HELTON

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 211393District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.0 M
Apr 2005 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
254
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-03-09167408
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition8,585 bbl$507,280
GasProduction190,438 Mcf$1,516,771
Total$2,024,051

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6061, -100.3421. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.60611, -100.34212 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
13,904 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,904 ft.

Completions filed
Apr 2005
1 of 1 wells

1 well

42-48331778306013,904 ftApr 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (254)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

254 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20191162.632.75$65
Mar 20190056.803.06$0
Feb 201925050.852.79$1,271
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 2018120059.543.11$7,145
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 201607546.193.09$232
Sep 201606041.553.10$186
Aug 201605741.442.92$167
Jul 20160041.622.92$0
Jun 2016113645.352.69$411
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 2016117033.011.79$3,862
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 201502440.162.87$69
Jul 20150048.152.95$0
Jun 201501056.152.88$29
May 201502155.212.96$62
Apr 2015216149.822.71$535
Mar 201519147542.892.93$9,586
Feb 201518615744.662.98$8,774
Jan 2015412,10243.433.10$8,298
Dec 2014020354.693.59$729
Nov 2014027070.464.25$1,148
Oct 2014446678.303.90$2,131
Sep 2014046186.164.05$1,865
Aug 2014063189.394.04$2,546
Jul 2014060596.564.18$2,529
Jun 2014056198.164.74$2,657
May 2014062494.734.73$2,949
Apr 20141711,00695.944.81$21,244
Mar 2014054595.895.06$2,756
Feb 201402797.406.19$167
Jan 2014023890.404.86$1,157
Dec 2013010391.824.35$449
Nov 201306088.853.74$224
Oct 201304397.423.78$163
Sep 2013059104.113.72$219
Aug 2013062104.253.52$218
Jul 201328122102.523.72$3,324
Jun 2013214594.403.93$759
May 20135615594.834.15$5,954
Apr 2013014393.964.28$612
Mar 2013016393.623.91$638
Feb 2013014291.233.42$486
Jan 20133914091.603.42$4,051
Dec 2012015686.773.42$534
Nov 2012016486.953.62$594
Oct 20124418689.383.40$4,565
Sep 201201194.672.92$32
Aug 2012013692.662.91$396
Jul 2012015485.133.02$465
Jun 2012229679.822.52$1,998
May 20124410291.612.49$4,285
Apr 20120105101.652.00$210
Mar 20121143105.052.22$423
Feb 20120135101.102.57$347
Jan 2012023698.092.73$645
Dec 20112814896.873.24$3,192
Nov 2011024895.723.31$821
Oct 20112023884.983.65$2,568
Sep 2011023383.623.99$929
Aug 2011011983.404.15$494
Jul 2011289094.144.52$3,042
Jun 2011225892.904.64$1,383
May 20113849998.134.40$5,927
Apr 201100105.964.33$0
Mar 20111611596.364.06$2,008
Feb 2011324285.644.18$1,268
Jan 201127186.504.59$499
Dec 20101637185.734.35$2,985
Nov 2010168680.843.80$1,620
Oct 2010021978.103.51$768
Sep 2010120972.633.98$904
Aug 20101313573.684.42$1,554
Jul 20101417972.554.74$1,864
Jun 2010010770.364.91$525
May 20101926571.124.24$2,474
Apr 20101536281.694.12$2,718
Mar 2010050778.394.39$2,225
Feb 20100073.585.44$0
Jan 20101410174.365.96$1,643
Dec 20092319771.445.48$2,723
Nov 20092631774.593.75$3,129
Oct 2009150572.544.11$2,148
Sep 20092256565.543.06$3,173
Aug 20091351167.423.22$2,521
Jul 2009539461.133.46$1,671
Jun 200968266.163.90$716
May 2009010954.743.93$428
Apr 2009615746.773.59$844
Mar 20091613642.144.06$1,226
Feb 2009925832.814.63$1,491
Jan 20091014835.865.37$1,154
Dec 2008521037.105.98$1,441
Nov 2008512555.496.86$1,135
Oct 2008620275.246.92$1,850
Sep 20089332101.767.88$3,531
Aug 200813611114.228.48$6,668
Jul 200817422131.0811.39$7,035
Jun 200850472131.3313.03$12,718
May 200813819123.1711.57$11,081
Apr 200849881110.3110.45$14,616
Mar 200856978101.909.66$15,158
Feb 2008111,03992.538.77$10,130
Jan 2008601,74690.388.21$19,750
Dec 2007111,71288.337.30$13,473
Nov 2007421,09991.677.29$11,864
Oct 20074725582.856.92$5,659
Sep 2007521,48775.846.24$13,229
Aug 200751,49169.066.39$9,870
Jul 2007401,43570.906.39$12,003
Jun 2007151,18062.007.55$9,837
May 200771,07558.747.85$8,846
Apr 2007361,07359.617.81$10,521
Mar 20072701,45756.927.30$26,007
Feb 2007531,82955.108.22$17,947
Jan 20071011,75750.306.73$16,899
Dec 2006592,04856.656.92$17,511
Nov 2006572,00354.207.62$18,347
Oct 2006421,93454.906.01$13,936
Sep 2006651,77860.085.04$12,861
Aug 2006731,77868.717.34$18,066
Jul 20061231,85169.376.34$20,273
Jun 20062042,23666.286.38$27,795
May 2006322,79966.016.42$20,096
Apr 2006492,92164.397.36$24,655
Mar 2006653,36956.707.08$27,548
Feb 20064383,57757.597.75$52,950
Jan 2006904,80760.598.93$48,396
Dec 2005807,26554.9413.42$101,858
Nov 20053607,29954.6910.59$96,973
Oct 20054228,74158.3413.80$145,208
Sep 20055508,54061.4512.08$136,952
Aug 200537110,06661.519.80$121,435
Jul 200534111,86955.697.84$112,086
Jun 200552814,93952.337.38$137,896
May 20051,08424,10945.226.65$209,371
Apr 20051,10222,76449.207.36$221,772

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2019 — as filed, then multipliedworked
Condensate             1 bbl  × $ 62.63 =        $63
Gas                    1 Mcf  × $  2.75 =         $3

────────────────────────────────────────────────────
Month total                                      $65

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/211393 is the state's own key, not one this site invented.