DIXON, IRENE -48-

Operated by UNITED OIL & SHALE LLC (P-5 103207) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 219027District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.7 M
Jun 2006 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
240
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-01-12170785
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition4,652 bbl$361,936
GasProduction562,733 Mcf$3,351,992
Total$3,713,928

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.7016, -100.3704. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.70158, -100.37041 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
12,625 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 12,625 ft.

Completions filed
Jun 2006
1 of 1 wells

1 well

42-211334821048A12,625 ftJun 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (240)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

240 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 202385070.622.23$6,003
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20193362.632.75$196
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 201502,12155.212.96$6,269
Apr 201532,96349.822.71$8,169
Mar 201571,76742.892.93$5,486
Feb 2015757144.662.98$2,012
Jan 201502,28943.433.10$7,097
Dec 201422,48354.693.59$9,027
Nov 201401,45370.464.25$6,178
Oct 201401,71378.303.90$6,682
Sep 201401,65086.164.05$6,675
Aug 201401,83689.394.04$7,408
Jul 201401,81496.564.18$7,582
Jun 201401,62798.164.74$7,707
May 201401,58794.734.73$7,501
Apr 201401,74395.944.81$8,382
Mar 201402,58095.895.06$13,047
Feb 201401,24597.406.19$7,709
Jan 201401,56590.404.86$7,607
Dec 201301,33491.824.35$5,809
Nov 201301,52688.853.74$5,705
Oct 201301,57897.423.78$5,964
Sep 201301,435104.113.72$5,335
Aug 201301,704104.253.52$6,003
Jul 201301,671102.523.72$6,212
Jun 201331,38594.403.93$5,731
May 201331,65694.834.15$7,155
Apr 201351,51193.964.28$6,941
Mar 20131281,70393.623.91$18,647
Feb 201341,79991.233.42$6,517
Jan 201342,18291.603.42$7,829
Dec 201222,03086.773.42$7,116
Nov 201221,86786.953.62$6,942
Oct 201202,23889.383.40$7,608
Sep 201201794.672.92$50
Aug 201222,11592.662.91$6,336
Jul 20121172,16085.133.02$16,485
Jun 201222,02779.822.52$5,266
May 201222,24391.612.49$5,765
Apr 201213,880101.652.00$7,849
Mar 201232,336105.052.22$5,506
Feb 20121442,216101.102.57$20,254
Jan 2012382,36898.092.73$10,202
Dec 201102,57596.873.24$8,342
Nov 201142,61495.723.31$9,039
Oct 201142,88684.983.65$10,870
Sep 201162,83783.623.99$11,809
Aug 201142,82383.404.15$12,047
Jul 201153,00994.144.52$14,063
Jun 20111152,88792.904.64$24,079
May 201143,07498.134.40$13,933
Apr 201103,093105.964.33$13,403
Mar 201153,17996.364.06$13,380
Feb 201122,78985.644.18$11,829
Jan 20111773,40386.504.59$30,926
Dec 201073,40385.734.35$15,396
Nov 20101953,37880.843.80$28,584
Oct 2010103,60078.103.51$13,413
Sep 201043,38472.633.98$13,757
Aug 201033,61073.684.42$16,175
Jul 201043,76272.554.74$18,109
Jun 2010183,64270.364.91$19,150
May 2010173,75971.124.24$17,129
Apr 2010183,82381.694.12$17,231
Mar 20102113,94578.394.39$33,854
Feb 2010313,77273.585.44$22,810
Jan 2010194,14474.365.96$26,128
Dec 2009224,10471.445.48$24,077
Nov 2009164,35974.593.75$17,546
Oct 200954,57372.544.11$19,159
Sep 20091824,60165.543.06$26,029
Aug 200904,97967.423.22$16,025
Jul 2009125,10961.133.46$18,434
Jun 2009105,30966.163.90$21,340
May 20091725,24354.743.93$29,998
Apr 2009164,63446.773.59$17,373
Mar 200993,81642.144.06$15,868
Feb 200964,22932.814.63$19,790
Jan 20091954,03935.865.37$28,686
Dec 200852,88837.105.98$17,447
Nov 20081843,90355.496.86$36,986
Oct 20081834,89975.246.92$47,680
Sep 2008115,197101.767.88$42,057
Aug 20081885,419114.228.48$67,443
Jul 20081845,543131.0811.39$87,250
Jun 20081240131.3313.03$2,097
May 20081855,801123.1711.57$89,929
Apr 200895,832110.3110.45$61,966
Mar 20082036,146101.909.66$80,081
Feb 2008175,66692.538.77$51,267
Jan 2008156,47690.388.21$54,496
Dec 2007277,39988.337.30$56,412
Nov 200777,68191.677.29$56,649
Oct 2007138,39582.856.92$59,187
Sep 20071518,74775.846.24$66,070
Aug 200799,62669.066.39$62,112
Jul 2007109,66270.906.39$62,429
Jun 200716210,28962.007.55$87,710
May 20072211,14358.747.85$88,723
Apr 20073810,79259.617.81$86,499
Mar 20073410,49256.927.30$78,548
Feb 200715010,25955.108.22$92,553
Jan 2007612,82050.306.73$86,540
Dec 200615815,05956.656.92$113,135
Nov 200617415,74654.207.62$129,376
Oct 20063819,56154.906.01$119,722
Sep 200615422,75860.085.04$123,889
Aug 200612742,00768.717.34$317,054
Jul 20067461,98569.376.34$398,289
Jun 20062712566.286.38$2,588

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2023 — as filed, then multipliedworked
Condensate            85 bbl  × $ 70.62 =     $6,003
Gas                    0 Mcf  × $  2.23 =         $0

────────────────────────────────────────────────────
Month total                                   $6,003

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/219027 is the state's own key, not one this site invented.