Value, all time
$2.9 M
Jul 2006 – May 2026
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
239
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-03-01173158
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,134 bbl$154,601
GasProduction481,961 Mcf$2,721,526
Total$2,876,127

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6833, -100.2427. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.68331, -100.24267 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
12,600 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 12,600 ft.

Completions filed
Jul 2006
1 of 1 wells

1 well

42-21133569208912,600 ftJul 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (239)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

239 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 202557059.383.30$3,385
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 202303271.262.61$84
Nov 202302177.892.81$59
Oct 202313785.443.09$200
Sep 2023014389.042.74$391
Aug 2023018780.522.67$500
Jul 2023018474.852.64$486
Jun 2023020168.962.26$454
May 2023025870.622.23$575
Apr 2023021278.122.24$474
Mar 2023020672.852.39$493
Feb 2023041575.112.47$1,023
Jan 2023013576.533.39$457
Dec 2022034576.415.73$1,977
Nov 2022020085.005.65$1,129
Oct 2022027187.185.86$1,589
Sep 2022022084.888.16$1,796
Aug 2022028794.529.13$2,619
Jul 20220227101.587.54$1,712
Jun 20220154115.097.98$1,228
May 20220259109.378.43$2,184
Apr 20220199104.226.84$1,361
Mar 20220247108.885.08$1,254
Feb 2022014691.054.86$709
Jan 2022025381.844.54$1,148
Dec 2021036871.323.90$1,435
Nov 202107277.435.24$377
Oct 202104879.795.71$274
Sep 2021024869.865.35$1,327
Aug 2021080566.024.22$3,398
Jul 2021044370.783.98$1,764
Jun 2021027869.493.38$940
May 2021014163.483.02$425
Apr 2021023560.362.76$648
Mar 2021046561.302.72$1,263
Feb 202104557.805.55$250
Jan 2021030250.412.81$849
Dec 2020019144.642.68$511
Nov 2020035438.772.71$958
Oct 2020010736.972.48$265
Sep 2020020237.091.99$402
Aug 2020017639.982.39$420
Jul 2020026638.371.83$485
Jun 2020028034.901.69$473
May 2020020616.921.81$374
Apr 2020034414.751.80$621
Mar 2020016730.341.86$310
Feb 2020024649.881.98$487
Jan 2020020357.252.09$425
Dec 2019045959.012.30$1,058
Nov 2019032155.302.75$883
Oct 2019130153.472.42$781
Sep 201910127155.052.66$6,280
Aug 2019042053.112.30$968
Jul 2019044456.272.46$1,092
Jun 2019032852.782.49$817
May 2019032758.482.74$896
Apr 2019053462.632.75$1,469
Mar 2019053456.803.06$1,635
Feb 2019081550.852.79$2,276
Jan 201901,23046.033.23$3,971
Dec 2018043246.594.19$1,808
Nov 2018098352.934.24$4,165
Oct 2018012161.443.40$411
Sep 2018042659.543.11$1,324
Aug 2018064159.403.07$1,966
Jul 2018034165.142.93$1,000
Jun 2018047560.183.08$1,462
May 2018045665.382.90$1,323
Apr 2018049563.842.90$1,436
Mar 201816333661.222.79$10,915
Feb 2018033861.782.77$935
Jan 2018047862.874.01$1,916
Dec 2017019957.272.92$581
Nov 2017034555.423.12$1,076
Oct 2017019549.292.98$582
Sep 2017047547.523.09$1,466
Aug 2017044645.373.00$1,340
Jul 2017031043.873.09$957
Jun 2017034942.493.09$1,077
May 2017029245.373.26$953
Apr 201701847.933.21$58
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 2017045949.413.42$1,569
Dec 201601,24548.763.72$4,635
Nov 201601,32342.492.64$3,498
Oct 201601,32946.193.09$4,107
Sep 201601,27641.553.10$3,956
Aug 201601,23741.442.92$3,617
Jul 201601,28441.622.92$3,755
Jun 201601,25745.352.69$3,376
May 201601,34942.521.99$2,686
Apr 201601,34436.561.99$2,676
Mar 201601,50533.011.79$2,700
Feb 201601,41226.472.06$2,914
Jan 201601,57027.352.36$3,712
Dec 201501,46732.362.00$2,936
Nov 201501,55138.792.17$3,362
Oct 201501,58343.552.43$3,841
Sep 201501,46442.992.76$4,038
Aug 201501,47940.162.87$4,248
Jul 201501,45148.152.95$4,273
Jun 201501,49256.152.88$4,301
May 201501,62355.212.96$4,797
Apr 201501,62549.822.71$4,398
Mar 201501,66142.892.93$4,875
Feb 201501,57044.662.98$4,673
Jan 201501,60143.433.10$4,964
Dec 201401,79554.693.59$6,446
Nov 201401,78270.464.25$7,577
Oct 201401,77778.303.90$6,932
Sep 20141541,62086.164.05$19,822
Aug 201401,60589.394.04$6,476
Jul 201401,56996.564.18$6,558
Jun 201401,53898.164.74$7,285
May 201401,66294.734.73$7,856
Apr 201401,66695.944.81$8,012
Mar 201401,79995.895.06$9,097
Feb 201401,46997.406.19$9,096
Jan 201401,67990.404.86$8,161
Dec 201301,69291.824.35$7,368
Nov 201301,77988.853.74$6,650
Oct 201301,87897.423.78$7,098
Sep 201301,908104.113.72$7,093
Aug 201301,963104.253.52$6,915
Jul 201301,881102.523.72$6,993
Jun 201301,81994.403.93$7,155
May 201301,87194.834.15$7,763
Apr 201301,94593.964.28$8,330
Mar 201301,93393.623.91$7,564
Feb 201301,71491.233.42$5,862
Jan 201301,89191.603.42$6,467
Dec 201201,93086.773.42$6,601
Nov 201201,88686.953.62$6,837
Oct 201201,90689.383.40$6,480
Sep 20121861,95894.672.92$23,323
Aug 201201,96492.662.91$5,712
Jul 201201,95185.133.02$5,894
Jun 201201,94379.822.52$4,894
May 201202,01191.612.49$5,004
Apr 201202,052101.652.00$4,097
Mar 201202,229105.052.22$4,953
Feb 201202,037101.102.57$5,236
Jan 201202,18298.092.73$5,966
Dec 201102,01396.873.24$6,522
Nov 201102,38095.723.31$7,881
Oct 201102,32384.983.65$8,476
Sep 201102,14783.623.99$8,558
Aug 201101,99883.404.15$8,290
Jul 201102,17794.144.52$9,834
Jun 201102,16592.904.64$10,045
May 201102,36298.134.40$10,404
Apr 201102,289105.964.33$9,919
Mar 201102,39496.364.06$9,713
Feb 201101,87485.644.18$7,833
Jan 201102,50886.504.59$11,509
Dec 201002,54285.734.35$11,052
Nov 201002,51080.843.80$9,526
Oct 201002,70378.103.51$9,485
Sep 201002,60572.633.98$10,367
Aug 201002,79073.684.42$12,330
Jul 201002,84172.554.74$13,456
Jun 201002,74270.364.91$13,464
May 201002,83671.124.24$12,011
Apr 201002,75881.694.12$11,370
Mar 20101862,64478.394.39$26,184
Feb 201002,56173.585.44$13,938
Jan 201002,56674.365.96$15,304
Dec 200902,56271.445.48$14,049
Nov 200902,99274.593.75$11,224
Oct 200903,62272.544.11$14,887
Sep 200903,36565.543.06$10,313
Aug 200903,46267.423.22$11,142
Jul 200903,49261.133.46$12,098
Jun 200903,45466.163.90$13,453
May 20091914,00254.743.93$26,166
Apr 200903,95346.773.59$14,181
Mar 200903,91442.144.06$15,887
Feb 200903,39632.814.63$15,734
Jan 200903,97435.865.37$21,344
Dec 200803,59537.105.98$21,488
Nov 200804,00855.496.86$27,496
Oct 200804,45475.246.92$30,831
Sep 20081824,248101.767.88$51,982
Aug 200804,493114.228.48$38,114
Jul 200804,646131.0811.39$52,915
Jun 200804,664131.3313.03$60,784
May 200804,929123.1711.57$57,050
Apr 200804,916110.3110.45$51,396
Mar 200805,307101.909.66$51,287
Feb 200805,24592.538.77$46,002
Jan 200805,80290.388.21$47,610
Dec 200706,09188.337.30$44,476
Nov 200706,06491.677.29$44,217
Oct 20071796,53782.856.92$60,079
Sep 200706,55975.846.24$40,955
Aug 20071817,17769.066.39$58,346
Jul 200707,54370.906.39$48,184
Jun 200707,47262.007.55$56,402
May 200708,32858.747.85$65,344
Apr 200707,88959.617.81$61,575
Mar 200709,10956.927.30$66,514
Feb 20071919,25655.108.22$86,571
Jan 2007011,05550.306.73$74,365
Dec 2006012,32356.656.92$85,256
Nov 2006013,14454.207.62$100,124
Oct 2006014,25054.906.01$85,697
Sep 200618014,76560.085.04$85,189
Aug 200618122,47968.717.34$177,431
Jul 2006028,09069.376.34$178,168

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2025 — as filed, then multipliedworked
Condensate            57 bbl  × $ 59.38 =     $3,385
Gas                    0 Mcf  × $  3.30 =         $0

────────────────────────────────────────────────────
Month total                                   $3,385

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/218453 is the state's own key, not one this site invented.