KING -E-

Operated by UNBRIDLED RESOURCES, LLC (P-5 875461) in the ALPAR-PEARSON (BROWN DOLOMITE) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 214844District 10Field 01933790GasSaveExport
Value, all time
$2.4 M
Oct 2004 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
260
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 51 leases and 51 wells, and the rule below applies to all of them.

Discovered
1991-05-17
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 01/01/2000.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction366,310 Mcf$2,423,070
Total$2,423,070

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.0598, -100.9680. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.05981, -100.96802 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
3,461 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 3,461 ft.

Completions filed
Dec 2004
1 of 1 wells

1 well

42-3573246633,461 ftDec 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (260)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

260 months

May 20260106.413.05$0
Apr 2026098.932.87$0
Mar 2026089.753.15$0
Feb 2026063.503.75$0
Jan 2026059.138.00$0
Dec 2025056.664.41$0
Nov 2025058.593.93$0
Oct 2025059.383.30$0
Sep 2025062.743.08$0
Aug 2025063.933.01$0
Jul 2025066.743.32$0
Jun 2025066.483.13$0
May 2025060.553.23$0
Apr 2025062.363.54$0
Mar 2025067.704.27$0
Feb 2025070.884.34$0
Jan 2025074.324.28$0
Dec 2024068.993.12$0
Nov 2024069.052.20$0
Oct 2024071.372.28$0
Sep 2024069.612.36$0
Aug 2024075.632.06$0
Jul 2024079.932.15$0
Jun 2024078.082.63$0
May 2024078.812.20$0
Apr 2024084.451.66$0
Mar 2024080.301.55$0
Feb 2024076.091.78$0
Jan 2024073.023.30$0
Dec 2023071.262.61$0
Nov 2023077.892.81$0
Oct 2023085.443.09$0
Sep 2023089.042.74$0
Aug 2023080.522.67$0
Jul 2023074.852.64$0
Jun 2023068.962.26$0
May 2023070.622.23$0
Apr 2023078.122.24$0
Mar 2023072.852.39$0
Feb 2023075.112.47$0
Jan 2023076.533.39$0
Dec 2022076.415.73$0
Nov 2022085.005.65$0
Oct 2022087.185.86$0
Sep 2022084.888.16$0
Aug 2022094.529.13$0
Jul 20220101.587.54$0
Jun 20220115.097.98$0
May 20220109.378.43$0
Apr 20220104.226.84$0
Mar 20220108.885.08$0
Feb 2022091.054.86$0
Jan 2022081.844.54$0
Dec 2021071.323.90$0
Nov 2021077.435.24$0
Oct 2021079.795.71$0
Sep 2021069.865.35$0
Aug 2021066.024.22$0
Jul 2021070.783.98$0
Jun 2021069.493.38$0
May 2021063.483.02$0
Apr 2021060.362.76$0
Mar 2021061.302.72$0
Feb 2021057.805.55$0
Jan 2021050.412.81$0
Dec 2020044.642.68$0
Nov 2020038.772.71$0
Oct 2020036.972.48$0
Sep 2020037.091.99$0
Aug 2020039.982.39$0
Jul 2020038.371.83$0
Jun 2020034.901.69$0
May 2020016.921.81$0
Apr 2020014.751.80$0
Mar 2020030.341.86$0
Feb 2020049.881.98$0
Jan 2020057.252.09$0
Dec 2019059.012.30$0
Nov 2019055.302.75$0
Oct 2019053.472.42$0
Sep 2019055.052.66$0
Aug 2019053.112.30$0
Jul 2019056.272.46$0
Jun 2019052.782.49$0
May 2019058.482.74$0
Apr 2019062.632.75$0
Mar 2019056.803.06$0
Feb 2019050.852.79$0
Jan 2019046.033.23$0
Dec 2018046.594.19$0
Nov 2018052.934.24$0
Oct 2018061.443.40$0
Sep 2018059.543.11$0
Aug 2018059.403.07$0
Jul 2018065.142.93$0
Jun 2018060.183.08$0
May 2018065.382.90$0
Apr 20181563.842.90$44
Mar 20182361.222.79$64
Feb 2018061.782.77$0
Jan 2018062.874.01$0
Dec 20172057.272.92$58
Nov 20173955.423.12$122
Oct 20172149.292.98$63
Sep 20175847.523.09$179
Aug 2017045.373.00$0
Jul 20174343.873.09$133
Jun 201713542.493.09$417
May 20178545.373.26$277
Apr 201711447.933.21$366
Mar 20177546.772.98$224
Feb 20173950.452.95$115
Jan 2017949.413.42$31
Dec 20168748.763.72$324
Nov 201615242.492.64$402
Oct 201620446.193.09$630
Sep 201654741.553.10$1,696
Aug 201666141.442.92$1,933
Jul 201658841.622.92$1,720
Jun 201651245.352.69$1,375
May 201663642.521.99$1,266
Apr 201665936.561.99$1,312
Mar 201668933.011.79$1,236
Feb 201665026.472.06$1,341
Jan 201662327.352.36$1,473
Dec 201561832.362.00$1,237
Nov 201559338.792.17$1,285
Oct 201573743.552.43$1,788
Sep 201568542.992.76$1,890
Aug 201568740.162.87$1,973
Jul 201574348.152.95$2,188
Jun 201563856.152.88$1,839
May 201560755.212.96$1,794
Apr 201565649.822.71$1,776
Mar 201554542.892.93$1,599
Feb 201554044.662.98$1,607
Jan 201569743.433.10$2,161
Dec 201452154.693.59$1,871
Nov 201453470.464.25$2,270
Oct 201453678.303.90$2,091
Sep 201462186.164.05$2,512
Aug 201454989.394.04$2,215
Jul 201448596.564.18$2,027
Jun 201465498.164.74$3,098
May 201453194.734.73$2,510
Apr 201455995.944.81$2,688
Mar 201473295.895.06$3,702
Feb 201458097.406.19$3,591
Jan 201468090.404.86$3,305
Dec 201364591.824.35$2,809
Nov 201369488.853.74$2,594
Oct 201370197.423.78$2,649
Sep 2013404104.113.72$1,502
Aug 2013391104.253.52$1,377
Jul 2013628102.523.72$2,335
Jun 201384894.403.93$3,336
May 201395794.834.15$3,971
Apr 201350993.964.28$2,180
Mar 201398293.623.91$3,842
Feb 201398491.233.42$3,365
Jan 20131,14191.603.42$3,902
Dec 20121,01086.773.42$3,454
Nov 201285886.953.62$3,110
Oct 201294489.383.40$3,209
Sep 201296294.672.92$2,808
Aug 20121,00292.662.91$2,914
Jul 201292785.133.02$2,800
Jun 20121,06479.822.52$2,680
May 20121,23491.612.49$3,071
Apr 20121,210101.652.00$2,416
Mar 20121,293105.052.22$2,873
Feb 20121,291101.102.57$3,318
Jan 20121,40798.092.73$3,847
Dec 20111,44596.873.24$4,681
Nov 20111,40095.723.31$4,636
Oct 20111,55684.983.65$5,677
Sep 201198483.623.99$3,922
Aug 20111,42483.404.15$5,909
Jul 20111,37994.144.52$6,229
Jun 20111,44692.904.64$6,709
May 20111,56798.134.40$6,902
Apr 20111,570105.964.33$6,803
Mar 20111,62396.364.06$6,585
Feb 20111,56085.644.18$6,521
Jan 20111,81086.504.59$8,306
Dec 20101,82385.734.35$7,926
Nov 20101,81280.843.80$6,877
Oct 20101,87778.103.51$6,586
Sep 20101,86272.633.98$7,410
Aug 20101,93373.684.42$8,543
Jul 20101,90972.554.74$9,042
Jun 20101,91070.364.91$9,379
May 20102,02271.124.24$8,564
Apr 20101,98681.694.12$8,188
Mar 20101,98678.394.39$8,716
Feb 20101,77273.585.44$9,644
Jan 20102,25074.365.96$13,419
Dec 20092,27471.445.48$12,470
Nov 20092,29474.593.75$8,606
Oct 20092,18772.544.11$8,989
Sep 20091,61665.543.06$4,953
Aug 20091,86667.423.22$6,006
Jul 20091,80561.133.46$6,253
Jun 20091,82666.163.90$7,112
May 20091,81754.743.93$7,133
Apr 20091,93946.773.59$6,956
Mar 20091,97842.144.06$8,029
Feb 20092,22832.814.63$10,322
Jan 20092,60835.865.37$14,008
Dec 20081,95537.105.98$11,685
Nov 20082,46855.496.86$16,931
Oct 20082,38275.246.92$16,488
Sep 20082,762101.767.88$21,757
Aug 20082,865114.228.48$24,304
Jul 20082,491131.0811.39$28,371
Jun 20082,903131.3313.03$37,834
May 20083,072123.1711.57$35,556
Apr 20083,420110.3110.45$35,756
Mar 20083,659101.909.66$35,361
Feb 20083,15492.538.77$27,662
Jan 20083,67490.388.21$30,148
Dec 20073,90588.337.30$28,514
Nov 20073,57391.677.29$26,053
Oct 20074,00282.856.92$27,702
Sep 20073,85075.846.24$24,040
Aug 20074,23469.066.39$27,047
Jul 20073,67170.906.39$23,450
Jun 20073,06762.007.55$23,151
May 20074,45358.747.85$34,939
Apr 20073,58559.617.81$27,982
Mar 20073,49656.927.30$25,528
Feb 20074,03155.108.22$33,119
Jan 20073,70050.306.73$24,889
Dec 20064,17456.656.92$28,878
Nov 20064,31354.207.62$32,854
Oct 20064,86454.906.01$29,251
Sep 20064,55960.085.04$22,965
Aug 20064,48668.717.34$32,927
Jul 20065,07169.376.34$32,164
Jun 20064,66366.286.38$29,768
May 20065,05066.016.42$32,446
Apr 20065,25064.397.36$38,643
Mar 20065,75856.707.08$40,783
Feb 20065,75957.597.75$44,639
Jan 20067,28860.598.93$65,106
Dec 20058,07154.9413.42$108,276
Nov 20054,45954.6910.59$47,214
Oct 20053,84858.3413.80$53,086
Sep 20052,98161.4512.08$36,008
Aug 20056,08361.519.80$59,594
Jul 20055,31355.697.84$41,673
Jun 200511,18252.337.38$82,535
May 200513,01445.226.65$86,558
Apr 200514,91149.207.36$109,752
Mar 20059,41950.377.15$67,392
Feb 200511,99045.226.31$75,680
Jan 200514,59643.166.32$92,279
Dec 20045,88039.866.75$39,696
Nov 20041,94445.286.33$12,306
Oct 20042,17049.706.52$14,138

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2018 — as filed, then multipliedworked
Gas                   15 Mcf  × $  2.90 =        $44

────────────────────────────────────────────────────
Month total                                      $44

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/214844 is the state's own key, not one this site invented.