SLAUGHTER 1-26

Operated by COURSON OIL & GAS, INC. (P-5 182785) in the PERRYTON (ST. LOUIS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 209743District 10Field 70743900CondensateGasSaveExport
Value, all time
$594 k
Jun 2005 – Dec 2011
Value, last 12 filed months
$16 k
at the published price for each month
Months reported
79
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 7 leases and 7 wells, and the rule below applies to all of them.

Discovered
1981-09-02
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: ALLOCATION FORMULA EFFECTIVE 09/01/2006.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition4,381 bbl$296,310
GasProduction37,905 Mcf$297,211
Total$593,521

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.4096, -100.8309. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.40961, -100.83090 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,100 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,100 ft.

Completions filed
Dec 2011
1 of 1 wells

1 well

42-3573245919,100 ftDec 2011Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (79)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

79 months

Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 20110137105.964.33$594
Mar 2011029696.364.06$1,201
Feb 201113822985.644.18$12,776
Jan 2011024186.504.59$1,106
Dec 2010026885.734.35$1,165
Nov 2010031480.843.80$1,192
Oct 20101767578.103.51$14,009
Sep 20100572.633.98$20
Aug 201001073.684.42$44
Jul 20101788472.554.74$13,312
Jun 2010013370.364.91$653
May 2010016271.124.24$686
Apr 201009381.694.12$383
Mar 20100078.394.39$0
Feb 201019910473.585.44$15,208
Jan 2010036074.365.96$2,147
Dec 2009012271.445.48$669
Nov 2009014774.593.75$551
Oct 2009017072.544.11$699
Sep 200919628865.543.06$13,728
Aug 2009019967.423.22$640
Jul 2009032361.133.46$1,119
Jun 2009026966.163.90$1,048
May 200919534554.743.93$12,029
Apr 2009038146.773.59$1,367
Mar 2009035042.144.06$1,421
Feb 200919741932.814.63$8,405
Jan 2009056135.865.37$3,013
Dec 2008028637.105.98$1,709
Nov 2008035755.496.86$2,449
Oct 2008057375.246.92$3,966
Sep 20080585101.767.88$4,608
Aug 20080427114.228.48$3,622
Jul 2008185461131.0811.39$29,500
Jun 20080433131.3313.03$5,643
May 20080498123.1711.57$5,764
Apr 20080543110.3110.45$5,677
Mar 2008182597101.909.66$24,315
Feb 2008057392.538.77$5,026
Jan 200817560690.388.21$20,789
Dec 2007055588.337.30$4,053
Nov 2007088291.677.29$6,431
Oct 2007093582.856.92$6,472
Sep 2007096075.846.24$5,994
Aug 20071621,02269.066.39$17,716
Jul 200701,01970.906.39$6,509
Jun 200718690162.007.55$18,333
May 200701,04558.747.85$8,199
Apr 20071781,03259.617.81$18,666
Mar 200701,10756.927.30$8,083
Feb 200719731955.108.22$13,476
Jan 200707750.306.73$518
Dec 20061907756.656.92$11,296
Nov 200605054.207.62$381
Oct 2006033354.906.01$2,003
Sep 200617440460.085.04$12,489
Aug 200618549568.717.34$16,345
Jul 2006054869.376.34$3,476
Jun 200619150266.286.38$15,864
May 200601,12366.016.42$7,215
Apr 20061821,09164.397.36$19,749
Mar 200601,09256.707.08$7,735
Feb 20061591,02257.597.75$17,078
Jan 200601,42460.598.93$12,721
Dec 200501,42454.9413.42$19,104
Nov 200518196954.6910.59$20,159
Oct 200519384358.3413.80$22,889
Sep 20051971,48261.4512.08$30,007
Aug 200502,16761.519.80$21,230
Jul 2005033355.697.84$2,612
Jun 200518564852.337.38$14,464

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2011 — as filed, then multipliedworked
Condensate             0 bbl  × $105.96 =         $0
Gas                  137 Mcf  × $  4.33 =       $594

────────────────────────────────────────────────────
Month total                                     $594

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/209743 is the state's own key, not one this site invented.