MARIE

Operated by APACHE CORPORATION (P-5 27200) in the MORRISON RANCH (MORROW LO.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 192449District 10Field 63066200CondensateGasSaveExport
Value, all time
$2.4 M
Dec 2002 – Mar 2014
Value, last 12 filed months
$940
at the published price for each month
Months reported
136
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 33 leases and 33 wells, and the rule below applies to all of them.

Discovered
1963-11-20
as the register files it
Field class
Oil and gas
the register's own label
Between wells
2,640 ft
minimum
From a lease line
1,320 ft
minimum

A drilling unit in this field needs at least 640 acres.

The Commission's schedule remark for this field reads: CONSOLIDATED INTO THE MORRISON RANCH (MORROW LO.) FIELD.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,425 bbl$70,472
GasProduction346,409 Mcf$2,319,225
Total$2,389,697

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.9969, -100.6854. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.99686, -100.68540 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
11,000 ft
1 wells filed one
Completion to plug
5.7 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,000 ft.

Completions filed
Jan 2013
1 of 1 wells
Plug dates filed
Sep 2018
1 of 1 wells

Last completion to plug: a median of 5.7 years across the 1 well that filed both dates, with the middle half between 5.7 years and 5.7 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-39331536111,000 ftJan 2013Sep 2018Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (136)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

136 months

Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 201310093.964.28$940
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 2012041386.953.62$1,497
Oct 2012039289.383.40$1,333
Sep 2012036194.672.92$1,054
Aug 2012032192.662.91$934
Jul 2012027485.133.02$828
Jun 2012031279.822.52$786
May 20122724291.612.49$3,076
Apr 20120122101.652.00$244
Mar 20120244105.052.22$542
Feb 20120295101.102.57$758
Jan 2012030298.092.73$826
Dec 2011029596.873.24$956
Nov 2011028295.723.31$934
Oct 2011028784.983.65$1,047
Sep 2011026183.623.99$1,040
Aug 2011015783.404.15$651
Jul 2011029094.144.52$1,310
Jun 2011028492.904.64$1,318
May 2011028998.134.40$1,273
Apr 20110281105.964.33$1,218
Mar 2011029596.364.06$1,197
Feb 2011026285.644.18$1,095
Jan 2011028886.504.59$1,322
Dec 2010027485.734.35$1,191
Nov 2010022480.843.80$850
Oct 201006578.103.51$228
Sep 20100472.633.98$16
Aug 20100273.684.42$9
Jul 20100172.554.74$5
Jun 20100070.364.91$0
May 2010080871.124.24$3,422
Apr 2010077281.694.12$3,183
Mar 2010073978.394.39$3,243
Feb 2010070873.585.44$3,853
Jan 2010078974.365.96$4,706
Dec 2009085371.445.48$4,678
Nov 200901,51474.593.75$5,680
Oct 200901,59372.544.11$6,548
Sep 200901,86065.543.06$5,700
Aug 200901,89567.423.22$6,099
Jul 200901,39161.133.46$4,819
Jun 200901,28166.163.90$4,990
May 200901,75054.743.93$6,870
Apr 200901,13846.773.59$4,083
Mar 200901,63342.144.06$6,628
Feb 200901,79832.814.63$8,330
Jan 200902,28935.865.37$12,294
Dec 200802,44037.105.98$14,584
Nov 200802,40955.496.86$16,527
Oct 200802,52675.246.92$17,485
Sep 200802,540101.767.88$20,008
Aug 200802,698114.228.48$22,887
Jul 200802,547131.0811.39$29,009
Jun 200802,449131.3313.03$31,917
May 200802,542123.1711.57$29,422
Apr 200802,402110.3110.45$25,113
Mar 20081982,716101.909.66$46,424
Feb 200802,57492.538.77$22,575
Jan 200802,54790.388.21$20,900
Dec 200702,86288.337.30$20,898
Nov 200702,90591.677.29$21,182
Oct 200703,03182.856.92$20,981
Sep 200703,03775.846.24$18,964
Aug 200703,20369.066.39$20,461
Jul 200703,16570.906.39$20,218
Jun 200703,16562.007.55$23,891
May 200703,30158.747.85$25,901
Apr 200703,22259.617.81$25,148
Mar 200703,51356.927.30$25,652
Feb 200703,49655.108.22$28,723
Jan 200703,34250.306.73$22,481
Dec 200603,64956.656.92$25,245
Nov 200603,56554.207.62$27,156
Oct 200603,82654.906.01$23,009
Sep 200605,17560.085.04$26,068
Aug 200604,24268.717.34$31,136
Jul 200603,89669.376.34$24,711
Jun 200603,37166.286.38$21,520
May 200603,45366.016.42$22,186
Apr 200603,39064.397.36$24,952
Mar 200603,27156.707.08$23,168
Feb 200602,63257.597.75$20,401
Jan 200603,72360.598.93$33,259
Dec 200503,83354.9413.42$51,421
Nov 200503,89454.6910.59$41,231
Oct 200504,03358.3413.80$55,638
Sep 200504,07161.4512.08$49,174
Aug 200504,27961.519.80$41,921
Jul 20051995,86655.697.84$57,093
Jun 200504,41452.337.38$32,580
May 200504,73845.226.65$31,513
Apr 200504,66049.207.36$34,300
Mar 20051974,73550.377.15$43,801
Feb 200504,35445.226.31$27,482
Jan 200505,05343.166.32$31,946
Dec 200405,05939.866.75$34,154
Nov 200404,53545.286.33$28,708
Oct 200405,35849.706.52$34,908
Sep 20041925,52043.245.28$37,469
Aug 200406,11042.375.55$33,915
Jul 200405,85438.286.08$35,617
Jun 200405,30836.106.43$34,146
May 200405,49737.486.49$35,701
Apr 200406,23334.475.86$36,516
Mar 20042076,67734.365.53$44,037
Feb 200406,50332.455.51$35,829
Jan 200406,29932.036.30$39,681
Dec 200305,98830.266.30$37,734
Nov 200306,36328.804.60$29,239
Oct 200306,20728.174.76$29,543
Sep 20032007,18026.314.75$39,362
Aug 200307,92329.765.13$40,643
Jul 200307,93029.415.17$41,005
Jun 200307,74128.565.98$46,314
May 200308,41526.595.97$50,260
Apr 20031958,74326.675.41$52,477
Mar 200309,07831.146.10$55,340
Feb 200305,20333.487.93$41,238
Jan 20030030.315.58$0
Dec 20020026.914.85$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2013 — as filed, then multipliedworked
Condensate            10 bbl  × $ 93.96 =       $940
Gas                    0 Mcf  × $  4.28 =         $0

────────────────────────────────────────────────────
Month total                                     $940

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/192449 is the state's own key, not one this site invented.