JONES

Operated by COURSON OIL & GAS, INC. (P-5 182785) in the CANADIAN, SE (DOUGLAS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 219075District 10Field 15217250CondensateGasSaveExport
Value, all time
$1.2 M
Aug 2006 – May 2026
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
238
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 419 leases and 430 wells, and the rule below applies to all of them.

Discovered
1972-08-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 160 acres.

The Commission's schedule remark for this field reads: COMBINED W/HUMPHREYS (DOUGLAS) 9/81 CARRIED AS CANADIAN,SE (DOUGLA

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition547 bbl$29,625
GasProduction247,683 Mcf$1,167,125
Total$1,196,750

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.9534, -100.1503. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.95337, -100.15034 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,453 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,453 ft.

Completions filed
Aug 2006
1 of 1 wells

1 well

42-2113364027,453 ftAug 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (238)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

238 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 202501066.743.32$33
Jun 2025069066.483.13$2,159
May 2025074960.553.23$2,421
Apr 2025087562.363.54$3,100
Mar 2025043567.704.27$1,857
Feb 2025031070.884.34$1,346
Jan 2025023374.324.28$997
Dec 2024066568.993.12$2,076
Nov 2024023169.052.20$508
Oct 2024058271.372.28$1,328
Sep 2024023969.612.36$565
Aug 2024040975.632.06$844
Jul 2024044779.932.15$960
Jun 2024053778.082.63$1,414
May 2024064878.812.20$1,425
Apr 2024052484.451.66$869
Mar 2024059880.301.55$924
Feb 2024052976.091.78$944
Jan 2024068073.023.30$2,242
Dec 2023060771.262.61$1,585
Nov 2023057277.892.81$1,606
Oct 2023057085.443.09$1,760
Sep 2023047089.042.74$1,285
Aug 2023036680.522.67$978
Jul 2023037174.852.64$980
Jun 2023055268.962.26$1,247
May 2023058970.622.23$1,312
Apr 2023028878.122.24$644
Mar 2023023572.852.39$562
Feb 2023053675.112.47$1,322
Jan 2023050676.533.39$1,714
Dec 2022032976.415.73$1,885
Nov 2022022185.005.65$1,248
Oct 2022019687.185.86$1,149
Sep 2022018084.888.16$1,469
Aug 2022021894.529.13$1,990
Jul 20220398101.587.54$3,002
Jun 20220511115.097.98$4,076
May 20220638109.378.43$5,380
Apr 20220641104.226.84$4,383
Mar 20220702108.885.08$3,564
Feb 2022064091.054.86$3,110
Jan 2022077881.844.54$3,530
Dec 2021076771.323.90$2,991
Nov 2021073477.435.24$3,844
Oct 2021071679.795.71$4,091
Sep 2021034869.865.35$1,862
Aug 2021052466.024.22$2,212
Jul 2021058670.783.98$2,334
Jun 2021061369.493.38$2,072
May 2021063163.483.02$1,904
Apr 2021066260.362.76$1,826
Mar 2021071161.302.72$1,932
Feb 202116860457.805.55$13,061
Jan 2021072950.412.81$2,049
Dec 2020074744.642.68$1,999
Nov 2020065438.772.71$1,770
Oct 2020072936.972.48$1,807
Sep 2020069337.091.99$1,380
Aug 2020070139.982.39$1,672
Jul 2020070838.371.83$1,292
Jun 2020069534.901.69$1,175
May 2020043216.921.81$784
Apr 2020062514.751.80$1,128
Mar 2020088430.341.86$1,641
Feb 2020081049.881.98$1,604
Jan 2020087757.252.09$1,837
Dec 2019083659.012.30$1,926
Nov 2019077055.302.75$2,118
Oct 2019078153.472.42$1,889
Sep 2019085255.052.66$2,264
Aug 2019084353.112.30$1,943
Jul 2019085656.272.46$2,106
Jun 2019075052.782.49$1,868
May 2019088958.482.74$2,436
Apr 2019087262.632.75$2,399
Mar 2019075156.803.06$2,300
Feb 2019077550.852.79$2,164
Jan 2019074146.033.23$2,392
Dec 2018085146.594.19$3,562
Nov 2018086452.934.24$3,661
Oct 2018088961.443.40$3,021
Sep 2018086659.543.11$2,692
Aug 2018091159.403.07$2,794
Jul 2018085965.142.93$2,518
Jun 2018084760.183.08$2,606
May 2018085565.382.90$2,480
Apr 2018084963.842.90$2,463
Mar 2018080761.222.79$2,249
Feb 2018075861.782.77$2,097
Jan 2018067262.874.01$2,694
Dec 2017090957.272.92$2,656
Nov 2017096555.423.12$3,009
Oct 2017096349.292.98$2,873
Sep 2017093047.523.09$2,871
Aug 2017091245.373.00$2,740
Jul 2017091343.873.09$2,819
Jun 2017085742.493.09$2,646
May 2017088045.373.26$2,872
Apr 2017085847.933.21$2,756
Mar 2017099046.772.98$2,954
Feb 2017074650.452.95$2,203
Jan 2017075449.413.42$2,578
Dec 2016090448.763.72$3,365
Nov 2016097642.492.64$2,581
Oct 2016088446.193.09$2,732
Sep 2016081341.553.10$2,521
Aug 201601,01041.442.92$2,954
Jul 2016098541.622.92$2,880
Jun 201601,01045.352.69$2,713
May 2016087942.521.99$1,750
Apr 2016097836.561.99$1,947
Mar 20161911,02033.011.79$8,135
Feb 2016094626.472.06$1,952
Jan 2016096627.352.36$2,284
Dec 2015091332.362.00$1,827
Nov 2015094138.792.17$2,039
Oct 201501,04843.552.43$2,543
Sep 2015185342.992.76$2,396
Aug 2015098640.162.87$2,832
Jul 2015098148.152.95$2,889
Jun 2015093256.152.88$2,687
May 2015098555.212.96$2,911
Apr 2015098749.822.71$2,671
Mar 2015092842.892.93$2,723
Feb 2015069744.662.98$2,074
Jan 2015082343.433.10$2,552
Dec 2014092054.693.59$3,304
Nov 2014098170.464.25$4,171
Oct 201401,03178.303.90$4,022
Sep 201401,00786.164.05$4,074
Aug 201401,06889.394.04$4,310
Jul 201401,06796.564.18$4,460
Jun 201401,00598.164.74$4,761
May 2014096294.734.73$4,547
Apr 2014096995.944.81$4,660
Mar 2014062395.895.06$3,150
Feb 2014070897.406.19$4,384
Jan 2014086790.404.86$4,214
Dec 2013092091.824.35$4,006
Nov 2013098888.853.74$3,693
Oct 201301,00697.423.78$3,802
Sep 20130650104.113.72$2,417
Aug 201301,054104.253.52$3,713
Jul 201301,079102.523.72$4,011
Jun 201301,00094.403.93$3,933
May 2013078794.834.15$3,265
Apr 201301,07493.964.28$4,600
Mar 201301,09693.623.91$4,289
Feb 2013086891.233.42$2,968
Jan 201301,10291.603.42$3,769
Dec 201201,12986.773.42$3,861
Nov 201201,16186.953.62$4,209
Oct 201201,28289.383.40$4,358
Sep 201201,17794.672.92$3,435
Aug 201201,26192.662.91$3,667
Jul 201201,25685.133.02$3,794
Jun 201201,31079.822.52$3,300
May 2012061191.612.49$1,520
Apr 20120367101.652.00$733
Mar 20120778105.052.22$1,729
Feb 20120739101.102.57$1,899
Jan 2012082998.092.73$2,267
Dec 201101,22396.873.24$3,962
Nov 201101,42095.723.31$4,702
Oct 201101,34584.983.65$4,907
Sep 201101,29983.623.99$5,178
Aug 201101,36583.404.15$5,664
Jul 201101,17694.144.52$5,312
Jun 201101,22992.904.64$5,702
May 201101,78898.134.40$7,876
Apr 2011081105.964.33$351
Mar 201101,17996.364.06$4,784
Feb 201101,31085.644.18$5,476
Jan 201101,47186.504.59$6,750
Dec 201001,43385.734.35$6,230
Nov 201001,50780.843.80$5,720
Oct 201001,52178.103.51$5,337
Sep 201001,50472.633.98$5,985
Aug 201001,63673.684.42$7,230
Jul 20101871,68172.554.74$21,529
Jun 201001,48970.364.91$7,312
May 201001,45671.124.24$6,166
Apr 201001,47481.694.12$6,077
Mar 201001,61578.394.39$7,088
Feb 201001,34373.585.44$7,309
Jan 201001,68774.365.96$10,061
Dec 200901,52971.445.48$8,385
Nov 200901,59374.593.75$5,976
Oct 200901,64472.544.11$6,757
Sep 200901,40065.543.06$4,291
Aug 200901,58367.423.22$5,095
Jul 200902,09761.133.46$7,265
Jun 200901,39866.163.90$5,445
May 200901,59454.743.93$6,258
Apr 200901,88846.773.59$6,773
Mar 200901,69742.144.06$6,888
Feb 200901,66332.814.63$7,705
Jan 200901,62135.865.37$8,706
Dec 200801,90337.105.98$11,375
Nov 200801,69255.496.86$11,608
Oct 200802,02775.246.92$14,031
Sep 200802,026101.767.88$15,959
Aug 200802,023114.228.48$17,161
Jul 200801,858131.0811.39$21,162
Jun 200802,148131.3313.03$27,994
May 200801,894123.1711.57$21,922
Apr 200802,251110.3110.45$23,534
Mar 200802,147101.909.66$20,749
Feb 200802,31092.538.77$20,260
Jan 200802,02890.388.21$16,641
Dec 200702,55388.337.30$18,642
Nov 200702,08491.677.29$15,196
Oct 200702,53282.856.92$17,526
Sep 200702,11775.846.24$13,219
Aug 200702,17369.066.39$13,881
Jul 200702,53670.906.39$16,200
Jun 200702,42262.007.55$18,282
May 200702,60458.747.85$20,432
Apr 200702,80659.617.81$21,901
Mar 200702,84856.927.30$20,796
Feb 200702,42655.108.22$19,932
Jan 200702,86550.306.73$19,272
Dec 200603,20256.656.92$22,153
Nov 200603,32254.207.62$25,305
Oct 200603,89654.906.01$23,430
Sep 200604,92060.085.04$24,783
Aug 2006084868.717.34$6,224

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2025 — as filed, then multipliedworked
Condensate             0 bbl  × $ 66.74 =         $0
Gas                   10 Mcf  × $  3.32 =        $33

────────────────────────────────────────────────────
Month total                                      $33

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/219075 is the state's own key, not one this site invented.