Operated by EQV OPERATING LLC (P-5 101634) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 207170District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.4 M
Nov 2004 – May 2024
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
235
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-08-19160681
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition4,561 bbl$268,838
GasProduction457,946 Mcf$3,146,387
Total$3,415,225

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6711, -100.3249. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.67110, -100.32491 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
11,900 ft
1 wells filed one
Completion to plug
14.6 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,900 ft.

Completions filed
Nov 2004
1 of 1 wells
Plug dates filed
Jun 2019
1 of 1 wells

Last completion to plug: a median of 14.6 years across the 1 well that filed both dates, with the middle half between 14.6 years and 14.6 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-211330655521P11,900 ftNov 2004Jun 2019Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (235)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

235 months

May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 202323085.443.09$1,965
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 2013166294.403.93$15,678
May 2013276794.834.15$3,372
Apr 201331,59393.964.28$7,104
Mar 201311,60893.623.91$6,386
Feb 201311,42291.233.42$4,954
Jan 201301,53891.603.42$5,260
Dec 201201,65286.773.42$5,650
Nov 201201,70286.953.62$6,170
Oct 201211,76489.383.40$6,086
Sep 2012221,58994.672.92$6,720
Aug 201211,73092.662.91$5,124
Jul 201251,73485.133.02$5,664
Jun 201231,72879.822.52$4,592
May 201231,80191.612.49$4,756
Apr 201201,761101.652.00$3,516
Mar 20123700105.052.22$1,871
Feb 201201,409101.102.57$3,621
Jan 201201,70398.092.73$4,656
Dec 201101,75496.873.24$5,683
Nov 201101,54095.723.31$5,099
Oct 20111091,94184.983.65$16,345
Sep 201101,76383.623.99$7,027
Aug 201101,55083.404.15$6,431
Jul 201101,85294.144.52$8,366
Jun 201101,90492.904.64$8,834
May 201102,03398.134.40$8,955
Apr 201101,936105.964.33$8,389
Mar 201101,58296.364.06$6,419
Feb 201101,20085.644.18$5,016
Jan 20111531,65486.504.59$20,824
Dec 201002,00985.734.35$8,735
Nov 201002,16480.843.80$8,213
Oct 201002,15278.103.51$7,551
Sep 201002,10572.633.98$8,377
Aug 201002,05573.684.42$9,082
Jul 201002,21972.554.74$10,510
Jun 201002,26070.364.91$11,098
May 201002,39171.124.24$10,126
Apr 201002,33581.694.12$9,626
Mar 201002,47678.394.39$10,866
Feb 201002,18973.585.44$11,913
Jan 201002,37874.365.96$14,183
Dec 200902,66871.445.48$14,631
Nov 200902,56274.593.75$9,611
Oct 200902,68172.544.11$11,020
Sep 200902,61765.543.06$8,020
Aug 20091652,82667.423.22$20,220
Jul 200902,90261.133.46$10,054
Jun 200902,84466.163.90$11,077
May 200902,95154.743.93$11,585
Apr 200902,86546.773.59$10,278
Mar 200902,70542.144.06$10,980
Feb 200902,50932.814.63$11,624
Jan 200902,84935.865.37$15,302
Dec 20081653,06237.105.98$24,424
Nov 200803,00255.496.86$20,595
Oct 200803,29775.246.92$22,822
Sep 200803,250101.767.88$25,601
Aug 200803,467114.228.48$29,411
Jul 200803,513131.0811.39$40,011
Jun 200803,339131.3313.03$43,516
May 20081733,556123.1711.57$62,467
Apr 200803,436110.3110.45$35,923
Mar 200803,581101.909.66$34,607
Feb 200803,17292.538.77$27,820
Jan 20081353,42590.388.21$40,306
Dec 200703,45988.337.30$25,258
Nov 200703,66891.677.29$26,746
Oct 200703,78282.856.92$26,179
Sep 200703,97075.846.24$24,789
Aug 200704,17469.066.39$26,663
Jul 20071664,21670.906.39$38,701
Jun 200703,80162.007.55$28,692
May 200704,51158.747.85$35,395
Apr 20071674,30759.617.81$43,572
Mar 200704,44956.927.30$32,486
Feb 200703,98255.108.22$32,716
Jan 200705,11550.306.73$34,408
Dec 200605,13556.656.92$35,526
Nov 200605,05454.207.62$38,499
Oct 200605,46954.906.01$32,889
Sep 200605,47860.085.04$27,594
Aug 20061815,66768.717.34$54,032
Jul 200605,64869.376.34$35,824
Jun 200605,74566.286.38$36,675
May 200606,03266.016.42$38,756
Apr 200606,05964.397.36$44,597
Mar 200606,29356.707.08$44,573
Feb 200605,78357.597.75$44,825
Jan 200607,25160.598.93$64,776
Dec 20051866,74754.9413.42$100,733
Nov 20051807,32554.6910.59$87,404
Oct 200508,65758.3413.80$119,430
Sep 20051759,09061.4512.08$120,552
Aug 20051819,43361.519.80$103,547
Jul 200509,66155.697.84$75,777
Jun 200519010,11152.337.38$84,572
May 200517311,57645.226.65$84,817
Apr 200534512,23049.207.36$106,993
Mar 200517414,73550.377.15$114,192
Feb 2005015,60345.226.31$98,485
Jan 200559423,69443.166.32$175,435
Dec 200471148,47739.866.75$355,613
Nov 200444,83545.286.33$30,789

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2023 — as filed, then multipliedworked
Condensate            23 bbl  × $ 85.44 =     $1,965
Gas                    0 Mcf  × $  3.09 =         $0

────────────────────────────────────────────────────
Month total                                   $1,965

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/207170 is the state's own key, not one this site invented.