
May 201462894.734.73$2,968
Apr 201460495.944.81$2,905
Mar 201465095.895.06$3,287
Feb 201459797.406.19$3,697
Jan 201469590.404.86$3,378
Dec 201369091.824.35$3,005
Nov 201365288.853.74$2,437
Oct 201369097.423.78$2,608
Sep 2013580104.113.72$2,156
Aug 2013633104.253.52$2,230
Jul 2013717102.523.72$2,666
Jun 201373494.403.93$2,887
May 201375794.834.15$3,141
Apr 201331993.964.28$1,366
Mar 201352193.623.91$2,039
Feb 201365991.233.42$2,254
Jan 201380091.603.42$2,736
Dec 201281586.773.42$2,787
Nov 201280986.953.62$2,933
Oct 201285989.383.40$2,920
Sep 201286094.672.92$2,510
Aug 201279692.662.91$2,315
Jul 201287585.133.02$2,643
Jun 201284979.822.52$2,139
May 201287891.612.49$2,185
Apr 2012847101.652.00$1,691
Mar 2012892105.052.22$1,982
Feb 2012820101.102.57$2,108
Jan 201284198.092.73$2,299
Dec 201182596.873.24$2,673
Nov 201177395.723.31$2,560
Oct 201191584.983.65$3,338
Sep 201189683.623.99$3,571
Aug 201195183.404.15$3,946
Jul 201190994.144.52$4,106
Jun 201189492.904.64$4,148
May 201197998.134.40$4,312
Apr 20111,009105.964.33$4,372
Mar 20111,00496.364.06$4,074
Feb 201183885.644.18$3,503
Jan 20111,07686.504.59$4,938
Dec 20101,05785.734.35$4,596
Nov 20101,07280.843.80$4,069
Oct 20101,13578.103.51$3,983
Sep 20101,09772.633.98$4,365
Aug 20101,19473.684.42$5,277
Jul 20101,13572.554.74$5,376
Jun 20101,09870.364.91$5,392
May 20101,17871.124.24$4,989
Apr 20101,15881.694.12$4,774
Mar 20101,25478.394.39$5,503
Feb 20101,08573.585.44$5,905
Jan 20101,15874.365.96$6,906
Dec 20091,00971.445.48$5,533
Nov 20091,22974.593.75$4,611
Oct 20091,20072.544.11$4,932
Sep 20091,33865.543.06$4,101
Aug 20091,37067.423.22$4,409
Jul 20091,46861.133.46$5,086
Jun 20091,43966.163.90$5,605
May 20091,67754.743.93$6,583
Apr 20091,36746.773.59$4,904
Mar 20091,40942.144.06$5,719
Feb 20091,30032.814.63$6,023
Jan 20091,54835.865.37$8,314
Dec 20081,51137.105.98$9,031
Nov 20081,49755.496.86$10,270
Oct 20081,57175.246.92$10,874
Sep 20081,552101.767.88$12,225
Aug 20081,301114.228.48$11,036
Jul 20081,416131.0811.39$16,127
Jun 20081,284131.3313.03$16,734
May 20081,538123.1711.57$17,801
Apr 20081,688110.3110.45$17,648
Mar 20081,882101.909.66$18,188
Feb 20081,74892.538.77$15,331
Jan 20081,73790.388.21$14,253
Dec 20071,73788.337.30$12,684
Nov 20071,55491.677.29$11,331
Oct 20071,67182.856.92$11,567
Sep 20071,46375.846.24$9,135
Aug 20071,15769.066.39$7,391
Jul 200798470.906.39$6,286
Jun 20071,49462.007.55$11,277
May 20071,34658.747.85$10,561
Apr 20071,82459.617.81$14,237
Mar 20071,25756.927.30$9,179
Feb 20071,37655.108.22$11,305
Jan 200789450.306.73$6,014
Dec 20061,77056.656.92$12,246
Nov 20061,89154.207.62$14,405
Oct 20061,89154.906.01$11,372
Sep 20061,62360.085.04$8,175
Aug 20061,87668.717.34$13,770
Jul 20061,28869.376.34$8,169
Jun 20061,51966.286.38$9,697
May 20061,81966.016.42$11,687
Apr 20061,90264.397.36$14,000
Mar 20062,50156.707.08$17,714
Feb 20062,65657.597.75$20,587
Jan 20062,78760.598.93$24,897
Dec 20052,86254.9413.42$38,395
Nov 20052,60954.6910.59$27,625
Oct 20052,16358.3413.80$29,840
Sep 20053,12061.4512.08$37,686
Aug 20053,47361.519.80$34,024
Jul 20053,16655.697.84$24,833
Jun 20053,36452.337.38$24,830
May 20053,83145.226.65$25,481
Apr 20053,44049.207.36$25,320
Mar 20053,55850.377.15$25,457
Feb 20053,52045.226.31$22,218
Jan 20054,00043.166.32$25,289
Dec 20044,25639.866.75$28,733
Nov 20044,03945.286.33$25,569
Oct 20043,96049.706.52$25,800
Sep 20044,53643.245.28$23,968
Aug 20044,93042.375.55$27,365
Jul 20045,14538.286.08$31,303
Jun 20045,26736.106.43$33,883
May 20045,16737.486.49$33,557
Apr 20044,30534.475.86$25,221
Mar 20044,32934.365.53$23,940
Feb 20044,88132.455.51$26,892
Jan 20045,86632.036.30$36,954
Dec 20036,94730.266.30$43,777
Nov 20036,86628.804.60$31,550
Oct 20036,80428.174.76$32,385
Sep 20037,79626.314.75$37,026
Aug 20037,79629.765.13$39,991
Jul 20038,94829.415.17$46,269
Jun 20037,06528.565.98$42,270
May 20039,33326.595.97$55,743
Apr 20039,34926.675.41$50,553
Mar 20039,54531.146.10$58,187
Feb 20039,53333.487.93$75,557
Jan 200310,63330.315.58$59,354
Dec 200211,07526.914.85$53,755
Nov 200211,80524.664.14$48,837
Oct 200213,25226.464.23$56,044
Sep 200213,25427.443.64$48,181
Aug 200214,91325.963.16$47,187
Jul 200215,43024.583.06$47,243
Jun 200214,68823.733.34$49,032
May 200216,40624.663.58$58,799
Apr 2002023.653.51$0
Mar 2002022.003.10$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2025 — as filed, then multipliedworked
Gas                    5 Mcf  × $  3.54 =        $18

────────────────────────────────────────────────────
Month total                                      $18

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/188837 is the state's own key, not one this site invented.