PERRY

Operated by 4P ENERGY TEXAS, LLC (P-5 953803) in the PERRYTON (CHESTER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 215696District 10Field 70743050CondensateGasSaveExport
Value, all time
$1.1 M
May 2005 – Apr 2020
Value, last 12 filed months
$0
at the published price for each month
Months reported
180
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 5 leases and 5 wells, and the rule below applies to all of them.

Discovered
1985-05-24
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 11/01/2011.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,272 bbl$78,033
GasProduction143,586 Mcf$982,060
Total$1,060,093

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.3712, -100.7960. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.37116, -100.79599 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
8,436 ft
1 wells filed one
Completion to plug
13.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,436 ft.

Completions filed
May 2005
1 of 1 wells
Plug dates filed
Aug 2018
1 of 1 wells

Last completion to plug: a median of 13.3 years across the 1 well that filed both dates, with the middle half between 13.3 years and 13.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3573246328,436 ftMay 2005Aug 2018Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (180)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

180 months

Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 201643042.521.99$1,828
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 2016014226.472.06$293
Jan 2016014527.352.36$343
Dec 2015022532.362.00$450
Nov 201518412638.792.17$7,410
Oct 2015014443.552.43$349
Sep 2015019942.992.76$549
Aug 2015021540.162.87$618
Jul 2015020948.152.95$616
Jun 2015021356.152.88$614
May 2015021955.212.96$647
Apr 2015021049.822.71$568
Mar 2015022842.892.93$669
Feb 201501244.662.98$36
Jan 2015023343.433.10$722
Dec 2014010554.693.59$377
Nov 20140070.464.25$0
Oct 201404778.303.90$183
Sep 2014054886.164.05$2,217
Aug 2014071689.394.04$2,889
Jul 2014029796.564.18$1,241
Jun 2014032598.164.74$1,539
May 2014061794.734.73$2,916
Apr 2014052595.944.81$2,525
Mar 2014040995.895.06$2,068
Feb 2014029497.406.19$1,820
Jan 20140090.404.86$0
Dec 2013027291.824.35$1,184
Nov 2013040388.853.74$1,507
Oct 2013056597.423.78$2,135
Sep 20130657104.113.72$2,443
Aug 20130703104.253.52$2,476
Jul 20130727102.523.72$2,703
Jun 2013076894.403.93$3,021
May 2013064294.834.15$2,664
Apr 2013047693.964.28$2,039
Mar 2013025893.623.91$1,010
Feb 201308691.233.42$294
Jan 20130091.603.42$0
Dec 2012035086.773.42$1,197
Nov 2012039486.953.62$1,428
Oct 2012012389.383.40$418
Sep 2012012294.672.92$356
Aug 2012011792.662.91$340
Jul 2012010085.133.02$302
Jun 201206779.822.52$169
May 201218915091.612.49$17,688
Apr 201220122101.652.00$2,277
Mar 2012063105.052.22$140
Feb 201200101.102.57$0
Jan 2012012998.092.73$353
Dec 2011014796.873.24$476
Nov 2011017395.723.31$573
Oct 2011020584.983.65$748
Sep 2011026683.623.99$1,060
Aug 2011076083.404.15$3,153
Jul 2011011994.144.52$538
Jun 20110692.904.64$28
May 2011028498.134.40$1,251
Apr 20110433105.964.33$1,876
Mar 201101,29696.364.06$5,258
Feb 2011044785.644.18$1,868
Jan 2011073586.504.59$3,373
Dec 2010082185.734.35$3,570
Nov 2010097180.843.80$3,685
Oct 201001,13178.103.51$3,969
Sep 2010079772.633.98$3,172
Aug 201001,28273.684.42$5,666
Jul 201001,25172.554.74$5,925
Jun 201001,35870.364.91$6,668
May 201001,04871.124.24$4,439
Apr 2010073281.694.12$3,018
Mar 2010068178.394.39$2,989
Feb 201001,10473.585.44$6,008
Jan 201001,14174.365.96$6,805
Dec 2009089971.445.48$4,930
Nov 2009095874.593.75$3,594
Oct 200901,19672.544.11$4,916
Sep 200901,13765.543.06$3,485
Aug 200901,29667.423.22$4,171
Jul 200901,41261.133.46$4,892
Jun 200901,95966.163.90$7,630
May 200902,11154.743.93$8,287
Apr 2009052846.773.59$1,894
Mar 2009076442.144.06$3,101
Feb 20092011,10632.814.63$11,719
Jan 200901,28135.865.37$6,880
Dec 200801,36737.105.98$8,171
Nov 200801,45655.496.86$9,989
Oct 200801,63675.246.92$11,324
Sep 200801,428101.767.88$11,248
Aug 200801,575114.228.48$13,361
Jul 200801,487131.0811.39$16,936
Jun 200801,610131.3313.03$20,983
May 200801,786123.1711.57$20,672
Apr 200801,998110.3110.45$20,889
Mar 200801,553101.909.66$15,008
Feb 200801,46992.538.77$12,884
Jan 20081981,48990.388.21$30,114
Dec 200701,56788.337.30$11,442
Nov 200701,64491.677.29$11,988
Oct 200701,85782.856.92$12,854
Sep 200701,73875.846.24$10,852
Aug 200701,91969.066.39$12,258
Jul 200702,01270.906.39$12,853
Jun 200702,09462.007.55$15,806
May 200702,14958.747.85$16,862
Apr 200702,19259.617.81$17,109
Mar 200702,58856.927.30$18,898
Feb 200701,20555.108.22$9,900
Jan 200702,21850.306.73$14,920
Dec 200602,44956.656.92$16,943
Nov 20062012,67354.207.62$31,256
Oct 200602,41954.906.01$14,547
Sep 200602,85560.085.04$14,381
Aug 200602,77268.717.34$20,346
Jul 200602,86669.376.34$18,178
Jun 200603,00366.286.38$19,171
May 200603,45066.016.42$22,166
Apr 200603,59364.397.36$26,446
Mar 200602,95356.707.08$20,916
Feb 200602,04257.597.75$15,828
Jan 20061942,53160.598.93$34,365
Dec 200502,26854.9413.42$30,426
Nov 200502,78454.6910.59$29,478
Oct 200502,62458.3413.80$36,200
Sep 2005423,10961.4512.08$40,135
Aug 200502,46461.519.80$24,139
Jul 200502,85055.697.84$22,354
Jun 200503,10552.337.38$22,918
May 200503,20745.226.65$21,330

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2016 — as filed, then multipliedworked
Condensate            43 bbl  × $ 42.52 =     $1,828
Gas                    0 Mcf  × $  1.99 =         $0

────────────────────────────────────────────────────
Month total                                   $1,828

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/215696 is the state's own key, not one this site invented.