DIXON

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 216395District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.5 M
Oct 2005 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
248
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-08-14168602
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,802 bbl$178,983
GasProduction358,807 Mcf$2,369,616
Total$2,548,598

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6908, -100.3200. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.69079, -100.31997 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,750 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,750 ft.

Completions filed
Oct 2005
1 of 1 wells

1 well

42-211333465603P11,750 ftOct 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (248)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

248 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 2023183068.962.26$12,620
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 201903053.472.42$73
Sep 201911039255.052.66$7,097
Aug 2019156553.112.30$1,355
Jul 201911,15156.272.46$2,888
Jun 20191001,15952.782.49$8,165
May 201971,33758.482.74$4,073
Apr 2019121,24962.632.75$4,187
Mar 201921,24656.803.06$3,929
Feb 201911,14150.852.79$3,237
Jan 201901,14846.033.23$3,706
Dec 201801,13746.594.19$4,759
Nov 201801,15752.934.24$4,902
Oct 201831,19861.443.40$4,255
Sep 201821,13159.543.11$3,634
Aug 201801,18859.403.07$3,643
Jul 201831,18365.142.93$3,664
Jun 201801,15960.183.08$3,566
May 201851,16865.382.90$3,715
Apr 201851,18463.842.90$3,754
Mar 201851,18461.222.79$3,606
Feb 2018297561.782.77$2,821
Jan 201821,06462.874.01$4,392
Dec 201731,27757.272.92$3,903
Nov 201701,30655.423.12$4,073
Oct 201701,51649.292.98$4,523
Sep 201711,32147.523.09$4,126
Aug 201741,35845.373.00$4,261
Jul 201721,61243.873.09$5,064
Jun 20171121,57142.493.09$9,609
May 2017151,49245.373.26$5,550
Apr 201701,36347.933.21$4,377
Mar 201701,41546.772.98$4,222
Feb 201701,26850.452.95$3,744
Jan 201701,37949.413.42$4,715
Dec 201601,41848.763.72$5,279
Nov 2016098242.492.64$2,597
Oct 201601,03546.193.09$3,198
Sep 2016097241.553.10$3,014
Aug 2016094441.442.92$2,761
Jul 201616092741.622.92$9,370
Jun 2016094745.352.69$2,543
May 201601,02142.521.99$2,033
Apr 2016094736.561.99$1,886
Mar 201601,02333.011.79$1,835
Feb 2016093526.472.06$1,929
Jan 2016095027.352.36$2,246
Dec 2015095832.362.00$1,917
Nov 2015095638.792.17$2,072
Oct 201501,01543.552.43$2,463
Sep 201501,01942.992.76$2,811
Aug 2015199040.162.87$2,884
Jul 201501,09948.152.95$3,237
Jun 201511,09056.152.88$3,198
May 201501,59655.212.96$4,717
Apr 201501,10349.822.71$2,985
Mar 201501,17542.892.93$3,448
Feb 201501,37644.662.98$4,095
Jan 2015089543.433.10$2,775
Dec 2014093654.693.59$3,362
Nov 2014091170.464.25$3,873
Oct 2014097878.303.90$3,815
Sep 2014095786.164.05$3,871
Aug 2014098589.394.04$3,975
Jul 201401,06296.564.18$4,439
Jun 201401,01498.164.74$4,803
May 201401,14894.734.73$5,426
Apr 201421,13695.944.81$5,655
Mar 201401,15295.895.06$5,825
Feb 201401,10697.406.19$6,848
Jan 201421,20190.404.86$6,019
Dec 201321,16391.824.35$5,248
Nov 201301,23488.853.74$4,613
Oct 20131931,28097.423.78$23,640
Sep 201301,298104.113.72$4,826
Aug 201301,315104.253.52$4,632
Jul 201311,318102.523.72$5,003
Jun 201311,25694.403.93$5,035
May 201301,30294.834.15$5,402
Apr 201311,27593.964.28$5,554
Mar 201311,24293.623.91$4,953
Feb 201301,06791.233.42$3,649
Jan 201301,34191.603.42$4,586
Dec 201201,33786.773.42$4,573
Nov 201211,52186.953.62$5,601
Oct 201211,05489.383.40$3,673
Sep 2012221,09394.672.92$5,273
Aug 2012065292.662.91$1,896
Jul 201251,05085.133.02$3,597
Jun 201232,46779.822.52$6,454
May 20123391.612.49$282
Apr 2012099101.652.00$198
Mar 20123156105.052.22$662
Feb 20120189101.102.57$486
Jan 2012038898.092.73$1,061
Dec 2011066996.873.24$2,167
Nov 2011037895.723.31$1,252
Oct 201101,41384.983.65$5,155
Sep 201101,55783.623.99$6,206
Aug 201101,61083.404.15$6,680
Jul 201101,52494.144.52$6,884
Jun 201101,38992.904.64$6,445
May 201101,49498.134.40$6,581
Apr 201101,393105.964.33$6,036
Mar 201101,10996.364.06$4,500
Feb 2011094885.644.18$3,963
Jan 201101,35386.504.59$6,209
Dec 201001,33785.734.35$5,813
Nov 201001,37880.843.80$5,230
Oct 201001,32178.103.51$4,635
Sep 2010067872.633.98$2,698
Aug 20100073.684.42$0
Jul 201001,61172.554.74$7,630
Jun 20101781,78370.364.91$21,279
May 201002,00771.124.24$8,500
Apr 201001,69281.694.12$6,976
Mar 201001,07678.394.39$4,722
Feb 201001,86973.585.44$10,172
Jan 201001,46174.365.96$8,714
Dec 200901,44271.445.48$7,908
Nov 200902,15874.593.75$8,096
Oct 200902,12872.544.11$8,747
Sep 200902,10165.543.06$6,439
Aug 200902,14767.423.22$6,910
Jul 200902,21061.133.46$7,657
Jun 200902,21066.163.90$8,608
May 20091882,29654.743.93$19,305
Apr 200902,26246.773.59$8,115
Mar 200902,06442.144.06$8,378
Feb 200901,89032.814.63$8,756
Jan 200902,12635.865.37$11,419
Dec 200802,23437.105.98$13,353
Nov 20081772,27755.496.86$25,443
Oct 200802,39075.246.92$16,544
Sep 200802,290101.767.88$18,039
Aug 200802,420114.228.48$20,529
Jul 200802,751131.0811.39$31,332
Jun 200802,736131.3313.03$35,657
May 200802,886123.1711.57$33,403
Apr 200802,797110.3110.45$29,242
Mar 200802,772101.909.66$26,789
Feb 200803,00392.538.77$26,338
Jan 200802,66390.388.21$21,852
Dec 200702,70488.337.30$19,745
Nov 200702,86791.677.29$20,905
Oct 200703,38982.856.92$23,459
Sep 20073453,29975.846.24$46,764
Aug 200703,59569.066.39$22,965
Jul 200703,73870.906.39$23,878
Jun 200703,62762.007.55$27,378
May 200703,80758.747.85$29,871
Apr 200703,70059.617.81$28,879
Mar 200704,05456.927.30$29,602
Feb 200703,54155.108.22$29,093
Jan 200784,24550.306.73$28,958
Dec 200603,50656.656.92$24,256
Nov 200604,27454.207.62$32,557
Oct 200604,69554.906.01$28,235
Sep 200604,75360.085.04$23,942
Aug 200605,19568.717.34$38,131
Jul 20061845,53169.376.34$47,846
Jun 200605,68066.286.38$36,260
May 200606,19766.016.42$39,816
Apr 20063696,43664.397.36$71,132
Mar 200607,80256.707.08$55,261
Feb 200607,43557.597.75$57,630
Jan 200609,59860.598.93$85,742
Dec 200518110,69254.9413.42$153,382
Nov 200518816,47354.6910.59$184,704
Oct 2005027,58858.3413.80$380,597

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2023 — as filed, then multipliedworked
Condensate           183 bbl  × $ 68.96 =    $12,620
Gas                    0 Mcf  × $  2.26 =         $0

────────────────────────────────────────────────────
Month total                                  $12,620

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/216395 is the state's own key, not one this site invented.