DILLMAN GW

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the MIAMI field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 213115District 10Field 60957500CondensateGasSaveExport
Value, all time
$3.5 M
Jul 2005 – May 2026
Value, last 12 filed months
$76 k
at the published price for each month
Months reported
251
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 5 leases and 5 wells, and the rule below applies to all of them.

Discovered
1983-12-15
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 12/01/2004.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition10,774 bbl$737,636
GasProduction461,800 Mcf$2,756,631
Total$3,494,267

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.7805, -100.4961. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.78046, -100.49607 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,215 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,215 ft.

Completions filed
Jul 2005
1 of 1 wells

1 well

42-21133315140211,215 ftJul 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (251)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

251 months

May 202600106.413.05$0
Apr 202601,22698.932.87$3,518
Mar 202601,24189.753.15$3,908
Feb 20261901,14863.503.75$16,370
Jan 202601,23159.138.00$9,845
Dec 202501,23456.664.41$5,446
Nov 202501,19458.593.93$4,688
Oct 202501,26659.383.30$4,184
Sep 202501,27362.743.08$3,917
Aug 202501,24663.933.01$3,756
Jul 20251881,24666.743.32$16,678
Jun 202501,03666.483.13$3,241
May 202501,22060.553.23$3,943
Apr 202501,17062.363.54$4,145
Mar 202501,19067.704.27$5,079
Feb 202501,06770.884.34$4,632
Jan 202501,15374.324.28$4,933
Dec 202401,30268.993.12$4,064
Nov 202401,15669.052.20$2,541
Oct 202401,23271.372.28$2,811
Sep 202401,16769.612.36$2,759
Aug 202401,28575.632.06$2,652
Jul 202401,22079.932.15$2,619
Jun 202401,19278.082.63$3,140
May 20242001,19878.812.20$18,396
Apr 202401,24384.451.66$2,062
Mar 202401,27480.301.55$1,969
Feb 202401,07976.091.78$1,925
Jan 202401,60673.023.30$5,296
Dec 202301,44471.262.61$3,770
Nov 202301,28077.892.81$3,594
Oct 202301,27485.443.09$3,933
Sep 202301,21089.042.74$3,309
Aug 202301,27880.522.67$3,416
Jul 202301,21174.852.64$3,199
Jun 202301,21468.962.26$2,742
May 202301,21570.622.23$2,706
Apr 202301,29478.122.24$2,896
Mar 202301,29472.852.39$3,097
Feb 202301,19075.112.47$2,934
Jan 20231841,15976.533.39$18,008
Dec 202201,09876.415.73$6,291
Nov 202201,28385.005.65$7,244
Oct 202201,18787.185.86$6,960
Sep 202201,06784.888.16$8,711
Aug 202201,20294.529.13$10,971
Jul 202201,101101.587.54$8,304
Jun 202201,141115.097.98$9,102
May 20221791,156109.378.43$29,326
Apr 202201,095104.226.84$7,487
Mar 202201,213108.885.08$6,158
Feb 202201,07791.054.86$5,233
Jan 202201,15681.844.54$5,246
Dec 202101,25171.323.90$4,878
Nov 202101,18277.435.24$6,190
Oct 202101,18079.795.71$6,742
Sep 202101,18169.865.35$6,319
Aug 202101,19366.024.22$5,035
Jul 202101,16470.783.98$4,635
Jun 202101,12569.493.38$3,803
May 202101,12963.483.02$3,407
Apr 202101,09760.362.76$3,026
Mar 202101,11861.302.72$3,038
Feb 202113590957.805.55$12,846
Jan 2021087550.412.81$2,459
Dec 202001,06344.642.68$2,844
Nov 202001,05738.772.71$2,861
Oct 2020097336.972.48$2,412
Sep 2020096737.091.99$1,925
Aug 202001,00839.982.39$2,404
Jul 2020098438.371.83$1,796
Jun 2020095234.901.69$1,609
May 2020095116.921.81$1,726
Apr 2020093714.751.80$1,691
Mar 20207793030.341.86$4,062
Feb 2020086649.881.98$1,715
Jan 2020088557.252.09$1,854
Dec 2019090459.012.30$2,083
Nov 2019087055.302.75$2,393
Oct 2019088353.472.42$2,136
Sep 20197382955.052.66$6,222
Aug 2019085753.112.30$1,975
Jul 2019084956.272.46$2,089
Jun 2019082152.782.49$2,045
May 2019084758.482.74$2,321
Apr 2019084762.632.75$2,330
Mar 20197689656.803.06$7,060
Feb 2019080550.852.79$2,248
Jan 2019087846.033.23$2,834
Dec 2018087446.594.19$3,658
Nov 2018084552.934.24$3,580
Oct 2018087861.443.40$2,984
Sep 2018062259.543.11$1,933
Aug 2018061459.403.07$1,883
Jul 2018053465.142.93$1,566
Jun 2018062660.183.08$1,926
May 2018071065.382.90$2,060
Apr 201814595463.842.90$12,024
Mar 2018098661.222.79$2,748
Feb 2018085061.782.77$2,351
Jan 201811,02162.874.01$4,156
Dec 2017082957.272.92$2,422
Nov 2017092855.423.12$2,894
Oct 2017094349.292.98$2,814
Sep 2017094047.523.09$2,902
Aug 201701945.373.00$57
Jul 2017095043.873.09$2,933
Jun 2017095842.493.09$2,958
May 201701,49045.373.26$4,862
Apr 201701,31847.933.21$4,233
Mar 20171891,36746.772.98$12,918
Feb 201701,24050.452.95$3,661
Jan 201701,41749.413.42$4,844
Dec 201601,39748.763.72$5,201
Nov 2016094642.492.64$2,502
Oct 2016095046.193.09$2,936
Sep 2016094141.553.10$2,918
Aug 2016096541.442.92$2,822
Jul 201601,06541.622.92$3,114
Jun 201601,21845.352.69$3,271
May 201601,18742.521.99$2,363
Apr 2016079936.561.99$1,591
Mar 2016077033.011.79$1,381
Feb 2016070026.472.06$1,445
Jan 201601427.352.36$33
Dec 2015060132.362.00$1,203
Nov 2015051238.792.17$1,110
Oct 2015045943.552.43$1,114
Sep 2015046642.992.76$1,285
Aug 2015048040.162.87$1,379
Jul 2015047148.152.95$1,387
Jun 2015053456.152.88$1,539
May 2015061855.212.96$1,826
Apr 201516565049.822.71$9,980
Mar 2015080642.892.93$2,365
Feb 2015079844.662.98$2,375
Jan 2015094143.433.10$2,918
Dec 2014097054.693.59$3,484
Nov 201401,06370.464.25$4,520
Oct 201401,08078.303.90$4,213
Sep 201401,07486.164.05$4,345
Aug 201401,05389.394.04$4,249
Jul 201401,04896.564.18$4,380
Jun 2014087198.164.74$4,126
May 2014093894.734.73$4,434
Apr 2014092395.944.81$4,439
Mar 2014091795.895.06$4,637
Feb 2014086597.406.19$5,356
Jan 201401,04590.404.86$5,079
Dec 20131441,29191.824.35$18,844
Nov 2013094788.853.74$3,540
Oct 201301,16097.423.78$4,384
Sep 201301,135104.113.72$4,220
Aug 201301,165104.253.52$4,104
Jul 201301,167102.523.72$4,339
Jun 201301,10394.403.93$4,339
May 201301,17894.834.15$4,888
Apr 20131991,09693.964.28$23,392
Mar 201301,14393.623.91$4,472
Feb 2013097491.233.42$3,331
Jan 201301,25991.603.42$4,306
Dec 201201,23186.773.42$4,210
Nov 201201,05986.953.62$3,839
Oct 2012091489.383.40$3,107
Sep 2012092794.672.92$2,705
Aug 201201,02592.662.91$2,981
Jul 201201,06385.133.02$3,211
Jun 2012073479.822.52$1,849
May 2012076991.612.49$1,914
Apr 201201,125101.652.00$2,246
Mar 201201,171105.052.22$2,602
Feb 201201,235101.102.57$3,174
Jan 201217072698.092.73$18,660
Dec 201101,22496.873.24$3,965
Nov 201101,12695.723.31$3,729
Oct 201101,20484.983.65$4,393
Sep 201101,32083.623.99$5,261
Aug 201101,35783.404.15$5,631
Jul 201101,35894.144.52$6,134
Jun 201101,30392.904.64$6,046
May 201101,42298.134.40$6,264
Apr 201101,397105.964.33$6,054
Mar 20111761,45996.364.06$22,879
Feb 201101,13385.644.18$4,736
Jan 201101,49886.504.59$6,874
Dec 201001,52185.734.35$6,613
Nov 201001,49380.843.80$5,666
Oct 201001,55878.103.51$5,467
Sep 201001,53872.633.98$6,120
Aug 20101351,60373.684.42$17,031
Jul 201001,62272.554.74$7,683
Jun 201001,57970.364.91$7,754
May 20101941,63071.124.24$20,701
Apr 201001,57781.694.12$6,501
Mar 201001,61078.394.39$7,066
Feb 201001,50373.585.44$8,180
Jan 201001,89974.365.96$11,326
Dec 200901,83471.445.48$10,057
Nov 200901,72774.593.75$6,479
Oct 200901,81872.544.11$7,472
Sep 200901,83565.543.06$5,624
Aug 200901,87567.423.22$6,035
Jul 20091451,73661.133.46$14,878
Jun 200901,59166.163.90$6,197
May 200901,45554.743.93$5,712
Apr 20091722,43446.773.59$16,776
Mar 20091793,91042.144.06$23,414
Feb 200903,04132.814.63$14,089
Jan 20091813,42235.865.37$24,870
Dec 200802,87737.105.98$17,196
Nov 200803,27155.496.86$22,440
Oct 20083173,58775.246.92$48,680
Sep 200803,516101.767.88$27,696
Aug 200803,695114.228.48$31,345
Jul 20081653,648131.0811.39$63,177
Jun 20081703,666131.3313.03$70,104
May 200803,747123.1711.57$43,369
Apr 20081783,877110.3110.45$60,169
Mar 20081834,170101.909.66$58,947
Feb 200803,52592.538.77$30,916
Jan 20081784,10390.388.21$49,756
Dec 20071814,25688.337.30$47,065
Nov 200703,81791.677.29$27,832
Oct 20071744,88582.856.92$48,230
Sep 200704,38275.846.24$27,362
Aug 20071645,10469.066.39$43,930
Jul 20071654,85570.906.39$42,712
Jun 200704,68362.007.55$35,349
May 20073114,87758.747.85$56,534
Apr 20073654,37159.617.81$55,874
Mar 200706,61256.927.30$48,281
Feb 20071695,38455.108.22$53,547
Jan 20071795,44450.306.73$45,625
Dec 20061776,23456.656.92$53,157
Nov 20061745,25254.207.62$49,438
Oct 20063194,72254.906.01$45,910
Sep 20061715,58460.085.04$38,401
Aug 20061726,81068.717.34$61,803
Jul 20061766,17469.376.34$51,369
Jun 20063157,76466.286.38$70,443
May 20063827,41166.016.42$72,832
Apr 20063787,15964.397.36$77,033
Mar 20063647,99556.707.08$77,267
Feb 20061818,14757.597.75$73,572
Jan 20061,00711,23360.598.93$161,362
Dec 200517913,10054.9413.42$185,576
Nov 200538312,82154.6910.59$156,700
Oct 200509,96758.3413.80$137,502
Sep 200501,62161.4512.08$19,580
Aug 20050061.519.80$0
Jul 20050055.697.84$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.93 =         $0
Gas                1,226 Mcf  × $  2.87 =     $3,518

────────────────────────────────────────────────────
Month total                                   $3,518

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/213115 is the state's own key, not one this site invented.