PRICE, WILLIS D.

Operated by HIGHMARK ENERGY OPERATING, LLC (P-5 385847) in the LIPSCOMB (CLEVELAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 215019District 10Field 538692702 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.9 M
Mar 2006 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
243
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,389 leases and 1,486 wells, and the rule below applies to all of them.

Discovered
1958-05-24
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2013-08-06.

The Commission's schedule remark for this field reads: FIELD

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-07-26168477
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition4,726 bbl$310,645
GasProduction279,339 Mcf$1,627,615
Total$1,938,261

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.2319, -100.0623. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.23187, -100.06229 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,868 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,868 ft.

Completions filed
Mar 2006
1 of 1 wells

1 well

42-2953296112H7,868 ftMar 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (243)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

243 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200314.751.80$5
Mar 20200530.341.86$9
Feb 20200549.881.98$10
Jan 20200857.252.09$17
Dec 20190459.012.30$9
Nov 20190755.302.75$19
Oct 20190553.472.42$12
Sep 20190555.052.66$13
Aug 20190553.112.30$12
Jul 20190756.272.46$17
Jun 20190552.782.49$12
May 20190558.482.74$14
Apr 20190562.632.75$14
Mar 20190756.803.06$21
Feb 20190050.852.79$0
Jan 201901946.033.23$61
Dec 201801346.594.19$54
Nov 201801852.934.24$76
Oct 201801261.443.40$41
Sep 201801559.543.11$47
Aug 201801159.403.07$34
Jul 20180665.142.93$18
Jun 2018402160.183.08$2,472
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 201703047.933.21$96
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160542.492.64$13
Oct 20160846.193.09$25
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 201602636.561.99$52
Mar 201601133.011.79$20
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 201501132.362.00$22
Nov 20150038.792.17$0
Oct 2015026243.552.43$636
Sep 2015053442.992.76$1,473
Aug 2015056240.162.87$1,614
Jul 201515638248.152.95$8,636
Jun 2015060156.152.88$1,733
May 2015069955.212.96$2,066
Apr 2015057349.822.71$1,551
Mar 2015036542.892.93$1,071
Feb 201501344.662.98$39
Jan 201501,13243.433.10$3,510
Dec 201401,28754.693.59$4,622
Nov 201401,27870.464.25$5,434
Oct 201401,40978.303.90$5,496
Sep 201401,37486.164.05$5,558
Aug 201401,34089.394.04$5,407
Jul 201401,44996.564.18$6,056
Jun 201401,41798.164.74$6,712
May 20142681,21794.734.73$31,140
Apr 201401,40095.944.81$6,733
Mar 201401,13795.895.06$5,750
Feb 201401,19297.406.19$7,381
Jan 201401,26690.404.86$6,154
Dec 201301,34091.824.35$5,835
Nov 201301,51288.853.74$5,652
Oct 201301,50997.423.78$5,703
Sep 201301,395104.113.72$5,186
Aug 201301,497104.253.52$5,273
Jul 201301,705102.523.72$6,339
Jun 201301,70294.403.93$6,695
May 201301,67294.834.15$6,937
Apr 201301,66493.964.28$7,126
Mar 201301,58393.623.91$6,194
Feb 2013076291.233.42$2,606
Jan 2013094191.603.42$3,218
Dec 2012089886.773.42$3,071
Nov 2012094186.953.62$3,411
Oct 20121851,12789.383.40$20,367
Sep 2012097494.672.92$2,843
Aug 201201,13092.662.91$3,286
Jul 201201,15385.133.02$3,483
Jun 201201,16379.822.52$2,930
May 201201,21991.612.49$3,033
Apr 201201,200101.652.00$2,396
Mar 20120735105.052.22$1,633
Feb 201201,269101.102.57$3,262
Jan 201201,53598.092.73$4,197
Dec 201101,77996.873.24$5,764
Nov 201101,54895.723.31$5,126
Oct 201101,73684.983.65$6,334
Sep 20111841,21283.623.99$20,217
Aug 2011062183.404.15$2,577
Jul 201101,70794.144.52$7,711
Jun 201101,53792.904.64$7,132
May 201101,59798.134.40$7,035
Apr 201101,595105.964.33$6,912
Mar 201101,58996.364.06$6,447
Feb 201101,41185.644.18$5,898
Jan 201101,14386.504.59$5,245
Dec 201001,36685.734.35$5,939
Nov 201001,33380.843.80$5,059
Oct 20101871,60778.103.51$20,243
Sep 201001,81872.633.98$7,235
Aug 201001,84273.684.42$8,140
Jul 201001,88172.554.74$8,909
Jun 201001,41370.364.91$6,938
May 201001,51371.124.24$6,408
Apr 201002,01881.694.12$8,320
Mar 201002,15778.394.39$9,466
Feb 20101962,06173.585.44$25,638
Jan 201002,38674.365.96$14,230
Dec 200902,65871.445.48$14,576
Nov 200901,90174.593.75$7,132
Oct 200902,56772.544.11$10,551
Sep 200902,57965.543.06$7,904
Aug 20091842,63367.423.22$20,880
Jul 200902,77861.133.46$9,624
Jun 200902,77866.163.90$10,820
May 200903,19854.743.93$12,555
Apr 20091972,81446.773.59$19,309
Mar 200902,10942.144.06$8,560
Feb 20093962,16332.814.63$23,014
Jan 200901,70735.865.37$9,168
Dec 200801,98637.105.98$11,871
Nov 200802,53455.496.86$17,384
Oct 200803,44575.246.92$23,846
Sep 200803,412101.767.88$26,877
Aug 200803,040114.228.48$25,788
Jul 200802,281131.0811.39$25,979
Jun 200801,185131.3313.03$15,444
May 200801,779123.1711.57$20,591
Apr 200801,422110.3110.45$14,867
Mar 200803,154101.909.66$30,480
Feb 20081902,35992.538.77$38,271
Jan 200802,74990.388.21$22,558
Dec 200702,90588.337.30$21,212
Nov 200703,27291.677.29$23,858
Oct 20071823,61782.856.92$40,116
Sep 200703,67975.846.24$22,972
Aug 200703,74469.066.39$23,916
Jul 20071824,02570.906.39$38,615
Jun 200704,29262.007.55$32,398
May 200704,31758.747.85$33,872
Apr 20071884,50859.617.81$46,393
Mar 200704,87156.927.30$35,568
Feb 200704,71655.108.22$38,747
Jan 20071865,57050.306.73$46,824
Dec 200605,53956.656.92$38,321
Nov 20061805,72454.207.62$53,358
Oct 20061886,65754.906.01$50,355
Sep 20061816,16060.085.04$41,904
Aug 200605,81668.717.34$42,689
Jul 20061816,76869.376.34$55,484
Jun 20061827,97966.286.38$63,000
May 20063609,59066.016.42$85,379
Apr 200653312,06964.397.36$123,154
Mar 2006013,62356.707.08$96,491

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2020 — as filed, then multipliedworked
Condensate             0 bbl  × $ 14.75 =         $0
Gas                    3 Mcf  × $  1.80 =         $5

────────────────────────────────────────────────────
Month total                                       $5

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/215019 is the state's own key, not one this site invented.