BRADLEY -C-

Operated by STRAT LAND EXPLORATION COMPANY (P-5 825420) in the MAMMOTH CREEK, NORTH (CLEVELAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 199130District 10Field 57021250CondensateGasSaveExport
Value, all time
$389 k
Dec 2003 – Jul 2010
Value, last 12 filed months
$28 k
at the published price for each month
Months reported
80
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 50 leases and 55 wells, and the rule below applies to all of them.

Discovered
1961-06-26
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2007-10-15.

The Commission's schedule remark for this field reads: (CLEVELAND) FIELD.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,760 bbl$109,467
GasProduction40,915 Mcf$279,699
Total$389,166

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.3300, -100.1751. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.33000, -100.17514 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
7,750 ft
1 wells filed one
Completion to plug
6.6 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,750 ft.

Completions filed
Dec 2003
1 of 1 wells
Plug dates filed
Jul 2010
1 of 1 wells

Last completion to plug: a median of 6.6 years across the 1 well that filed both dates, with the middle half between 6.6 years and 6.6 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2953269058717,750 ftDec 2003Jul 2010Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (80)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

80 months

Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 201010117078.394.39$8,663
Feb 2010033373.585.44$1,812
Jan 2010048974.365.96$2,916
Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 200919338167.423.22$14,238
Jul 2009044461.133.46$1,538
Jun 2009036466.163.90$1,418
May 2009041454.743.93$1,625
Apr 2009041046.773.59$1,471
Mar 2009049342.144.06$2,001
Feb 2009029032.814.63$1,344
Jan 2009035235.865.37$1,891
Dec 2008025337.105.98$1,512
Nov 2008054255.496.86$3,718
Oct 2008041275.246.92$2,852
Sep 20080334101.767.88$2,631
Aug 20080448114.228.48$3,800
Jul 2008191430131.0811.39$29,934
Jun 20080455131.3313.03$5,930
May 20080446123.1711.57$5,162
Apr 20080445110.3110.45$4,652
Mar 20080444101.909.66$4,291
Feb 2008043292.538.77$3,789
Jan 2008051090.388.21$4,185
Dec 2007040688.337.30$2,965
Nov 2007047791.677.29$3,478
Oct 2007049882.856.92$3,447
Sep 2007052975.846.24$3,303
Aug 2007049669.066.39$3,168
Jul 2007048570.906.39$3,098
Jun 200718343762.007.55$14,645
May 2007048358.747.85$3,790
Apr 2007047959.617.81$3,739
Mar 2007054156.927.30$3,950
Feb 2007030755.108.22$2,522
Jan 2007051150.306.73$3,437
Dec 2006054656.656.92$3,777
Nov 2006052254.207.62$3,976
Oct 2006051654.906.01$3,103
Sep 2006052460.085.04$2,639
Aug 2006035368.717.34$2,591
Jul 2006032069.376.34$2,030
Jun 200617730066.286.38$13,647
May 2006030266.016.42$1,940
Apr 2006037064.397.36$2,723
Mar 2006027756.707.08$1,962
Feb 2006024257.597.75$1,876
Jan 2006029660.598.93$2,644
Dec 2005022554.9413.42$3,018
Nov 2005040254.6910.59$4,257
Oct 200519026158.3413.80$14,685
Sep 2005044361.4512.08$5,351
Aug 2005049861.519.80$4,879
Jul 2005051255.697.84$4,016
Jun 2005051952.337.38$3,831
May 2005054545.226.65$3,625
Apr 2005058149.207.36$4,276
Mar 200517754050.377.15$12,779
Feb 2005069345.226.31$4,374
Jan 2005049543.166.32$3,129
Dec 2004040839.866.75$2,754
Nov 200418367245.286.33$12,540
Oct 2004066149.706.52$4,306
Sep 200401,09343.245.28$5,775
Aug 2004047342.375.55$2,625
Jul 2004064138.286.08$3,900
Jun 2004085736.106.43$5,513
May 200401,18237.486.49$7,677
Apr 20041831,33034.475.86$14,100
Mar 200401,65234.365.53$9,136
Feb 200401,77132.455.51$9,758
Jan 20041823,81532.036.30$29,863
Dec 200301,13830.266.30$7,171

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2010 — as filed, then multipliedworked
Condensate           101 bbl  × $ 78.39 =     $7,917
Gas                  170 Mcf  × $  4.39 =       $746

────────────────────────────────────────────────────
Month total                                   $8,663

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/199130 is the state's own key, not one this site invented.