COURSON RANCH "B" UNIT 13

Operated by LATIGO PETROLEUM, LLC (P-5 488260) in the ALPAR-PEARSON (BROWN DOLOMITE) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 193294District 10Field 01933790GasSaveExport
Value, all time
$2.3 M
Nov 2002 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
283
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 51 leases and 51 wells, and the rule below applies to all of them.

Discovered
1991-05-17
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 01/01/2000.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction376,582 Mcf$2,295,530
Total$2,295,530

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.0472, -101.0336. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.04723, -101.03359 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
3,543 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 3,543 ft.

Completions filed
Oct 2022
1 of 1 wells

1 well

42-39331531743,543 ftOct 2022

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (283)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

283 months

May 20260106.413.05$0
Apr 2026098.932.87$0
Mar 2026089.753.15$0
Feb 2026063.503.75$0
Jan 2026059.138.00$0
Dec 2025056.664.41$0
Nov 2025058.593.93$0
Oct 2025059.383.30$0
Sep 2025062.743.08$0
Aug 2025063.933.01$0
Jul 2025066.743.32$0
Jun 2025066.483.13$0
May 2025060.553.23$0
Apr 2025062.363.54$0
Mar 2025067.704.27$0
Feb 2025070.884.34$0
Jan 2025074.324.28$0
Dec 2024068.993.12$0
Nov 2024069.052.20$0
Oct 2024071.372.28$0
Sep 2024069.612.36$0
Aug 2024075.632.06$0
Jul 2024079.932.15$0
Jun 2024078.082.63$0
May 2024078.812.20$0
Apr 2024084.451.66$0
Mar 2024080.301.55$0
Feb 2024076.091.78$0
Jan 2024073.023.30$0
Dec 2023071.262.61$0
Nov 2023077.892.81$0
Oct 2023085.443.09$0
Sep 2023089.042.74$0
Aug 2023080.522.67$0
Jul 2023074.852.64$0
Jun 2023068.962.26$0
May 2023070.622.23$0
Apr 2023078.122.24$0
Mar 2023072.852.39$0
Feb 2023075.112.47$0
Jan 2023076.533.39$0
Dec 2022076.415.73$0
Nov 2022085.005.65$0
Oct 2022087.185.86$0
Sep 2022084.888.16$0
Aug 2022094.529.13$0
Jul 20220101.587.54$0
Jun 20220115.097.98$0
May 20220109.378.43$0
Apr 20220104.226.84$0
Mar 20220108.885.08$0
Feb 2022091.054.86$0
Jan 2022081.844.54$0
Dec 2021071.323.90$0
Nov 2021077.435.24$0
Oct 2021079.795.71$0
Sep 2021069.865.35$0
Aug 2021066.024.22$0
Jul 2021070.783.98$0
Jun 2021069.493.38$0
May 2021063.483.02$0
Apr 2021060.362.76$0
Mar 2021061.302.72$0
Feb 2021057.805.55$0
Jan 2021050.412.81$0
Dec 2020044.642.68$0
Nov 2020038.772.71$0
Oct 2020036.972.48$0
Sep 2020037.091.99$0
Aug 2020039.982.39$0
Jul 2020038.371.83$0
Jun 2020034.901.69$0
May 2020016.921.81$0
Apr 2020014.751.80$0
Mar 2020030.341.86$0
Feb 2020049.881.98$0
Jan 2020057.252.09$0
Dec 2019059.012.30$0
Nov 2019055.302.75$0
Oct 2019053.472.42$0
Sep 2019055.052.66$0
Aug 2019053.112.30$0
Jul 2019056.272.46$0
Jun 2019052.782.49$0
May 2019058.482.74$0
Apr 2019062.632.75$0
Mar 2019056.803.06$0
Feb 2019050.852.79$0
Jan 2019046.033.23$0
Dec 2018046.594.19$0
Nov 2018052.934.24$0
Oct 2018061.443.40$0
Sep 2018059.543.11$0
Aug 2018059.403.07$0
Jul 2018065.142.93$0
Jun 2018060.183.08$0
May 2018065.382.90$0
Apr 2018063.842.90$0
Mar 2018061.222.79$0
Feb 2018061.782.77$0
Jan 2018062.874.01$0
Dec 2017057.272.92$0
Nov 2017055.423.12$0
Oct 2017049.292.98$0
Sep 2017047.523.09$0
Aug 2017045.373.00$0
Jul 2017043.873.09$0
Jun 2017042.493.09$0
May 2017045.373.26$0
Apr 2017047.933.21$0
Mar 2017046.772.98$0
Feb 2017050.452.95$0
Jan 2017049.413.42$0
Dec 2016048.763.72$0
Nov 2016042.492.64$0
Oct 2016046.193.09$0
Sep 2016041.553.10$0
Aug 2016041.442.92$0
Jul 2016041.622.92$0
Jun 2016045.352.69$0
May 2016042.521.99$0
Apr 2016036.561.99$0
Mar 2016033.011.79$0
Feb 2016026.472.06$0
Jan 2016027.352.36$0
Dec 2015032.362.00$0
Nov 2015038.792.17$0
Oct 2015043.552.43$0
Sep 2015042.992.76$0
Aug 2015040.162.87$0
Jul 2015048.152.95$0
Jun 2015056.152.88$0
May 2015055.212.96$0
Apr 20151149.822.71$30
Mar 20159442.892.93$276
Feb 2015044.662.98$0
Jan 2015043.433.10$0
Dec 2014054.693.59$0
Nov 2014070.464.25$0
Oct 2014778.303.90$27
Sep 20142186.164.05$85
Aug 20141789.394.04$69
Jul 20141096.564.18$42
Jun 20141598.164.74$71
May 20141894.734.73$85
Apr 20142095.944.81$96
Mar 20141895.895.06$91
Feb 20141397.406.19$81
Jan 20141590.404.86$73
Dec 20131791.824.35$74
Nov 20131888.853.74$67
Oct 20132197.423.78$79
Sep 201314104.113.72$52
Aug 20139104.253.52$32
Jul 201364102.523.72$238
Jun 20132294.403.93$87
May 201358294.834.15$2,415
Apr 201372793.964.28$3,113
Mar 201340093.623.91$1,565
Feb 2013091.233.42$0
Jan 2013091.603.42$0
Dec 2012086.773.42$0
Nov 2012086.953.62$0
Oct 2012189.383.40$3
Sep 20123394.672.92$96
Aug 20124092.662.91$116
Jul 20125085.133.02$151
Jun 20126079.822.52$151
May 20123391.612.49$82
Apr 201234101.652.00$68
Mar 201221105.052.22$47
Feb 201233101.102.57$85
Jan 20123598.092.73$96
Dec 20113196.873.24$100
Nov 20112895.723.31$93
Oct 20118384.983.65$303
Sep 2011883.623.99$32
Aug 20113483.404.15$141
Jul 20115494.144.52$244
Jun 201149792.904.64$2,306
May 2011098.134.40$0
Apr 201117105.964.33$74
Mar 2011096.364.06$0
Feb 2011085.644.18$0
Jan 2011086.504.59$0
Dec 2010085.734.35$0
Nov 2010080.843.80$0
Oct 20103778.103.51$130
Sep 201015872.633.98$629
Aug 201028573.684.42$1,260
Jul 201037972.554.74$1,795
Jun 201024770.364.91$1,213
May 201011671.124.24$491
Apr 201015781.694.12$647
Mar 20104478.394.39$193
Feb 20105873.585.44$316
Jan 2010674.365.96$36
Dec 200911871.445.48$647
Nov 200919674.593.75$735
Oct 20093172.544.11$127
Sep 20097365.543.06$224
Aug 20091467.423.22$45
Jul 2009061.133.46$0
Jun 2009066.163.90$0
May 2009054.743.93$0
Apr 2009046.773.59$0
Mar 200967342.144.06$2,732
Feb 2009032.814.63$0
Jan 2009035.865.37$0
Dec 2008037.105.98$0
Nov 20082955.496.86$199
Oct 200818575.246.92$1,281
Sep 2008144101.767.88$1,134
Aug 2008156114.228.48$1,323
Jul 2008166131.0811.39$1,891
Jun 2008168131.3313.03$2,189
May 2008168123.1711.57$1,944
Apr 2008169110.3110.45$1,767
Mar 2008169101.909.66$1,633
Feb 200818692.538.77$1,631
Jan 200836790.388.21$3,012
Dec 200715788.337.30$1,146
Nov 200725191.677.29$1,830
Oct 200775082.856.92$5,191
Sep 200796175.846.24$6,001
Aug 2007069.066.39$0
Jul 20079970.906.39$632
Jun 200732962.007.55$2,483
May 200746858.747.85$3,672
Apr 200765059.617.81$5,073
Mar 200771756.927.30$5,236
Feb 200772755.108.22$5,973
Jan 200791150.306.73$6,128
Dec 200662356.656.92$4,310
Nov 20061,93554.207.62$14,740
Oct 20061,32854.906.01$7,986
Sep 200698260.085.04$4,947
Aug 20064,14668.717.34$30,431
Jul 20062,08069.376.34$13,193
Jun 20062,93366.286.38$18,724
May 20063,83066.016.42$24,608
Apr 20063,05364.397.36$22,472
Mar 20064,91856.707.08$34,834
Feb 20065,22157.597.75$40,469
Jan 20063,61960.598.93$32,330
Dec 20052,61354.9413.42$35,054
Nov 20056,34754.6910.59$67,205
Oct 20051,36158.3413.80$18,776
Sep 20051,68061.4512.08$20,293
Aug 20052,89861.519.80$28,391
Jul 20052,90855.697.84$22,809
Jun 20053,54952.337.38$26,195
May 20051,31445.226.65$8,740
Apr 20053,19949.207.36$23,546
Mar 20053,20350.377.15$22,917
Feb 20053,51245.226.31$22,167
Jan 20054,17843.166.32$26,414
Dec 20044,32939.866.75$29,225
Nov 20045,21445.286.33$33,007
Oct 20045,61049.706.52$36,550
Sep 20045,91543.245.28$31,254
Aug 20044,10342.375.55$22,774
Jul 20045,41238.286.08$32,928
Jun 20045,08736.106.43$32,725
May 20044,26437.486.49$27,693
Apr 20045,27734.475.86$30,915
Mar 20044,77234.365.53$26,390
Feb 200410,37632.455.51$57,168
Jan 200410,01932.036.30$63,116
Dec 20039,36930.266.30$59,040
Nov 20036,19928.804.60$28,485
Oct 20039,31028.174.76$44,312
Sep 200310,29526.314.75$48,895
Aug 200313,79929.765.13$70,785
Jul 20038,59129.415.17$44,423
Jun 20039,69328.565.98$57,993
May 200311,21526.595.97$66,984
Apr 200316,11826.675.41$87,155
Mar 200319,81131.146.10$120,769
Feb 200320,50833.487.93$162,544
Jan 200328,57830.315.58$159,524
Dec 200235,91626.914.85$174,328
Nov 200221,62824.664.14$89,474

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2015 — as filed, then multipliedworked
Gas                   11 Mcf  × $  2.71 =        $30

────────────────────────────────────────────────────
Month total                                      $30

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/193294 is the state's own key, not one this site invented.