Operated by LATIGO PETROLEUM, LLC (P-5 488260) in the HIGGINS, SOUTH (MORROW) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 199370District 10Field 411073002 tax incentive programmesCondensateGasSaveExport
Value, all time
$8.0 M
Jan 2004 – May 2026
Value, last 12 filed months
$8 k
at the published price for each month
Months reported
269
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 66 leases and 66 wells, and the rule below applies to all of them.

Discovered
1960-12-03
as the register files it
Field class
Gas
the register's own label
Between wells
3,735 ft
minimum
From a lease line
1,867 ft
minimum

A drilling unit in this field needs at least 640 acres.

The Commission's schedule remark for this field reads: ALLOCATION FORMULA SUSPENDED EFF. 4/1/93

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112004-04-22156634
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,282 bbl$90,458
GasProduction1,416,152 Mcf$7,897,799
Total$7,988,256

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.0951, -100.0737. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.09507, -100.07366 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
12,250 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 12,250 ft.

Completions filed
Jan 2004
1 of 1 wells

1 well

42-29532692317312,250 ftJan 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (269)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

269 months

May 20260170106.413.05$518
Apr 2026018698.932.87$534
Mar 20260089.753.15$0
Feb 2026020463.503.75$765
Jan 2026020859.138.00$1,664
Dec 2025013156.664.41$578
Nov 2025013058.593.93$510
Oct 2025014859.383.30$489
Sep 2025015062.743.08$462
Aug 2025016063.933.01$482
Jul 2025015566.743.32$514
Jun 2025033766.483.13$1,054
May 2025039760.553.23$1,283
Apr 2025034162.363.54$1,208
Mar 2025040167.704.27$1,712
Feb 20250070.884.34$0
Jan 2025046774.324.28$1,998
Dec 20240368.993.12$9
Nov 2024057669.052.20$1,266
Oct 2024047971.372.28$1,093
Sep 2024050869.612.36$1,201
Aug 2024059575.632.06$1,228
Jul 2024075079.932.15$1,610
Jun 2024040578.082.63$1,067
May 2024059878.812.20$1,315
Apr 2024048384.451.66$801
Mar 2024057980.301.55$895
Feb 2024027376.091.78$487
Jan 2024056173.023.30$1,850
Dec 2023033471.262.61$872
Nov 2023030077.892.81$842
Oct 2023032785.443.09$1,010
Sep 2023031289.042.74$853
Aug 20230080.522.67$0
Jul 2023044374.852.64$1,170
Jun 2023044368.962.26$1,001
May 2023048070.622.23$1,069
Apr 2023043878.122.24$980
Mar 202302,63072.852.39$6,294
Feb 20230075.112.47$0
Jan 202307676.533.39$257
Dec 2022041076.415.73$2,349
Nov 2022044385.005.65$2,501
Oct 2022048487.185.86$2,838
Sep 202201,51784.888.16$12,384
Aug 202202,41894.529.13$22,069
Jul 2022832,110101.587.54$24,345
Jun 202201,435115.097.98$11,447
May 202202,421109.378.43$20,416
Apr 202202,399104.226.84$16,403
Mar 202202,680108.885.08$13,605
Feb 202201,90091.054.86$9,232
Jan 202202,16081.844.54$9,801
Dec 202102,05471.323.90$8,009
Nov 202102,35777.435.24$12,343
Oct 202102,45479.795.71$14,022
Sep 2021542,25769.865.35$15,849
Aug 202102,38666.024.22$10,070
Jul 202102,57770.783.98$10,262
Jun 202102,10969.493.38$7,130
May 20211372,41963.483.02$15,997
Apr 202101,29760.362.76$3,578
Mar 202102,01461.302.72$5,472
Feb 202101,42057.805.55$7,878
Jan 202102,47450.412.81$6,953
Dec 202002,69744.642.68$7,216
Nov 202002,64138.772.71$7,148
Oct 202002,79136.972.48$6,917
Sep 202002,65737.091.99$5,290
Aug 202002,75339.982.39$6,566
Jul 202002,74238.371.83$5,004
Jun 202002,68534.901.69$4,538
May 202002,76616.921.81$5,020
Apr 202002,75414.751.80$4,969
Mar 202002,86830.341.86$5,324
Feb 202002,78649.881.98$5,518
Jan 202002,83157.252.09$5,930
Dec 201902,79959.012.30$6,450
Nov 20191651,02555.302.75$11,944
Oct 201903,05453.472.42$7,386
Sep 201902,66455.052.66$7,079
Aug 201903,43253.112.30$7,909
Jul 201903,80156.272.46$9,351
Jun 201903,11952.782.49$7,770
May 201903,08558.482.74$8,454
Apr 201902,71462.632.75$7,465
Mar 201903,13056.803.06$9,584
Feb 201902,68150.852.79$7,486
Jan 201903,02246.033.23$9,756
Dec 201803,27446.594.19$13,703
Nov 20181662,80652.934.24$20,676
Oct 201803,37061.443.40$11,452
Sep 201803,14659.543.11$9,778
Aug 201803,14859.403.07$9,654
Jul 201803,82065.142.93$11,200
Jun 2018502,49660.183.08$10,689
May 201804,01965.382.90$11,658
Apr 201802,46463.842.90$7,148
Mar 201803,49161.222.79$9,729
Feb 201802,55261.782.77$7,059
Jan 201804,16362.874.01$16,691
Dec 201703,55257.272.92$10,377
Nov 201704,00855.423.12$12,498
Oct 201704,89049.292.98$14,590
Sep 201704,89547.523.09$15,112
Aug 201705,35945.373.00$16,101
Jul 20171342,24943.873.09$12,822
Jun 201704,14342.493.09$12,791
May 201705,92045.373.26$19,319
Apr 201703,57747.933.21$11,488
Mar 201701,41946.772.98$4,234
Feb 201705,12350.452.95$15,126
Jan 201702,39949.413.42$8,202
Dec 201601,87448.763.72$6,977
Nov 201602,24042.492.64$5,923
Oct 201602,38746.193.09$7,376
Sep 201603,40541.553.10$10,558
Aug 201603,32041.442.92$9,709
Jul 201602,74241.622.92$8,019
Jun 201603,05645.352.69$8,208
May 201603,29842.521.99$6,566
Apr 201603,45536.561.99$6,879
Mar 201603,40733.011.79$6,112
Feb 201603,68526.472.06$7,604
Jan 201603,67727.352.36$8,694
Dec 201503,12632.362.00$6,256
Nov 201503,63938.792.17$7,887
Oct 201504,43843.552.43$10,769
Sep 201504,76942.992.76$13,155
Aug 201504,44440.162.87$12,765
Jul 20151044,15148.152.95$17,233
Jun 201504,16556.152.88$12,007
May 201503,63355.212.96$10,737
Apr 201503,72349.822.71$10,077
Mar 201504,59642.892.93$13,488
Feb 201503,96744.662.98$11,807
Jan 201505,03843.433.10$15,621
Dec 201404,52554.693.59$16,251
Nov 201403,58170.464.25$15,226
Oct 201405,10378.303.90$19,907
Sep 201404,14286.164.05$16,756
Aug 2014484,30089.394.04$21,642
Jul 201403,53196.564.18$14,758
Jun 201403,99798.164.74$18,933
May 201404,46294.734.73$21,090
Apr 201403,73095.944.81$17,938
Mar 201404,80695.895.06$24,303
Feb 201403,87397.406.19$23,982
Jan 201405,20590.404.86$25,300
Dec 201304,24191.824.35$18,467
Nov 201303,71588.853.74$13,888
Oct 201301,98797.423.78$7,510
Sep 201304,222104.113.72$15,696
Aug 201304,816104.253.52$16,965
Jul 201304,663102.523.72$17,336
Jun 201304,13194.403.93$16,249
May 201303,36094.834.15$13,941
Apr 201303,92693.964.28$16,813
Mar 201305,47693.623.91$21,427
Feb 201305,47791.233.42$18,731
Jan 201306,14391.603.42$21,009
Dec 2012588,14986.773.42$32,904
Nov 201204,99786.953.62$18,114
Oct 201204,57589.383.40$15,554
Sep 201205,12194.672.92$14,945
Aug 201205,19692.662.91$15,111
Jul 201205,53685.133.02$16,723
Jun 201205,28279.822.52$13,306
May 201203,52191.612.49$8,761
Apr 201202,783101.652.00$5,557
Mar 201204,643105.052.22$10,317
Feb 201202,937101.102.57$7,549
Jan 201204,01698.092.73$10,980
Dec 201103,79596.873.24$12,295
Nov 201105,35995.723.31$17,745
Oct 201104,25784.983.65$15,532
Sep 201104,16083.623.99$16,581
Aug 201105,37283.404.15$22,290
Jul 201103,76794.144.52$17,016
Jun 201104,85792.904.64$22,536
May 20111025,20898.134.40$32,950
Apr 201105,261105.964.33$22,797
Mar 201105,03596.364.06$20,429
Feb 201103,94785.644.18$16,498
Jan 201104,62286.504.59$21,209
Dec 201005,63685.734.35$24,504
Nov 201005,32980.843.80$20,225
Oct 201006,01678.103.51$21,109
Sep 201005,87372.633.98$23,371
Aug 201006,22273.684.42$27,497
Jul 201006,14172.554.74$29,087
Jun 201005,10870.364.91$25,082
May 201005,82671.124.24$24,674
Apr 201006,32781.694.12$26,084
Mar 201007,33678.394.39$32,195
Feb 201005,40273.585.44$29,400
Jan 201006,21374.365.96$37,055
Dec 200907,20171.445.48$39,488
Nov 200906,63574.593.75$24,891
Oct 200906,27172.544.11$25,775
Sep 200905,23765.543.06$16,050
Aug 200905,65567.423.22$18,201
Jul 200903,33361.133.46$11,547
Jun 200904,32366.163.90$16,838
May 200906,58054.743.93$25,831
Apr 200905,82646.773.59$20,901
Mar 200906,78442.144.06$27,536
Feb 200901,53332.814.63$7,102
Jan 200903,45135.865.37$18,535
Dec 200801,63837.105.98$9,791
Nov 2008066955.496.86$4,590
Oct 200801,02375.246.92$7,081
Sep 200818145101.767.88$18,773
Aug 200802,424114.228.48$20,563
Jul 200805,034131.0811.39$57,334
Jun 200808,606131.3313.03$112,159
May 200808,430123.1711.57$97,571
Apr 200805,484110.3110.45$57,334
Mar 200808,842101.909.66$85,450
Feb 200805,53392.538.77$48,528
Jan 200809,09390.388.21$74,615
Dec 200706,47488.337.30$47,273
Nov 200705,29191.677.29$38,580
Oct 200706,23682.856.92$43,165
Sep 200707,72975.846.24$48,261
Aug 200709,39669.066.39$60,021
Jul 2007012,46370.906.39$79,613
Jun 200703,09762.007.55$23,378
May 200707,41358.747.85$58,164
Apr 2007010,02359.617.81$78,232
Mar 200707,26756.927.30$53,063
Feb 2007010,26955.108.22$84,370
Jan 200708,78350.306.73$59,082
Dec 2006010,90056.656.92$75,411
Nov 200609,69654.207.62$73,859
Oct 2006012,20754.906.01$73,410
Sep 2006010,14860.085.04$51,118
Aug 200605,26068.717.34$38,608
Jul 2006010,41669.376.34$66,066
Jun 2006010,83366.286.38$69,157
May 2006011,65566.016.42$74,883
Apr 2006010,91364.397.36$80,325
Mar 2006011,74656.707.08$83,196
Feb 2006011,43157.597.75$88,603
Jan 2006012,60060.598.93$112,560
Dec 2005014,57054.9413.42$195,462
Nov 2005012,63354.6910.59$133,763
Oct 2005013,27758.3413.80$183,166
Sep 2005014,91461.4512.08$180,146
Aug 2005013,46261.519.80$131,885
Jul 2005015,99855.697.84$125,483
Jun 2005011,63652.337.38$85,886
May 2005016,52645.226.65$109,917
Apr 2005013,68349.207.36$100,713
Mar 2005016,53950.377.15$118,335
Feb 2005015,61745.226.31$98,573
Jan 2005017,96443.166.32$113,572
Dec 2004017,66739.866.75$119,271
Nov 2004018,70145.286.33$118,385
Oct 2004020,38149.706.52$132,784
Sep 2004020,58243.245.28$108,753
Aug 2004022,93942.375.55$127,327
Jul 2004023,12238.286.08$140,678
Jun 2004025,54236.106.43$164,312
May 2004029,07237.486.49$188,810
Apr 2004031,63634.475.86$185,338
Mar 2004040,30134.365.53$222,870
Feb 2004050,00732.455.51$275,520
Jan 200408,86232.036.30$55,827

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  170 Mcf  × $  3.05 =       $518

────────────────────────────────────────────────────
Month total                                     $518

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/199370 is the state's own key, not one this site invented.