FRYE

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the FRYE RANCH (CONSOLIDATED) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 210593District 10Field 331512002 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.6 M
Dec 2004 – Aug 2023
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
225
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 199 leases and 218 wells, and the rule below applies to all of them.

Discovered
2007-10-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2014-02-04.

The Commission's schedule remark for this field reads: NO BETWEEN WELL SPACING.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-03-20167688
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition12,675 bbl$709,252
GasProduction404,354 Mcf$2,858,411
Total$3,567,663

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.4712, -100.1627. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.47115, -100.16273 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
14,628 ft
1 wells filed one
Completion to plug
18.7 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 14,628 ft.

Completions filed
Dec 2004
1 of 1 wells
Plug dates filed
Aug 2023
1 of 1 wells

Last completion to plug: a median of 18.7 years across the 1 well that filed both dates, with the middle half between 18.7 years and 18.7 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-48331771101214,628 ftDec 2004Aug 2023Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (225)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

225 months

Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20232072.852.39$146
Feb 20235075.112.47$376
Jan 20235076.533.39$383
Dec 20225076.415.73$382
Nov 20225085.005.65$425
Oct 20225087.185.86$436
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 2020143038.772.71$5,544
Oct 20200036.972.48$0
Sep 20200137.091.99$2
Aug 202005539.982.39$131
Jul 202003238.371.83$58
Jun 202008334.901.69$140
May 202007516.921.81$136
Apr 2020010914.751.80$197
Mar 2020014030.341.86$260
Feb 2020020749.881.98$410
Jan 2020021157.252.09$442
Dec 2019023859.012.30$548
Nov 2019028255.302.75$776
Oct 2019032353.472.42$781
Sep 2019037555.052.66$996
Aug 2019042353.112.30$975
Jul 2019051556.272.46$1,267
Jun 2019053952.782.49$1,343
May 2019034958.482.74$956
Apr 201906962.632.75$190
Mar 20191612956.803.06$1,304
Feb 2019014150.852.79$394
Jan 2019174446.033.23$925
Dec 20182512346.594.19$1,680
Nov 201803052.934.24$127
Oct 20182135461.443.40$13,270
Sep 2018026959.543.11$836
Aug 2018646959.403.07$1,795
Jul 2018764965.142.93$2,359
Jun 2018740660.183.08$1,670
May 2018593965.382.90$3,051
Apr 2018067863.842.90$1,967
Mar 20181374861.222.79$2,880
Feb 2018751161.782.77$1,846
Jan 201821828162.874.01$14,832
Dec 20171956157.272.92$2,727
Nov 2017049555.423.12$1,544
Oct 20171140749.292.98$1,757
Sep 201719770847.523.09$11,547
Aug 20171367145.373.00$2,606
Jul 20171063643.873.09$2,402
Jun 20172966442.493.09$3,282
May 20172358645.373.26$2,956
Apr 20171384847.933.21$3,347
Mar 2017089346.772.98$2,664
Feb 201723889550.452.95$14,650
Jan 20171392049.413.42$3,788
Dec 20164199148.763.72$5,688
Nov 2016311,24442.492.64$4,607
Oct 20162191,43146.193.09$14,538
Sep 2016191,42641.553.10$5,211
Aug 20163690341.442.92$4,133
Jul 20164011041.622.92$1,986
Jun 201602045.352.69$54
May 201605142.521.99$102
Apr 201605536.561.99$110
Mar 201606133.011.79$109
Feb 20161915726.472.06$5,173
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120986.773.42$31
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120292.662.91$6
Jul 20120085.133.02$0
Jun 2012634079.822.52$5,129
May 20120091.612.49$0
Apr 2012048101.652.00$96
Mar 2012056105.052.22$124
Feb 201200101.102.57$0
Jan 20120298.092.73$5
Dec 20110496.873.24$13
Nov 201103395.723.31$109
Oct 20110484.983.65$15
Sep 201164383.623.99$5,364
Aug 201111483.404.15$141
Jul 201101694.144.52$72
Jun 20110092.904.64$0
May 201101398.134.40$57
Apr 201100105.964.33$0
Mar 2011020396.364.06$824
Feb 2011015185.644.18$631
Jan 2011024986.504.59$1,143
Dec 2010037285.734.35$1,617
Nov 2010039780.843.80$1,507
Oct 2010033678.103.51$1,179
Sep 2010034572.633.98$1,373
Aug 2010030173.684.42$1,330
Jul 2010126172.554.74$1,309
Jun 2010161,65470.364.91$9,248
May 20101134,72871.124.24$28,061
Apr 201059124,48781.694.12$149,231
Mar 201093,03878.394.39$14,038
Feb 201002973.585.44$158
Jan 2010022874.365.96$1,360
Dec 2009029671.445.48$1,623
Nov 2009425074.593.75$1,236
Oct 2009028072.544.11$1,151
Sep 2009031265.543.06$956
Aug 2009030367.423.22$975
Jul 2009025461.133.46$880
Jun 2009127766.163.90$1,145
May 2009027254.743.93$1,068
Apr 2009034546.773.59$1,238
Mar 2009045842.144.06$1,859
Feb 2009042632.814.63$1,974
Jan 200917872735.865.37$10,288
Dec 2008287137.105.98$5,280
Nov 2008289855.496.86$6,272
Oct 200831,64775.246.92$11,626
Sep 20081891,861101.767.88$33,892
Aug 200872,075114.228.48$18,402
Jul 20081901,871131.0811.39$46,215
Jun 200871,896131.3313.03$25,629
May 200821,591123.1711.57$18,661
Apr 200851,933110.3110.45$20,761
Mar 20080899101.909.66$8,688
Feb 200871,43292.538.77$13,207
Jan 200821,38490.388.21$11,537
Dec 200731,70888.337.30$12,737
Nov 200732,10291.677.29$15,602
Oct 200762,20382.856.92$15,746
Sep 20072032,93775.846.24$33,735
Aug 2007192,68369.066.39$18,451
Jul 2007212,70670.906.39$18,775
Jun 2007252,67862.007.55$21,765
May 2007123,09558.747.85$24,989
Apr 200792,72259.617.81$21,782
Mar 2007232,55056.927.30$19,929
Feb 2007103,03755.108.22$25,503
Jan 20071953,56050.306.73$33,756
Dec 2006163,12256.656.92$22,506
Nov 20062153,11054.207.62$35,343
Oct 20061993,08054.906.01$29,448
Sep 20061932,54160.085.04$24,395
Aug 200615,55768.717.34$40,857
Jul 20062027,63669.376.34$62,446
Jun 20061968,10366.286.38$64,719
May 20062167,35866.016.42$61,533
Apr 20062086,90164.397.36$64,188
Mar 20061857,44056.707.08$63,186
Feb 20063775,95557.597.75$67,869
Jan 20061827,84460.598.93$81,100
Dec 20052036,72654.9413.42$101,385
Nov 20051938,82054.6910.59$103,945
Oct 20051939,82658.3413.80$146,817
Sep 20053839,52861.4512.08$138,624
Aug 200538111,09461.519.80$132,121
Jul 200518411,92655.697.84$103,790
Jun 200574912,25252.337.38$129,628
May 200527915,37445.226.65$114,871
Apr 200556519,64349.207.36$172,380
Mar 200589524,07950.377.15$217,364
Feb 200590826,61545.226.31$209,052
Jan 20051,39943,64443.166.32$336,307
Dec 200432020,48839.866.75$151,071

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2023 — as filed, then multipliedworked
Condensate             2 bbl  × $ 72.85 =       $146
Gas                    0 Mcf  × $  2.39 =         $0

────────────────────────────────────────────────────
Month total                                     $146

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/210593 is the state's own key, not one this site invented.