Operated by COURSON OIL & GAS, INC. (P-5 182785) in the CAMP (MORROW, LOWER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 190887District 10Field 15047500CondensateGasSaveExport
Value, all time
$860 k
Sep 2002 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
285
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2 leases and 2 wells, and the rule below applies to all of them.

Discovered
1980-05-01
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: ALLOCATION FORMULA EFF. 11-1-80 PER AMENDMENT TO SWR 28 & 29

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,229 bbl$51,706
GasProduction136,976 Mcf$808,138
Total$859,845

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.2287, -100.7973. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.22873, -100.79725 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,325 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,325 ft.

Completions filed
Sep 2002
1 of 1 wells

1 well

42-3573238515729,325 ftSep 2002

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (285)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

285 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 201904162.632.75$113
Mar 201903456.803.06$104
Feb 201907050.852.79$195
Jan 201906846.033.23$220
Dec 201806146.594.19$255
Nov 201804452.934.24$186
Oct 201805161.443.40$173
Sep 201801859.543.11$56
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20171155.423.12$59
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 201701246.772.98$36
Feb 201704350.452.95$127
Jan 201701849.413.42$62
Dec 201602848.763.72$104
Nov 201601942.492.64$50
Oct 201602546.193.09$77
Sep 201603841.553.10$118
Aug 20160041.442.92$0
Jul 201602441.622.92$70
Jun 201646045.352.69$343
May 201607242.521.99$143
Apr 201603436.561.99$68
Mar 201602733.011.79$48
Feb 201603226.472.06$66
Jan 201603927.352.36$92
Dec 201505732.362.00$114
Nov 201504238.792.17$91
Oct 201506643.552.43$160
Sep 201504542.992.76$124
Aug 201505040.162.87$144
Jul 201504548.152.95$133
Jun 201502156.152.88$61
May 201505755.212.96$168
Apr 201504249.822.71$114
Mar 201505242.892.93$153
Feb 201505144.662.98$152
Jan 201503243.433.10$99
Dec 201402454.693.59$86
Nov 201405670.464.25$238
Oct 201407578.303.90$293
Sep 201408486.164.05$340
Aug 201409189.394.04$367
Jul 2014010396.564.18$431
Jun 201406498.164.74$303
May 201407994.734.73$373
Apr 201405795.944.81$274
Mar 201408395.895.06$420
Feb 2014018797.406.19$1,158
Jan 2014012590.404.86$608
Dec 20130991.824.35$39
Nov 2013012288.853.74$456
Oct 2013016497.423.78$620
Sep 20130131104.113.72$487
Aug 20130183104.253.52$645
Jul 20130205102.523.72$762
Jun 2013016294.403.93$637
May 201304994.834.15$203
Apr 201309093.964.28$385
Mar 2013014293.623.91$556
Feb 2013019991.233.42$681
Jan 20130091.603.42$0
Dec 201208586.773.42$291
Nov 2012013686.953.62$493
Oct 2012014689.383.40$496
Sep 2012015494.672.92$449
Aug 2012016292.662.91$471
Jul 2012015585.133.02$468
Jun 2012011379.822.52$285
May 2012020891.612.49$518
Apr 20120148101.652.00$296
Mar 20120182105.052.22$404
Feb 20120164101.102.57$422
Jan 2012019398.092.73$528
Dec 2011019096.873.24$616
Nov 2011020995.723.31$692
Oct 2011018884.983.65$686
Sep 2011020783.623.99$825
Aug 2011021483.404.15$888
Jul 2011022094.144.52$994
Jun 2011021192.904.64$979
May 201107698.134.40$335
Apr 20110266105.964.33$1,153
Mar 2011028896.364.06$1,169
Feb 2011033485.644.18$1,396
Jan 2011018486.504.59$844
Dec 2010035885.734.35$1,556
Nov 2010032080.843.80$1,215
Oct 2010025178.103.51$881
Sep 2010023872.633.98$947
Aug 2010031873.684.42$1,405
Jul 2010030672.554.74$1,449
Jun 2010030270.364.91$1,483
May 2010030871.124.24$1,304
Apr 2010033081.694.12$1,360
Mar 2010035078.394.39$1,536
Feb 2010029773.585.44$1,616
Jan 2010035074.365.96$2,087
Dec 2009036471.445.48$1,996
Nov 2009038274.593.75$1,433
Oct 2009039072.544.11$1,603
Sep 2009037565.543.06$1,149
Aug 2009037967.423.22$1,220
Jul 2009039561.133.46$1,368
Jun 2009033766.163.90$1,313
May 2009043554.743.93$1,708
Apr 2009031546.773.59$1,130
Mar 2009032242.144.06$1,307
Feb 2009035232.814.63$1,631
Jan 2009035435.865.37$1,901
Dec 2008031137.105.98$1,859
Nov 2008036455.496.86$2,497
Oct 2008040575.246.92$2,803
Sep 20080339101.767.88$2,670
Aug 20080265114.228.48$2,248
Jul 20080265131.0811.39$3,018
Jun 20080360131.3313.03$4,692
May 20080412123.1711.57$4,769
Apr 20080641110.3110.45$6,702
Mar 20080903101.909.66$8,727
Feb 200801,03992.538.77$9,113
Jan 2008014390.388.21$1,173
Dec 2007018588.337.30$1,351
Nov 200710814991.677.29$10,987
Oct 2007016782.856.92$1,156
Sep 2007029775.846.24$1,855
Aug 2007019369.066.39$1,233
Jul 2007021470.906.39$1,367
Jun 2007024362.007.55$1,834
May 2007015658.747.85$1,224
Apr 2007024859.617.81$1,936
Mar 2007016656.927.30$1,212
Feb 2007016555.108.22$1,356
Jan 2007047650.306.73$3,202
Dec 2006052156.656.92$3,605
Nov 2006048654.207.62$3,702
Oct 2006066054.906.01$3,969
Sep 2006084760.085.04$4,267
Aug 2006068668.717.34$5,035
Jul 2006068269.376.34$4,326
Jun 2006052166.286.38$3,326
May 2006072566.016.42$4,658
Apr 2006072964.397.36$5,366
Mar 2006091156.707.08$6,453
Feb 2006081457.597.75$6,309
Jan 2006080760.598.93$7,209
Dec 200501,08154.9413.42$14,502
Nov 200501,18154.6910.59$12,505
Oct 200501,05458.3413.80$14,541
Sep 20051821,23561.4512.08$26,101
Aug 200501,27661.519.80$12,501
Jul 200501,33855.697.84$10,495
Jun 200501,34352.337.38$9,913
May 200501,45745.226.65$9,691
Apr 200501,47449.207.36$10,849
Mar 200501,37350.377.15$9,824
Feb 200501,40045.226.31$8,837
Jan 200501,54643.166.32$9,774
Dec 200401,74839.866.75$11,801
Nov 20041821,84045.286.33$19,889
Oct 200401,85849.706.52$12,105
Sep 200401,37343.245.28$7,255
Aug 200402,02442.375.55$11,235
Jul 200402,12738.286.08$12,941
Jun 200401,66436.106.43$10,705
May 200402,13237.486.49$13,846
Apr 200402,22934.475.86$13,059
Mar 20041792,51634.365.53$20,064
Feb 200402,54732.455.51$14,033
Jan 200402,95932.036.30$18,641
Dec 200303,01030.266.30$18,968
Nov 200302,48728.804.60$11,428
Oct 20031952,53428.174.76$17,554
Sep 200302,97626.314.75$14,134
Aug 200302,50929.765.13$12,870
Jul 200303,01129.415.17$15,569
Jun 200303,24128.565.98$19,391
May 200303,39326.595.97$20,265
Apr 200303,66626.675.41$19,823
Mar 20031823,77431.146.10$28,674
Feb 200303,84933.487.93$30,507
Jan 200304,66230.315.58$26,023
Dec 200205,89526.914.85$28,613
Nov 20021965,53024.664.14$27,711
Oct 200208,22026.464.23$34,763
Sep 200204,48527.443.64$16,304

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2019 — as filed, then multipliedworked
Condensate             0 bbl  × $ 62.63 =         $0
Gas                   41 Mcf  × $  2.75 =       $113

────────────────────────────────────────────────────
Month total                                     $113

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/190887 is the state's own key, not one this site invented.